Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹11.3 L+₹3.6 L (47.2%)Admitted-Finance 61 3 37 VENKANNAPALEM MALKAPURAM MALKAPURAM VISAKHAPATNAM ANDHRA PRADESH 530011 | VISAKHAPATANAM | ANDHRA PRADESH | 530011 | L2 | Admitted-Finance | |
| 3 | L3₹24.6 L+₹16.9 L (220.3%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SIRICON ENGINEERS AND CONTRACTORS L2 | VENKATESWARA ENGINEERING WORKS L1 | ARUNA ENGINEERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | 1. Provision and Arrangement of 40 TPH Dewatering Pumps during Vessel 1st Undocking – ORV SAGAR KANYA
To provide temporary dewatering arrangements using portable 40 TPH capacity pumps at various strategic on-board locations during vessel undocking operations. The purpose is to quickly dewater any compartments in case of leakages.
Work Locations On-board: The contractor shall arrange the pumps at the following locations:
Engine Room, Stabilizer Room, PM (Propulsion Motor) Room, Steering Gear Room, Bow Thruster (BT) Room. etc.. Provide a 6 in numbers of 40 TPH capacity portable pumps (electrically operated) for each of the above locations.
Pump Accessories:
Provide suitable discharge hoses from each pump up to Main Deck overboard for discharge into the sea. Supply of power cables with sufficient length and suitable connectors. Supply and install ON/OFF switches at Main Deck level for operator control.
Pump Operation & Monitoring:
Qualified operators shall be available on-board at each pump location during the undocking operation for immediate action in case of water ingress.
Installation & Readiness:
All pump systems must be installed and tested prior to undocking. Ensure all hoses are securely routed and free from obstruction or tripping hazards. The pump arrangement should remain in place and manned from start of undocking operations until completion and confirmation of watertight integrity.
After successful undocking and clearance from the ship staff, pumps and associated accessories should be carefully removed.
QTY: 06 Nos (for 1st undocking approximately 3 days) | 6 | NOS | 94,200 ₹5,65,200 | 64,000 ₹3,84,000 Lowest | 2,05,000 ₹12,30,000 |
| 2.00 | 2. Provision and Arrangement of 40 TPH Dewatering Pumps during Vessel 2nd Undocking – ORV SAGAR KANYA
To provide temporary dewatering arrangements using portable 40 TPH capacity pumps at various strategic on-board locations during vessel undocking operations. The purpose is to quickly dewater any compartments in case of leakages.
Work Locations On-board: The contractor shall arrange the pumps at the following locations:
Engine Room, Stabilizer Room, PM (Propulsion Motor) Room, Steering Gear Room, Bow Thruster (BT) Room. etc.. Provide a 6 in numbers of 40 TPH capacity portable pumps (electrically operated) for each of the above locations.
Pump Accessories:
Provide suitable discharge hoses from each pump up to Main Deck overboard for discharge into the sea. Supply of power cables with sufficient length and suitable connectors. Supply and install ON/OFF switches at Main Deck level for operator control.
Pump Operation & Monitoring:
Qualified operators shall be available on-board at each pump location during the undocking operation for immediate action in case of water ingress.
Installation & Readiness:
All pump systems must be installed and tested prior to undocking. Ensure all hoses are securely routed and free from obstruction or tripping hazards. The pump arrangement should remain in place and manned from start of undocking operations until completion and confirmation of watertight integrity.
After successful undocking and clearance from the ship staff, pumps and associated accessories should be carefully removed.
QTY: 06 Nos (for 2nd undocking approximately 3 days) | 6 | NOS | 94,200 ₹5,65,200 | 64,000 ₹3,84,000 Lowest | 2,05,000 ₹12,30,000 |
Tender Value
Refer Docs
Closing Date
4 Sept 2025, 11:00 amClosed
MANAGER SRC OS
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Provision and Arrangement of 40 TPH Submersible pumps on ORV Sagar Kanya
2025_HSL_98048_1
20 / 22022 / 40TPH Submersible pumps / 197 / 2025-26
Open Limited
Miscellaneous Services
Service
6 days
HSL Visakhapatnam
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
6 Sept 2025
1 Sept 2025
4 Sept 2025
1 Sept 2025
4 Sept 2025
1 Sept 2025
Amount
1. Provision and Arrangement of 40 TPH Dewatering Pumps during Vessel 1st Undocking – ORV SAGAR KANYA To provide temporary dewatering arrangements using portable 40 TPH capacity pumps at various strategic on-board locations during vessel undocking operations. The purpose is to quickly dewater any compartments in case of leakages. Work Locations On-board: The contractor shall arrange the pumps at the following locations: Engine Room, Stabilizer Room, PM (Propulsion Motor) Room, Steering Gear Room, Bow Thruster (BT) Room. etc.. Provide a 6 in numbers of 40 TPH capacity portable pumps (electrically operated) for each of the above locations. Pump Accessories: Provide suitable discharge hoses from each pump up to Main Deck overboard for discharge into the sea. Supply of power cables with sufficient length and suitable connectors. Supply and install ON/OFF switches at Main Deck level for operator control. Pump Operation & Monitoring: Qualified operators shall be available on-board at each pump location during the undocking operation for immediate action in case of water ingress. Installation & Readiness: All pump systems must be installed and tested prior to undocking. Ensure all hoses are securely routed and free from obstruction or tripping hazards. The pump arrangement should remain in place and manned from start of undocking operations until completion and confirmation of watertight integrity. After successful undocking and clearance from the ship staff, pumps and associated accessories should be carefully removed. QTY: 06 Nos (for 1st undocking approximately 3 days)
2. Provision and Arrangement of 40 TPH Dewatering Pumps during Vessel 2nd Undocking – ORV SAGAR KANYA To provide temporary dewatering arrangements using portable 40 TPH capacity pumps at various strategic on-board locations during vessel undocking operations. The purpose is to quickly dewater any compartments in case of leakages. Work Locations On-board: The contractor shall arrange the pumps at the following locations: Engine Room, Stabilizer Room, PM (Propulsion Motor) Room, Steering Gear Room, Bow Thruster (BT) Room. etc.. Provide a 6 in numbers of 40 TPH capacity portable pumps (electrically operated) for each of the above locations. Pump Accessories: Provide suitable discharge hoses from each pump up to Main Deck overboard for discharge into the sea. Supply of power cables with sufficient length and suitable connectors. Supply and install ON/OFF switches at Main Deck level for operator control. Pump Operation & Monitoring: Qualified operators shall be available on-board at each pump location during the undocking operation for immediate action in case of water ingress. Installation & Readiness: All pump systems must be installed and tested prior to undocking. Ensure all hoses are securely routed and free from obstruction or tripping hazards. The pump arrangement should remain in place and manned from start of undocking operations until completion and confirmation of watertight integrity. After successful undocking and clearance from the ship staff, pumps and associated accessories should be carefully removed. QTY: 06 Nos (for 2nd undocking approximately 3 days)
SIRICON ENGINEERS AND CONTRACTORS (BID ID -419598)
ARUNA ENGINEERS (BID ID -419605)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .