| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 CrAccepted-AOC STREET NO 11 SECTOR NO 04 TILAK NAGAR SAGAR ROAD BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | ₹10.4 Cr | L1 | Accepted-AOC Being Lowest Tenderer |
| 2 | L2₹10.5 Cr+₹7.1 L (0.68%)Rejected-Finance | ₹10.5 Cr+₹7.1 L (0.68%) | L2 | Rejected-Finance Being other than lowest tenderer |
| 3 | L3₹10.5 Cr+₹11.2 L (1.07%)Rejected-Finance 0 KISHANI KISHANI KISHANI MAINPURI UTTAR PRADESH 205001 | MAINPURI | UTTAR PRADESH | 205001 | ₹10.5 Cr+₹11.2 L (1.07%) | L3 | Rejected-Finance Being other than lowest tenderer |
| 4 | L4₹10.7 Cr+₹26.8 L (2.57%)Rejected-Finance 103 HARIAKSH PLAZA HOSPITAL ROAD BHUJ KUTCH GUIARAT 370001 | BHUJ | KUTCH | GUJARAT | 370001 | ₹10.7 Cr+₹26.8 L (2.57%) | L4 | Rejected-Finance Being other than lowest tenderer |
| 5 | L5₹11.7 Cr+₹1.2 Cr (11.8%)Rejected-Finance | ₹11.7 Cr+₹1.2 Cr (11.8%) | L5 | Rejected-Finance Being other than lowest tenderer |
| Sl No | Description | Qty | Unit | SHREE GURUKRUPA CONSTRUCTION CO. L5 | M/s. Mohandas V Rajani L6 | ANANYA ENTERPRISES L3 | M/s Matadeen Ramchandra Agarwal L2 | Vijay Construction Co L4 | Hi Tech Transpower Pvt Ltd L7 | r.s.jain & sons L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 9,25,00,000 ₹9,25,00,000 | 8,95,00,000 ₹8,95,00,000 | 7,90,92,090 ₹7,90,92,090 | 7,92,00,000 ₹7,92,00,000 | 8,11,00,000 ₹8,11,00,000 | 8,50,83,900 ₹8,50,83,900 | 7,90,00,000 ₹7,90,00,000 Lowest |
| 2.00 | Lump sum price worked out by the contractor for "SITE CLEARANCE, EXCAVATION & EARTH WORK" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 6,45,000 ₹6,45,000 | 5,28,635.33 ₹5,28,635.33 | 9,45,239.49 ₹9,45,239.49 | 7,20,000 ₹7,20,000 | 9,40,000 ₹9,40,000 | 10,18,380 ₹10,18,380 | 5,19,500 ₹5,19,500 Lowest |
| 3.00 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION WORKS" as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 15,50,000 ₹15,50,000 | 12,89,555.81 ₹12,89,555.81 Lowest | 14,32,839.79 ₹14,32,839.79 | 14,40,000 ₹14,40,000 | 20,00,000 ₹20,00,000 | 36,63,792 ₹36,63,792 | 17,50,000 ₹17,50,000 |
| 4.00 | Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION " as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 50,00,000 ₹50,00,000 | 43,58,975.34 ₹43,58,975.34 | 42,73,505.23 ₹42,73,505.23 Lowest | 50,40,000 ₹50,40,000 | 60,46,000 ₹60,46,000 | 1,10,13,777 ₹1,10,13,777 | 55,00,000 ₹55,00,000 |
| 5.00 | Lump sum price worked out by the contractor for "ROAD/PATH /CULVERT WORKS" as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 1,00,00,000 ₹1,00,00,000 Lowest | 1,51,48,794.06 ₹1,51,48,794.06 | 1,08,18,260.66 ₹1,08,18,260.66 | 1,17,00,000 ₹1,17,00,000 | 1,07,00,000 ₹1,07,00,000 | 1,78,43,533 ₹1,78,43,533 | 1,08,18,260 ₹1,08,18,260 |
| 6.00 | Lump sum price worked out by the contractor for "AREA DRAINAGE WORKS" as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES | 1 | LUMP SUM | 7,00,000 ₹7,00,000 Lowest | 9,99,006.62 ₹9,99,006.62 | 12,56,059.04 ₹12,56,059.04 | 13,50,000 ₹13,50,000 | 9,33,000 ₹9,33,000 | 20,60,028 ₹20,60,028 | 9,45,000 ₹9,45,000 |
| 7.00 | Lump sum price worked out by the contractor for " COMPOUND WALL , FENCING AND STEEL GATE WORKS" as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 19,70,000 ₹19,70,000 Lowest | 25,32,943.06 ₹25,32,943.06 | 22,30,807.38 ₹22,30,807.38 | 24,30,000 ₹24,30,000 | 24,87,000 ₹24,87,000 | 34,61,764 ₹34,61,764 | 23,39,000 ₹23,39,000 |
| 8.00 | Lump sum price worked out by the contractor for "LIGHT PROTECTION WORKS" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 5,15,000 ₹5,15,000 | 5,45,396.2 ₹5,45,396.2 | 5,45,396.2 ₹5,45,396.2 | 7,20,000 ₹7,20,000 | 4,75,645 ₹4,75,645 Lowest | 34,55,085 ₹34,55,085 | 5,00,000 ₹5,00,000 |
| 9.00Sch 'A' PART-IX (MISCELLANEOUS ITEMS) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items which categorically includes for same shall be measured and paid separately under respective schedule. | ||||||||||
| 10.00 | INTERNAL ELECTRIFICATION WORKS
S&F Industrial heavy duty Wall mounted fan 750mm sweep, 5 star rated with speed regulater,180 degree rotated , 1440 rpm, double ball bearing ,all including connection with single core PVC insulated but unsheathed, FRLS cable with multistranded copper conductors IS 694 marked, from ceiling rose to fan complete all as specified and directed.
Make:Crompton Energion HS or equivalent in Orient / Almonard/USHA /Havells | 31 | EACH | 16,300 ₹5,05,300 | 17,200 ₹5,33,200 | 21,000 ₹6,51,000 | 450 ₹13,950 Lowest | 13,500 ₹4,18,500 | 25,783 ₹7,99,273 | 13,500 ₹4,18,500 |
Tender Value
₹9.8 Cr
EMD Value
₹8.1 L
Closing Date
23 Dec 2025, 6:00 pmClosed
Chief Engineer Jodhpur Zone
HQ Chief Engineer Jodhpur Zone Opp to Military Hospital Rasala Road Jodhpur
PROVISION OF PARKING SHED AT BHUJ MILITARY STATION
2025_MES_742286_1
800623/BHUJ/E8
Open Tender
Civil Works
Lump-sum
610 days
GE (A) Bhuj
PROVISION OF PARKING SHED AT BHUJ MILITARY STATION
8 documents required · 8 mandatory
₹3,000
Yes
GE (A) Bhuj
₹8.1 L
Yes
11 May 2026
1 Dec 2025
30 Dec 2025
1 Dec 2025
23 Dec 2025
16 Dec 2025
2 Dec 2025 - 9 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | - | - |
| 2 | Lump sum price worked out by the contractor for "SITE CLEARANCE, EXCAVATION & EARTH WORK" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | - | - |
| 4 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION WORKS" as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | - | - |
| 5 | Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION " as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | - | - |
| 6 | Lump sum price worked out by the contractor for "ROAD/PATH /CULVERT WORKS" as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | - | - |
| 7 | Lump sum price worked out by the contractor for "AREA DRAINAGE WORKS" as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES | 1 | LUMP SUM | - | - |
| 8 | Lump sum price worked out by the contractor for " COMPOUND WALL , FENCING AND STEEL GATE WORKS" as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | - | - |
| - | Lump sum price worked out by the contractor for "LIGHT PROTECTION WORKS" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | - | - |
| 10 | Sch 'A' PART-IX (MISCELLANEOUS ITEMS) Notes:
(i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only.
(ii) Excavation and earth work except for the items which categorically includes for same shall be measured and paid separately under respective schedule. | - | - | - | - |
| 11 | SITE CLEARANCE, EXCAVATION & EARTH WORK
Supply only approved earth obtained from outside the proposed land including transportation and cost of earth and deposited as directed. | 146.35 | CUM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_831216.xls
BOQ • 0.26 MB
Drg11.pdf
Additional Documents • 16.33 MB
Tender800623.pdf
Tender Documents • 2.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .