Renewal of main road by SDBC from NH-74 Gaindikhata to Gujjar Basti in constituency Haridwar Gramin Distt. Haridwar under AR 2026-27 (Km. 1 to 7 (800M))
2026_pwd_96043_1
1025/2A Dated 29.04.2026
Open Tender
Civil Works - Roads
60 days
Haridwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
EE, PD, PWD, Haridwar (through E-Challan)
₹1.8 L
27 May 2026
27 May 2026
9 Jun 2026
27 May 2026
9 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 | 128.66 | Cum | - | - |
| 2 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 2,456.25 | sqm | - | - |
| 3 | Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-30 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the he prevailing site conditions and shall be in accordance with Clause 504 of MORD) with Bitumen VG-30
Recovery against difference of quantities of Bitumen and Aggregates shall be done according to bitumen content & Density found actually in field after execution/ Job Mix Formula/ Estimated which ever is less. (Estimated density 2.20 Tonne/Cum) | 122.81 | Cum | - | - |
| 4 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 25,500 | sqm | - | - |
| 5 | Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder
and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects Grading II - 10mm using VG - 10 bitumen (bituminous binder @ 5 % of mix)
Recovery against difference of quantities of Bitumen and Aggregates shall be done according to bitumen content & Density found actually in field after execution/ Job Mix Formula/ Estimated which ever is less. (Estimated density 2.29 Tonne/Cum) | 663 | Cum | - | - |
| 6 | Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 The finishedsurface to be level, uniform and free from streaks and holes. | 1,426 | sqm | - | - |
| 7 | Maintenance of Earthen shoulder (filling with fresh selected soil)
Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause | 3,750 | sqm | - | - |
| 8 | Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903 | 3,843.75 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Terms_and_Conditions_Hotmix.pdf
Tender Documents • 0.31 MB
BOQ_113514.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid