Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 CrAccepted-AOC STREET NO 11 SECTOR NO 04 TILAK NAGAR SAGAR ROAD BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | ₹10.4 Cr | L1 | Accepted-AOC Being Lowest Tenderer |
| 2 | L2₹10.5 CrRejected-Finance | ₹10.5 Cr | L2 | Rejected-Finance Being other than lowest tenderer |
| 3 | L3₹10.5 CrRejected-Finance 1 INFRONT OF SIDDHI VINAYAK GANESH MANDIR SATYAM VIHAR COLONY RAIPURA RAIPUR CHHATTISGARH 492013 | RAIPUR | CHHATTISGARH | 492013 | ₹10.5 Cr | L3 | Rejected-Finance Being other than lowest tenderer |
| 4 | L4₹10.7 CrRejected-Finance 501 SHANTI RESIDENCY II KRUSHNA NAGAR NR NARDAI BRAHM SAMAJ JAMNAGAR 361 006 | JAMNAGAR | GUJARAT | 361006 | ₹10.7 Cr | L4 | Rejected-Finance Being other than lowest tenderer |
| 5 | L5₹11.7 CrRejected-Finance | ₹11.7 Cr | L5 | Rejected-Finance Being other than lowest tenderer |
| Sl No | Description | Qty | Unit | SHREE GURUKRUPA CONSTRUCTION CO. L5 | M/s. Mohandas V Rajani L6 | ANANYA ENTERPRISES L3 | M/s Matadeen Ramchandra Agarwal L2 | Vijay Construction Co L4 | Hi Tech Transpower Pvt Ltd L7 | r.s.jain & sons L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 9,25,00,000 ₹9.3 Cr | 8,95,00,000 ₹8.9 Cr | 7,90,92,090 ₹7.9 Cr | 7,92,00,000 ₹7.9 Cr | 8,11,00,000 ₹8.1 Cr | 8,50,83,900 ₹8.5 Cr | 7,90,00,000 ₹7.9 Cr |
| 2.00 | Lump sum price worked out by the contractor for "SITE CLEARANCE, EXCAVATION & EARTH WORK" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 6,45,000 ₹6.5 L | 5,28,635.33 ₹5.3 L | 9,45,239.49 ₹9.5 L | 7,20,000 ₹7.2 L | 9,40,000 ₹9.4 L | 10,18,380 ₹10.2 L | 5,19,500 ₹5.2 L |
| 3.00 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION WORKS" as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 15,50,000 ₹15.5 L | 12,89,555.81 ₹12.9 L | 14,32,839.79 ₹14.3 L | 14,40,000 ₹14.4 L | 20,00,000 ₹20 L | 36,63,792 ₹36.6 L | 17,50,000 ₹17.5 L |
| 4.00 | Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION " as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 50,00,000 ₹50 L | 43,58,975.34 ₹43.6 L | 42,73,505.23 ₹42.7 L | 50,40,000 ₹50.4 L | 60,46,000 ₹60.5 L | 1,10,13,777 ₹1.1 Cr | 55,00,000 ₹55 L |
| 5.00 | Lump sum price worked out by the contractor for "ROAD/PATH /CULVERT WORKS" as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 1,00,00,000 ₹1 Cr | 1,51,48,794.06 ₹1.5 Cr | 1,08,18,260.66 ₹1.1 Cr | 1,17,00,000 ₹1.2 Cr | 1,07,00,000 ₹1.1 Cr | 1,78,43,533 ₹1.8 Cr | 1,08,18,260 ₹1.1 Cr |
| 6.00 | Lump sum price worked out by the contractor for "AREA DRAINAGE WORKS" as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES | 1 | LUMP SUM | 7,00,000 ₹7 L | 9,99,006.62 ₹10.0 L | 12,56,059.04 ₹12.6 L | 13,50,000 ₹13.5 L | 9,33,000 ₹9.3 L | 20,60,028 ₹20.6 L | 9,45,000 ₹9.4 L |
| 7.00 | Lump sum price worked out by the contractor for " COMPOUND WALL , FENCING AND STEEL GATE WORKS" as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 19,70,000 ₹19.7 L | 25,32,943.06 ₹25.3 L | 22,30,807.38 ₹22.3 L | 24,30,000 ₹24.3 L | 24,87,000 ₹24.9 L | 34,61,764 ₹34.6 L | 23,39,000 ₹23.4 L |
| 8.00 | Lump sum price worked out by the contractor for "LIGHT PROTECTION WORKS" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 5,15,000 ₹5.2 L | 5,45,396.2 ₹5.5 L | 5,45,396.2 ₹5.5 L | 7,20,000 ₹7.2 L | 4,75,645 ₹4.8 L | 34,55,085 ₹34.6 L | 5,00,000 ₹5 L |
| 9.00Sch 'A' PART-IX (MISCELLANEOUS ITEMS) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items which categorically includes for same shall be measured and paid separately under respective schedule. | ||||||||||
| 10.00 | INTERNAL ELECTRIFICATION WORKS
S&F Industrial heavy duty Wall mounted fan 750mm sweep, 5 star rated with speed regulater,180 degree rotated , 1440 rpm, double ball bearing ,all including connection with single core PVC insulated but unsheathed, FRLS cable with multistranded copper conductors IS 694 marked, from ceiling rose to fan complete all as specified and directed.
Make:Crompton Energion HS or equivalent in Orient / Almonard/USHA /Havells | 31 | EACH | 16,300 ₹5.1 L | 17,200 ₹5.3 L | 21,000 ₹6.5 L | 450 ₹13,950 | 13,500 ₹4.2 L | 25,783 ₹8.0 L | 13,500 ₹4.2 L |
Updated dates
Tender Value
₹9.8 Cr
EMD Value
₹8.1 L
Closing Date
3 Feb 2026, 6:00 pmClosed
Chief Engineer Jodhpur Zone
HQ Chief Engineer Jodhpur Zone Opp to Military Hospital Rasala Road Jodhpur
PROVISION OF PARKING SHED AT BHUJ MILITARY STATION
2025_MES_742286_1
800623/BHUJ/E8
Open Tender
Civil Works
610 days
GE (A) Bhuj
PROVISION OF PARKING SHED AT BHUJ MILITARY STATION
8 documents required · 8 mandatory
₹3,000
Yes
GE (A) Bhuj
₹8.1 L
Yes
11 May 2026
1 Dec 2025
10 Feb 2026
1 Dec 2025
3 Feb 2026
27 Jan 2026
2 Dec 2025 - 9 Dec 2025
Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES
Lump sum price worked out by the contractor for "SITE CLEARANCE, EXCAVATION & EARTH WORK" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES
Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION WORKS" as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES
Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION " as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES
Lump sum price worked out by the contractor for "ROAD/PATH /CULVERT WORKS" as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES
Lump sum price worked out by the contractor for "AREA DRAINAGE WORKS" as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES
Lump sum price worked out by the contractor for " COMPOUND WALL , FENCING AND STEEL GATE WORKS" as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES
Lump sum price worked out by the contractor for "LIGHT PROTECTION WORKS" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES
SITE CLEARANCE, EXCAVATION & EARTH WORK Supply only approved earth obtained from outside the proposed land including transportation and cost of earth and deposited as directed.
INTERNAL ELECTRIFICATION WORKS S&F Industrial heavy duty Wall mounted fan 750mm sweep, 5 star rated with speed regulater,180 degree rotated , 1440 rpm, double ball bearing ,all including connection with single core PVC insulated but unsheathed, FRLS cable with multistranded copper conductors IS 694 marked, from ceiling rose to fan complete all as specified and directed. Make:Crompton Energion HS or equivalent in Orient / Almonard/USHA /Havells
Supply and fixing of MCB, DB double door type, made out of CRCA mild steel sheet flushed in wall, load line distribution board TPN vertical, 4 way with 200 Amps rated bus bar , 415 volts IP-43, with PVC MCB blanking plates, stove enamelled, dust and vermin proof including MCCB 4P 16 kA as incomer etc complete all as specified and as directed.
S & F Highbay light fitting with pressure die-cast housing, integrated PC optics and 100 lm/w efficiency, 4KV inbuilt and 10KV external surge protection, IP66 ingress protection with additional chain of capacity 70 Watt complete all as specified and directed.
S & F LED security light fitting 60 W made out of pressure die cast aluminium powder coated housing high impact resistant 4mm thick toughened glass cover and matrix of power LEDs inbuilt electronic driver up to 4KV surge protection fitted with adjustable pole adapter to enable on site tilt angle setting depending on road geometry CCT5500-6500 CRI greater than 70 , input power 24W system with 85W/ lumens output operating voltage 140-280V with connection by three core PVC insulated multistranded copper conductor sheathed cable of size 2.5 sq mm fixed with & including bracket made of GI pipe 40mm bore light grade, 1.6 mtr long bent to shape required with 2 no MS clamps of suitable size and length, nuts & bolts complete all as specified and as directed.
COMPOUND WALL , FENCING AND STEEL GATE WORKS S & F of CI wheel as rollers of 75mm dia for gates.
EXTERNAL ELECTRIFICATION WORKS M&L for brick maonary platform with surface finish using extra cement for the mounting / installation of transformer of size 3000 x 2500 x 1200 mm complete with chain link fencing and steel gate all as shown in TD of CEJZ complete all as specified and as directed.
M&L for HT cable route indicator duly painted with grey colour synthetic enamel paint two coats over one coat of red oxide primer, oval shape of size 200mmx150mmx6mm thick cast iron disc with letters embossed and fixed on 25mmx25mmx5mm thick MS angle iron for 50mm long including necessary PCC in 1:3:6 type C1 cement concrete 20mm aggregate and 15mm thick plastering all around below ground level of size 650mmx300mmx250mm embedded in PCC block all as specified.
Shifting of existing High galvanized mast light pole of height 15.00 mtr along with Flood light fitting all acessories i.e control panel, aviation obstruction light, lightning arrester spike including demolation of existing RCC foundation and making new RCC foundation as per existing size complete all as specified and directed.
S&F industrial type flame proof , Plug and socket 32 Amps rating , 3P+N+E , 415 Volt, weather proof complete all as specified and directed.
Arboriculture Digging of pit n.exc 0.25 cum in any type of soil incl removal and filling back to pit with suitable growing media like red earth by treating with farm yead manure in the ratio (3:1) fertilizers and pesticides (i.e Bevation and neem cake BHC 10% linson dust. Thimment or phorate, manures super and vermicompost) and making up the trenh area to proper level including supply and planting tree plants of species of height not less than 3 ft for following trees :- (a) Ashoka = 40.00 Nos (b) Kehsher Mango = 30.00 Nos (c) Neem = 40.00 Nos (d) Palm (Kharjur) = 40.00 Nos Total = 150.00 Nos
Prvn of M.S Tree Guard 1.50 Mtrs high above with MS wiremesh of size 78 x 37 mm and 2 mm dia of wire and MS angle iron 20 x 20 x 3 mm verticals (3 Nos) & MS flats 14 x 3 mm around the tree guard (3 Nos top , middle and bottom) equally spaced and embedded vertical angles in PCC 1: 3:6 Type B-I including excavation in post holes and removal of excavated material to a n.exc 5 mtr and applying two coats of synthetic enamel paint including one coat of red oxide primer to tree guard and all as specified and directed.
Maintenance of planted trees and lawn area for two year after certified date of completion issued by GE (Srl item No 23 & 24 above) by employing one experienced mali per day. The maintenance shall includes the following. (a) Periodical de-weeding of unwanted vegetation growth around the plants/lawn area (b) Watering all the trees/plants/grass and soil with required for proper growth. (c) Periodical prunning the shrubs. (d) Periodical lawn mowing (e) Treating the trees/plants grass and soil with required quantity of approved manure,pesticides and fertilizer including necessary toping of red earth (f) Replacement of dried/dead plants/trees. (g) Hose pipe to be arranged by the contractor. (h) Water shall be supplied by Deptt only for watering to plants.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_831216.xls
BOQ • 0.26 MB
Drg11.pdf
Additional Documents • 16.33 MB
Tender800623.pdf
Tender Documents • 2.91 MB
Download all tender documents and submit your bid