Loading…
Loading…
Tender Value
₹13.1 Cr
EMD Value
₹9.8 L
Closing Date
25 Aug 2026, 6:00 pm
Chief Engineer Project Shivalik
HQ CE (P) Shivalik Lal Tappad, Majrigrant Haridwar Dehradun road 248140
SUPPLY STACKING OF STONE AGGREGATES 26PT5 MM 22.4MM 20MM 13PT2MM 11PT2MM 10MM 6PT7 MM COARSE SAND FOR SURF AND EDGE BLOCK WKS FROM KM 9PT125 TO KM 23PT425 ON GELDUNG NITIPASS ROAD 75 RCC 21 TF SHIVALIK UTTARAKHAND
2026_BRO_782302_1
NIT-13-2026-27
Open Tender
Civil Works
Item Rate
300 days
GELDUNG NITIPASS ROAD UTTARAKHAND
As per tender documents
8 documents required · 8 mandatory
₹0
₹9.8 L
Yes
HQ CE (P) Shivalik Lal Tappad, Majrigrant
1 Aug 2026
1 Aug 2026
31 Aug 2026
3 Aug 2026
25 Aug 2026
18 Aug 2026
3 Aug 2026 - 11 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Between Altitude 4201-5400 mtr | |||||
| 1.01 | Supply, conveyance, unloading and stacking of Stone Metal 26.5 mm as component material for surfacing works, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable stacked quantity after applicable material-wise void deduction. | 3,716 | Cum | - | - |
| 1.02 | Supply, conveyance, unloading and stacking of Stone Chips 22.4 mm as component material for Surfacing works, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable stacked quantity after applicable material-wise void deduction. | 1,646 | Cum | - | - |
| 1.03 | Supply and stacking of net quantity of Stone Chips 20 mm conforming to MoRTH Specifications, Special Conditions, Particular Specifications and relevant IS/IRC codes, complete all as specified and directed. Net payable stacked quantity after applicable material-wise void deduction. | 219 | Cum | - | - |
| 1.04 | Supply, conveyance, unloading and stacking of Stone Chips 13.2 mm as component material for surfacing works, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable stacked quantity after applicable material-wise void deduction. | 4,894 | Cum | - | - |
| 1.05 | Supply, conveyance, unloading and stacking of Stone Chips 11.2 mm as component material for surfacing works, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable stacked quantity after applicable material-wise void deduction. | 1,054 | Cum | - | - |
| 1.06 | Supply and stacking of net quantity of Stone Chips 10 mm conforming to MoRTH Specifications, Special Conditions, Particular Specifications and relevant IS/IRC codes, complete all as specified and directed. Net payable stacked quantity after applicable material-wise void deduction. | 109 | Cum | - | - |
| 1.07 | Supply, conveyance, unloading and stacking of Stone Chips 6.7 mm as component material for surfacing works, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable stacked quantity after applicable material-wise void deduction. | 8,226 | Cum | - | - |
| 1.08 | Supply and stacking of net quantity of Coarse Sand conforming to MoRTH Specifications, Special Conditions, Particular Specifications and relevant IS/IRC codes, complete all as specified and directed. Net payable stacked quantity after applicable material-wise void deduction. | 8,141 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
TCAL.pdf
Additional Documents • 0.12 MB
Tender.pdf
Tender Documents • 0.58 MB
IPact13.pdf
Additional Documents • 0.13 MB
BOQ_876424.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].