| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.0 L+₹96,390 (19.3%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹6.3 L+₹1.3 L (26.0%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹6.5 L+₹1.5 L (29.8%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹6.7 L+₹1.7 L (33.2%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
17 Jun 2020, 2:00 pmClosed
VARGHESE P O
DMM P AND P FACT LTD
Dismantling and removal of Air Drying Tower and Pump Tank in SA Plant, FACT-CD.
2020_FACT_562109_1
04097/2020-2021/E21589
Limited
Miscellaneous Services
Item Rate
60 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDM105A)
3 documents required · 3 mandatory
₹0
₹12,000
Yes
29 Jun 2020
1 Jun 2020
18 Jun 2020
1 Jun 2020
17 Jun 2020
1 Jun 2020
Dismantling and removal of Air Drying Tower and Pump Tank in SA Plant, FACT-CD.
Dismantling and Removal of Shell, Bottom Plate, Roof, Associated Structures & platforms, Pipelines, Internals including Demister pads, cast iron distribution channels, spray tubes and Brick Lining of Decommissioned Air Drying Tower and Pump Tank in SA Plant, FACT-CD. Work Involves: Make required arrangements for the work. Arrange scaffolding inside the tower for removal of bricks. Chip and remove the entire inside brick lining of shell and bottom plate of ADT and entire brick lining of pump tank. Grillage beams and pillars inside ADT shall also be chipped and removed. The chipped and removed bricks shall be collected and transported to scrap yard and after weighing. Removal of brick lining shall be as per site instructions only. Cut and dismantle part by part entire roof, shell, structural platforms, stairways, bottom plates, internal tube sheets, cast iron trays, spray tubes, Demister pads and their supports, Pump tank and platforms, CI / SS / MS pipelines and ducts in association with decommissioned ADT and pump tank. Removal of Rhepanol lining is also in the contractor's scope. Cutting and dismantling shall be executed as per the instructions from site in charge. Bottom plate shall be cleared completely from the foundation. Any pipelines (CI / SS / MS) in connection with the ADT shall be dismantled as per instructions. Any temporary support required for dismantling shall be done by the contractor. The dismantled plates / structures / pipes etc. shall be transported to the scrapyard after weighing. Site shall be cleared after work and any left-over scrap shall be shifted to scrap yard. All the work shall be done as per the instructions from Engineer- in-charge.
M A ALI
GOPINATHA PANICKER ENGINEERING CONTRACTOR
K G SIVANANDAN
M A Shamsudeen
AL GAANAM ENGINEERING WORKS
M K ALIAS
HASSAN MM
VIKRAMAN NAIR S
DEEPAK ENGINEERING WORKS
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_589882.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .