Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
9 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
BUILDINGS
17 conditions · 4 needing a document upload
Financial Eligibility Criteria: as per Clause 10.2 of Part-I of IRSGCC- 2022and as per Railway Board Advance correction slip No.1 dated 14-07- 2022The tenderer must have minimum average annual contractual turnover of V/N or "V" whichever is less: where V=Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderer shall submit requisite information as per Annexure-F (Annexure-VIB of GCC), along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Financial Eligibility Criteria: As per Clause 10.2 of IRSGCC-2022(As per Advanced Correction slipNo,1 dated. 14.07.2022 to GCC-2022) and the same is mentioned in Para No.10.2 page no. 15 of this tender document. Tenderer should attach Self attested/ Digitally signed copy of Certificate showing minimum average annual contractual turnover as per Annexure VI B ofIRSGCC-2022 (As per Advanced Correction slip No,1dated.14.07.2022 to GCC-2022)in Annexure - "F"Page-32 of Master Document -1 attached to the tender.
Similar nature of work: B.V. c): Any work consisting of steel fabrication and erection of FOB or Steel/Composite girder Bridges or ROB with Steel/Composite girder Bridges or ROB with Steel Composite girder Or Industrial Shed or PF Shelter (steel) or Microwave/HT Tower or Replacement of steel members/repairs on steel girder Bridges or Steel Sleepers over girder Bridges vide CGE Lr. No. W.148/P/SNW/2025 Dt.02.12.2025 with the approval of PCE.
Technical Eligibility Criteria: as per Clause 10.1 of Part-I ofIRSGCC- 2022(a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s)during last 07(seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40%of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
(b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or Page 15/21 1.1.1tenderer must have successfully completed or substantially completed anyone of the following categories of work(s) during last 07(seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or(iii) One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note forb(1): Separate completed works of minimum required values shall also be considered for fulfilment of technical eligibility criteria for different components. (b)(2) In such cases, what constitutes a component in a composite work shall be clearly predefined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work 1.1.1 experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required intender documents by way of Special Conditions, a formal agreement duly notarized, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s),and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfil technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35%valueof work to be subletted, in last5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s)fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing.
Note for Item 10.1 of IRSGCC-2022: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500crore and above in last 3financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work 1.1.2 experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
16 conditions · 5 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tender value is including escalation of (-)15% (minus fifteen percent ) on CPWDDSR rates. Tenderer should note this before quoting the rates.
The original Bank Guarantee (in lieu of Bid Security) should be delivered in person on any working day to the official nominated (i.e., OS/Tenders/Engg)/BZA Division) as indicated in the tender document before closing date for submission of bids (i.e. excluding the last date of submission of Bids).
All the instructions furnished in the Technical Compliance /Commercial Compliance / Custom / Undertakings /General Instructions are only indicative and not exhaustive. The tenderer shall read the GCC / Tender documents for complete details.
The tenderer shall thoroughly go through the entire tender document and strictly adhere to the instruction and directions given therein.
SW I : BZA Division: BZA-GDR Section : Repairs to COP and FOB concrete floor slabs, roofing, landing, moulding steps, base foundations including steel braces, plate angles, screens, removal of rusted cleats, angle members etc along with painting in SSE/Works/BPP & TEL sections in ADEN/BPP sub-division under the Jurisdiction of DEN/Central/BZA SW II : BZA Division: BZA-VSKP Section : Repairs to COP and FOB concrete floor slabs, roofing, landing, moulding steps, base foundations including steel braces, plate angles, screens, removal of rusted cleats, angle members etc along with painting in SSE/Works/EE sections in ADEN/EE sub- division under the Jurisdiction of DEN/Central/BZA
E-15-CENTRAL-BZA-2026~SCOR
E-15-CENTRAL-BZA-2026
Open
Works - General
12 Months
Krishna, Andhra Pradesh
₹0
₹5.4 L
17 Aug 2026
17 Aug 2026
26 Aug 2026
44 items across 4 schedules · ₹2,77,79,385.21 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. | — | — | — | — | |
| 1 | All kinds of soils | cum | 54.52 | 189.63 | 10,338.63 |
| Providing and laying in position Plain cement concrete of specified Nominal Mix f o r miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level : | — | — | — | — | |
| 2 | 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size). | cum | 394.56 | 2,576.61 | 10,16,627.24 |
| 3 | Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. | cum | 44.06 | 2,646.72 | 1,16,614.48 |
| Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. | — | — | — | — | |
| 4 | Approach slab at formation level, Dirt wall/ ballast wall at formation level | cum | 69.93 | 2,682.71 | 1,87,601.91 |
| Centering and shuttering including strutting, propping etc. and removal of form for : | — | — | — | — | |
| 5 | All types of bridge sub-structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level | Sqm | 60.48 | 605.99 | 36,650.28 |
| Painting of cleaned plate/composite bridge girders including all scaffolding along with provision of Jhoola / hanging scaffolding ladders etc. where required. | — | — | — | — | |
| 6 | With two coats of Aluminium paint in dual containers conforming to IS:2339 with DFT of 15 - 20 Microns for each coat. | Sqm | 6000.00 | 91.81 | 5,50,860 |
| 7 | Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical Specification with average thickness of 10mm including priming coat, mortar plaster and seal coat of epoxy. | Sqm | 248.40 | 941.21 | 2,33,796.56 |
| Removing all loose concrete, cleaning rust with dusting compound & water jet, drying, replacing worn out reinforcements by welding new reinforcement for making up lost steel section, applying approved anti- corrosive polymer coating over the damaged area to proper profile, providing polymer mortar (up to 20mm thickness) or polymer concrete (more than 20mm thickness) consisting of cement, sand, 6mm down chips where required and polymer as per manufacturers' specification. The rate includes curing for 14 days, all materials, consumables, labours, tools and plants, scaffolding/staging with all lead and lift. Note: Cost of reinforcement, if used, to be paid separately. | — | — | — | — | |
| 8 | 20mm - 50mm thick polymer concrete | Sqm | 68.40 | 1,294.31 | 88,530.8 |
| Schedule total | ₹22,41,019.9 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
MasterDocument-1.pdf
ATTACHMENT
MasterDocument-2.pdf
ATTACHMENT
SCHEDULE.pdf
ATTACHMENT
1-GeneralConditions.pdf
ATTACHMENT
2-SteelSpecialConditions.pdf
ATTACHMENT
3-TrDSplConditions.pdf
ATTACHMENT
4-BuildingConditions.pdf
ATTACHMENT
5-SpecificationOfConcrete.pdf
ATTACHMENT
6-SafetyandTrackConditions.pdf
ATTACHMENT
7-BuildingConditions.pdf
ATTACHMENT
8-SPECIFICATIONSGALVALUMESHEETS.pdf
ATTACHMENT
DESIGNMIXHQrsLETTERONSPECIALCONDITIONSFORDESIGNMIX2123-
ATTACHMENT
10-QualityControlforFOBsCOPsandSheds.pdf
ATTACHMENT
11-CEWorksSiterecordsmaintaining26.05.2022.pdf
ATTACHMENT
12-SitelaboratoryestablishmentHQrsletter28-12-2021.pdf
ATTACHMENT
13-RevisedBrands26022026.pdf
ATTACHMENT
9-DESIGNMIXHQrsLETTERONSPECIALCONDITIONSFORDESIGNMIX2123-03-2022.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].