Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC | ₹12.8 L Quoted ₹13.4 L | L1 | Accepted-AOC LOWEST |
| 2 | L2₹13.8 LRejected-Finance | ₹13.8 L | L2 | Rejected-Finance SECOND LOWEST |
| 3 | L3₹14.5 LRejected-Finance | ₹14.5 L | L3 | Rejected-Finance HIGHEST |
| Sl No | Description | Qty | Unit | Beacon Logistics and Infrastructure L2 | Sri Transways L1 | VARGHESE M C L3 |
|---|---|---|---|---|---|---|
| 1.00 | Hiring charges for the vehicle which shall include the cost of the driver (wages as per Minimum wages Act), fuel, consumables such as lubricants, tyres, and battery, as well as repairs and maintenance, taxes, insurance, and all other related expenses, on a contract basis at RPIPL, Irapuram, as per the tender. FIRST YEAR | 12 | MONTH | 55,500 ₹6.7 L | 54,000 ₹6.5 L | 59,000 ₹7.1 L |
| 1.01 | Additional rate for excess kilometers beyond the specified 7,500 km shall be calculated for payment based on a six-month block period only, i.e., the rate per kilometer for distance run in excess of 7,500 km. FIRST YEAR | 300 | KM | 13 ₹3,900 | 12 ₹3,600 | 20 ₹6,000 |
| 1.02 | Additional Rate for Drivers extra hours of work beyond 2160 hours in six months, which is to be calculated in per hour above 2160 hours within a block period of 6 months FIRST YEAR | 100 | HOURS | 150 ₹15,000 | 140 ₹14,000 | 30 ₹3,000 |
| 2.00 | Hiring charges for the vehicle shall include the cost of the driver (wages as per labour rules), fuel, consumables such as lubricants, tyres, and battery, as well as repairs and maintenance, taxes, insurance, and all other related expenses, on a contract basis at RPIPL, Irapuram, as per the tender. SECOND YEAR | 12 | MONTH | 56,000 ₹6.7 L | 54,500 ₹6.5 L | 60,000 ₹7.2 L |
| 2.01 | Additional rate for excess kilometers beyond the specified 7,500 km shall be calculated for payment based on a six-month block period only, i.e., the rate per kilometer for distance run in excess of 7,500 km. SECOND YEAR | 300 | KM | 13 ₹3,900 | 12 ₹3,600 | 20 ₹6,000 |
| 2.02 | Additional Rate for Drivers extra hours of work beyond 2160 hours in six months, which is to be calculated in per hour above 2160 hours within a block period of 6 months SECOND YEAR | 100 | HOURS | 150 ₹15,000 | 140 ₹14,000 | 30 ₹3,000 |
Tender Value
Refer Docs
EMD Value
₹27,700
Closing Date
13 Jan 2026, 2:00 pmClosed
Managing Director
Managing Director, RPIPL 2A Kautileeyam Valayanchirangara PO Irapuram Ernakulam Kerala Pin 683 556
Tender for Hiring of Vehicle with Driver on contract basis at Rubber Park India Pvt Ltd IrapuramErnakulam Dst
2025_RPI_821153_3
RP/ADM/008/2025
Open Tender
Miscellaneous Services
730 days
Rubber Park Irapuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,620
₹27,700
Rubber Park Irapuram
11 Feb 2026
30 Dec 2025
14 Jan 2026
30 Dec 2025
13 Jan 2026
6 Jan 2026
30 Dec 2025 - 1 Jan 2026
2 Jan 2026
Hiring charges for the vehicle which shall include the cost of the driver (wages as per Minimum wages Act), fuel, consumables such as lubricants, tyres, and battery, as well as repairs and maintenance, taxes, insurance, and all other related expenses, on a contract basis at RPIPL, Irapuram, as per the tender. FIRST YEAR
Additional rate for excess kilometers beyond the specified 7,500 km shall be calculated for payment based on a six-month block period only, i.e., the rate per kilometer for distance run in excess of 7,500 km. FIRST YEAR
Additional Rate for Drivers extra hours of work beyond 2160 hours in six months, which is to be calculated in per hour above 2160 hours within a block period of 6 months FIRST YEAR
Hiring charges for the vehicle shall include the cost of the driver (wages as per labour rules), fuel, consumables such as lubricants, tyres, and battery, as well as repairs and maintenance, taxes, insurance, and all other related expenses, on a contract basis at RPIPL, Irapuram, as per the tender. SECOND YEAR
Additional rate for excess kilometers beyond the specified 7,500 km shall be calculated for payment based on a six-month block period only, i.e., the rate per kilometer for distance run in excess of 7,500 km. SECOND YEAR
Additional Rate for Drivers extra hours of work beyond 2160 hours in six months, which is to be calculated in per hour above 2160 hours within a block period of 6 months SECOND YEAR
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
ReTend2Notice.pdf
Other Document • 0.63 MB
ReTender2.pdf
Tender Documents • 1.17 MB
BOQ_1382456.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid