Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
7 Feb 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager (SRC-Com)
Hindustan Shipyard Ltd, Visakhapatnam
Steel Outfit Works on MV Vishva Vijetha.
2022_HSL_88806_1
20 / 22002 / STEEL OUTFIT WORKS / 197 / 2021-22
Open Tender
Miscellaneous Services
Turn-key
15 days
Hindustan Shipyard Ltd, Visakhapatnam
Please refer Tender documents.
5 documents required · 5 mandatory
₹525
Yes
Hindustan Shipyard Ltd, Visakhapatnam
₹10,000
Yes
10 Feb 2022
29 Jan 2022
7 Feb 2022
29 Jan 2022
7 Feb 2022
29 Jan 2022
120 days
Amount
SCOPE OF WORK FOR ROUTINES ON BOOBY HATCHES, ROLLERS, HATCH COAMING STAYS ON MV VISWA VIJETHA
TO OPEN AND OVERHAUL 4 NOS EACH HATCH ROLLERS ON ALL 5 HATCH COVERS. BEARINGS TO BE RENEWED(BEARING SHIP SUPPLY) . TOTAL 20 NOS TRACKS FOR ALL 05 NOS HATCH PONTOONS' ROLLERS TO BE INSPECTED FOR UNEVEN-NESS.
HATCH COAMING STAY ON MAIN DECK AND CROSS DECK , TOES OF STAY THINNED DOWN . SAME TO CROP AND RENEW SIZE LxBxT - 300mmx250mmx15mm . (QTY - 140 NOS)
TO INSPECT ALL HEAVY WEATHER LOCKING ARRANGEMENT OF NO.3 HEAVY WEATHER BALLAST TANK, AND IF REQUIRED FABRICATE AND WELD AS PER ORIGINAL. TOTAL :4 NOS
TO CHECK AND INSPECT ALL 05 CARGO HOLDS FWD & AFT BOOBY HATCH RUBBER PACKING, AND TO INSPECT RETAINING CHANNEL,BUTTERFLY NUTS & RENEW. RENEWED RUBBER PACKING, CHANNEL, SPRING ARRANGEMENT TO BE OVERHAULED / RENEWED TO BE CHANGED LOCKING ARRANGEMENT ( 60X55MM, 120X95MM) TO BE MADE FOR ALL BOOBY.
TO OVERHAUL HATCH SECURING LOCKING ARRANGEMENT OF ALL 05 CARGO HOLDS TOTAL 20 NOS
NOTE: ON COMPLETION OF REPAIRS, HATCH COVERS TO BE PRESENTED FOR SATISFACTORY OPERATION AND WEATHER TIGHTNESS TO OWNERS/ IRS DNV SURVEYORS. CHALK TEST TO BE PROVED.
TO RENEW DRAIN CHANNEL OF ALL HATCH COVER
HATCH CLEATS SUPPORTS TO BE ATTENDED/RENEWED
TO RENEW RETAINING CHANNEL OF BOOBY HATCH ALONGWITH RUBBER PACKING
RUBBER PACKING, SPRING ARRANGEMENT, DOG HANDLES ETC., OF BOOBY HATCHES TO BE PROCURED AND INSTALLATION TO BE CONSIDERED UNDER CONTRACTOR'S SCOPE ONLY.
CONSUMABLES / MATERIAL:For executing of the above mentioned jobs, Contractor has to procure, supply all items, material and fitted in its place. Contractor has to quote lumpsum cost for materials / consumables for entire SoW (S.No.1 to S.No.11). The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BoQ" for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (S.No.12) against third party / OEM invoice.
Tanks fabrication on Turnkey Basis
TO FABRICATE AND FIT TANKS FOR STORAGE OF HYDRUALIC OIL( APPROX. 2 M3 CAPACITY) WITH INLET,OULLET ,VENT,DRAIN AND WITH GAUAGE ON DECK.
TO CLEAN COLLECTING TANKS VENT CHAMBER ( 2 NOS) IN THE FUNNEL . TANK VENT DAMAGED WIRE MESH TO RENEW . MATL SS, . AREA OF MESH:- 04 M2
All jobs with materials like pipes,vents,guage glass,cocks,end fittings,rubber packing,manhole studs,wire mesh( material SS) ,etc to be considered in contractors Scope
CONSUMABLES / MATERIAL: For executing of the above mentioned jobs, Contractor has to procure, supply all items, material and fitted in its place. Contractor has to quote lumpsum cost for materials / consumables for entire SoW (S.No.13 to S.No.16 ). The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BoQ" for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (S.No.17) against third party / OEM invoice.
OUTFIT WORKS ON CRANES
RUBBER PACKING OF OPERATORS CABIN DOOR, SIDE ACCESS DOOR TO BE RENEWED AS PER EXISTING SAMPLE OF ALL 4 CRANES ( ESTIMATION: 40MTRS) - All materials like Rubber packing,Nut and bolts,screws,frame etc are in Contractors Scope.
CRANE SAFETY CAGE AND PLATFORM TO BE RENEWED FOR ALL FOUR CRANES,SEMI CIRCLE,DIA-0.5 MTR,BREADTH-50MM,T-4MM,LENGTH-1.8 MTR. - All Materials like fasterners, rubber packing,grating, angles, chequered plates, Pipes etc are in Contractors Scope.
CORRODED AND THINNED DOWN RAILINGS AND PLATFORM GIVEN ON ALL FOUR CRANE COLUMN TO BE CROPPED AND RENEWED APPROX DIA 10 MM - All Materials like fasterners, rubber packing,grating, angles, chequered plates, Pipes etc are in Contractors Scope.
NO.1 & 2 CRANES VERTICAL LADDER GUARD (OUTSIDE) TO BE CUT/CROP & RENEW. [LENGTH=4M] (3.1M+90CM) - All materials like flat bars,Square rods , Railing pipes ,etc are in contractors Scope
CRANE PLATFORM(SQUARE BAR 20MM ) & RAILINGS 20MM DIA OF ALL O4 CRANES TO BE CUT/CROP & RENEW. - All materials like Square Rods,Flat Bars, Railing Pipes ,etc are in contractors Scope.
TO FABRICATE PLATFORMS FOR ALL 04 CRANES NEAR SLEWING BEARING - Total Platform material like Square rods,gratings,flat bars,etc are in contractors scope.
CONSUMABLES / MATERIAL:For executing of the above mentioned jobs, Contractor has to procure, supply all items, material and fitted in its place. Contractor has to quote lumpsum cost for materials / consumables for entire SoW (S.No.18 to S.No. 24). The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BoQ" for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (S.No.25) against third party / OEM invoice.
PROVISION CRANES - ER OVERHEAD CRANE DAVITS
PROVISION CRANE (MONO RAIL) TRACKWAY TEETH DAMAGED. DAMAGED TEETH TO RENEW OR TO BUILD UP WITH APPROVED MATERIAL. - Necessary staging to be arranged and carryout above job.All machining assistance, drilling , fabrication of teeth etc to be considered under contractors scope. Monorail operation to be shown to SS to their satisfaction.
CARGO CRANE BOOM RESTING AREA, CHEQURRED PLATE TO RENEW . SIZE LBT 1m x 0.5m x 6mm - Material ; Chequered Plates, flat bars,angles ,etc are in contractors scope.
CONSUMABLES / MATERIAL:For executing of the above mentioned jobs, Contractor has to procure, supply all items, material and fitted in its place. Contractor has to quote lumpsum cost for materials / consumables for entire SoW (S.No.26to S.No.28). The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BoQ" for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (S.No.29) against third party / OEM invoice.
VENKATESWARA ENGINEERING WORKS
BIJITH ENGINEERING WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .