Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹33,300
Closing Date
4 Dec 2026, 11:00 am
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
AC WORKS
SHQ BSF GANDHINAGAR
Realignment of the existing pedestrian pathway near gate no. 02 at BSF Campus Gandhinagar
2026_BSF_931064_5
SHQ-GNR/Quotation/2026/341-62
Open Tender
Civil Works
Percentage
30 days
BSF CAMPUS gandhinagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
19 Nov 2026
19 Nov 2026
7 Dec 2026
19 Nov 2026
4 Dec 2026
19 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.2 | cum | 7,780.3 | ₹17,116.66 |
| 2 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6(1 cement :6 coarse sand) | 0.29 | cum | 7,132.25 | ₹2,068.35 |
| 3 | 12 mm cement plaster of mix:1:6(1 cement: 6 fine sand) | 2 | sqm | 333.35 | ₹666.7 |
| 4 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 1.2 | cum | 2,434.25 | ₹2,921.1 |
| 5 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 0.29 | cum | 2,060.2 | ₹597.46 |
| 6 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 14 | metre | 39.35 | ₹550.9 |
| 7 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 44 | sqm | 131.75 | ₹5,797 |
| 8 | Deduction for GST correction slip (multiplying factor @0.973) (Item no.1 to 7) on ₹ 29718.17 | - | Nos | 0.97 | - |
| 9 | Add Cost Index @ 15.00% on DSR Items₹ 28915.78 | - | Nos | 0.15 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_982480.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .