Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.4 LAdmitted-Finance | ₹58.4 L | L1 | Admitted-Finance |
| 2 | L2₹58.9 LAdmitted-Finance | ₹58.9 L | L2 | Admitted-Finance |
| 3 | L3₹63.0 LAdmitted-Finance 619 THAI APARTMENT T H ROAD TONDIARPET CHENNAI TAMIL NADU 600081 TN02D0019523 | CHENNAI | TAMIL NADU | 600081 | ₹63.0 L | L3 | Admitted-Finance |
| 4 | L4₹63.0 LAdmitted-Finance | ₹63.0 L | L4 | Admitted-Finance |
| 5 | L5₹67.3 LAdmitted-Finance NO 9 11 MIG TNEB NEW VANAVIL FLATS AYAPAKKAM CHENNAI 600 077 | CHENNAI | CHENNAI | TAMIL NADU | 600077 | ₹67.3 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R.S.S.ENTERPRISES L2 | Thirumalai Security Service L4 | Monisha Security Agency L3 | GREEN AND BLUE FACILITY MANAGEMENT SERVICES L1 | RAKENGINEERING L5 | KOTHARI INDUSTRIAL CORPORATION LIMITED L7 | V NARAYANAN L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Sweeping the floors and Staircases including clearing of waste records daily, cleaning all partition walls [Brick, Wooden & Aluminum, Glazed], doors, windows, blinds, Electrical fittings viz. Tube Lights, fans, Electrical wirings, switch boxes etc, Water mopping of entire office floor areas, removal of cobwebs, cleaning of dustbins, dusting/wiping of files and records in racks and cupboards, furnitures, collecting and disposing all the waste in main dust bin in EB complex, all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc..,. for the period of one year (Flooring with Cement Mortar) | 12,31,070 | m2 | 1.25 ₹15.4 L | 0.9 ₹11.1 L | 0.9 ₹11.1 L | 1.15 ₹14.2 L | 1.25 ₹15.4 L | 1.5 ₹18.5 L | 1.62 ₹19.9 L |
| 2.00 | Sweeping and soap oil water mopping of entire lobbies,passages cleaning entire office floor areas,floor mats,dust bins, spitting bins, cleaning/wiping of front glass partitions, glass doors,steel rolling shutters,name display board of senior Board officials and doors partitions ,Staircases,removal of cobwebs,(all the above activities to be done daily) including the cost of all labour,labour uniforms lead, lift, T&P, cost of all materials such as coconut Broom sticks, Bamboo baskets,Dungry cloth, cost of all consumables etc., for the period of one year inside EB complex.(Flooring with ceramic /Granite tiles) | 9,61,779 | m2 | 1.39 ₹13.4 L | 0.95 ₹9.1 L | 0.86 ₹8.3 L | 1.36 ₹13.1 L | 1.5 ₹14.4 L | 1.25 ₹12.0 L | 1.35 ₹13.0 L |
| 3.00 | Sweeping of open areas around EB complex collection and removal of garbages and wastes from garbage chute to outside of EB complex daily,all general outside of EB complex ,power room and all general outside cleaning as directed by the Engineer at site including the cost of all labour,labour uniforms lead, lift, T&P, cost of all materials such as coconut Broom sticks, Bamboo baskets,Dungry cloth, cost of all consumables etc., for the period of one year. | 21,07,820 | m2 | 0.32 ₹6.7 L | 0.45 ₹9.5 L | 0.45 ₹9.5 L | 0.3 ₹6.3 L | 0.3 ₹6.3 L | 0.48 ₹10.1 L | 0.27 ₹5.7 L |
| 4.00Maintenance charges for cleaning the toilets, wash basins, water closets, urinals, and floor tiles by spraying of disinfectant and supplying of all consuamable materials like scented phenyl and placing napthaline balls in the urinals and wash basins, sweeping and cleaning the floor surface, side wall surface, grating, removing dirt/ refuge and cob webs and sweeping away the staginated water periodic intervals including carrying out of other miscellaneous works during hours cost of all materials labour and keeping the toilet always by clean, neat and tidy without any odur or foul smell as directed by the Engineer incharge lead, lift, T&P, cost of all materials such as coconut Broom sticks, Bamboo baskets,Dungry cloth, cost of all consumables etc., for the period of one year. | ||||||||||
| 4.01 | 5A Block G Floor toilet | 12 | Months | 1,291 ₹15,492 | 2,700 ₹32,400 | 2,400 ₹28,800 | 1,011 ₹12,132 | 1,250 ₹15,000 | 8,814.81 ₹1.1 L | 3,600 ₹43,200 |
| 4.02 | 5A Block I Floor /VIP toilet | 12 | Months | 1,821 ₹21,852 | 2,700 ₹32,400 | 2,400 ₹28,800 | 1,380 ₹16,560 | 1,458 ₹17,496 | 8,814.81 ₹1.1 L | 3,600 ₹43,200 |
| 4.03 | 5A Block I Floor /common toilet | 12 | Months | 4,000 ₹48,000 | 2,700 ₹32,400 | 2,400 ₹28,800 | 4,293 ₹51,516 | 3,333 ₹39,996 | 8,814.81 ₹1.1 L | 3,600 ₹43,200 |
| 4.04 | 5A Block II Floor /common toilet | 12 | Months | 4,399 ₹52,788 | 2,700 ₹32,400 | 2,400 ₹28,800 | 3,373 ₹40,476 | 4,167 ₹50,004 | 8,814.81 ₹1.1 L | 3,600 ₹43,200 |
| 4.05 | 5A Block III Floor /common toilet | 12 | Months | 5,950 ₹71,400 | 2,700 ₹32,400 | 2,400 ₹28,800 | 4,576 ₹54,912 | 5,000 ₹60,000 | 8,814.81 ₹1.1 L | 3,600 ₹43,200 |
| 4.06 | 5B Block (Ground Floor) /common toilet | 12 | Months | 5,400 ₹64,800 | 2,700 ₹32,400 | 2,400 ₹28,800 | 4,139 ₹49,668 | 5,000 ₹60,000 | 8,814.81 ₹1.1 L | 3,600 ₹43,200 |
Tender Value
Refer Docs
EMD Value
₹79,000
Closing Date
8 Dec 2025, 12:00 pmClosed
SUPERINTENDING ENGINEER/ CIVIL/DISTRIBUTION
OFFICE OF THE SUPERINTENDING ENGINEER/ CIVIL/DISTRIBUTION 4TH FLOOR/WESTERN WING, NPKRR MAALIGAI, 144 ANNA SALAI,CHENNAI-600 002, TAMIL NADU.
Maintenance and up keeping of all office floors by sweeping and mopping, cleaning toilets in all floors of TNEB HQ complex buildings and Sweeping the open area around the TNEB Complex for a period of one year
2025_EB_624962_1
SE/C/Dist./ 14 /2025-26
Open Tender
Housekeeping/ Cleaning
365 days
Chennai
As per specification
5 documents required · 5 mandatory
₹0
₹79,000
Yes
31 Jan 2026
20 Nov 2025
9 Dec 2025
21 Nov 2025
8 Dec 2025
21 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.40 MB
Tender Documents
Tender Documents • 0.97 MB
BOQ
BOQ • 0.43 MB
Download all tender documents and submit your bid