Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | L1 | Accepted-AOC Being lowest tenderer | |
| 2 | L2₹1.6 L+₹1,300 (0.81%)Rejected-Finance WANIAWAD BHUJ KUTCH 370001 | BHUJ | KUTCH | GUJARAT | 370001 | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹1.7 L+₹10,300 (6.45%)Rejected-Finance | L3 | Rejected-Finance Not L2 |
Tender Value
₹1.6 L
Closing Date
7 Mar 2020, 3:00 pmClosed
Maj GS Pandey, GE (AF) Bhuj
GE (AF) Bhuj Bhuj-Kutch PIN-370001
Maintenance and Repairs to EOT crane 2 Ton flame proof, Make Hitech Industries installed at site bldg No P-981 at AF Stn Bhuj
2020_MES_326746_1
3020/eQ/93/19-20/E3
Limited
Job Works
Item Rate
30 days
GE (AF) Bhuj
The firm must be registered with HQ CWE (AF) Bhuj as approved supplier to carryout general order supply and job work
1 document required · 1 mandatory
₹0
Exempted
1 Oct 2020
19 Feb 2020
9 Mar 2020
19 Feb 2020
7 Mar 2020
19 Feb 2020
Amount
1. The following scheduled preventive Maintenance (Quarterly –cum Half Yearly Maintenance) are required to be carried out for above crane incl load test after repairs:- (a) Inspect for wear of bridge and trolley wheel, flat sports and check in flange. Ensure drive wheels are of the same diameter. (b) Check for worm collector shoes, sag in main runway wiring, ensuring contact to be kept through the entire length runway. Check alignment and relocation. (c) Servicing, cleaning and maintenance of gear box assy and repair of main gear box with spares such as seal for gear box and replacement of fresh gear oil. (24 Litrs) (d) Checking, cleaning the contacts of the contactors including replacement of contactors (Each 4). (e) Checking the pin and bushes for wear of flexible coupling and proper adjusting. (f) Lubrication of all moving parts and applies fresh grease for all movable parts . (g) Cleaning the plumber blocks and applying fresh grease for lubrication.
(h) Cleaning and greasing the wrinch assy and replacement of wire rope with thimble complete. (30RM). (j) Servicing, aligning, adjusting and replacement of the limit switches. (Each set 4) (k) Replacement of cable guide with rollers. (30 Each) (l) Servicing, cleaning and replacement of speed control unit with minor components. (m) Checking the brake system and repair of break liner pulley and replacement of the wear out break liners and aligning complete. (3 sets) 2. Painting of complete EOT crane with synthetic enamel paint by sparay gun including scrapping of old paint and rust with wire brush and applying redoxide. 3. Checking for proper functioning of cranes and carrying out alignment if required. 4. Load testing of crane after complection of complete maint work. Note:- (a) All material, labour and T and P required for complete the job is responsibility of the firm. (b) All Old retrieved materials shall be contractor property.
M/s Bombay Novelty Stores
BHAVANI PROVISION STORES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_365577.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .