Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹1.1 L−₹9.6 L (89.6%)Rejected-Finance | L2 | Rejected-Finance Other than Lowest Bidder |
Tender Value
₹11.5 L
EMD Value
₹23,000
Closing Date
6 Mar 2021, 6:00 pmClosed
AGE (I) SURYALANKA
AGE (I) SURYALANKA MILITARY ENGINEER SERVICES BAPATLA -522 101
AS PER BOQ AND TENDER DOCUMENT
2021_MES_420399_1
AGE(I)/SL/8369
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
SURYALANKA
AS PER TENDER DOCUMENT
6 documents required · 6 mandatory
₹500
AGE (I) SURYALANKA
₹23,000
Yes
26 Mar 2021
9 Feb 2021
8 Mar 2021
9 Feb 2021
6 Mar 2021
22 Feb 2021
9 Feb 2021 - 27 Feb 2021
Amount
Maintenance and operation of Pump sets, Valves at AF station Suryalanka consisting of following switch gears / equipments complete for THREE Shifts of 08 Hrs each (0600 Hrs to 1400 Hrs , 1400 Hrs to 2200 Hrs & 2200 Hrs to 0600 Hrs) on all days including Sundays and Holidays all as specified and as directed. (i) Centrifugal Pump 12.5 HP - 02 Nos (ii) Centrifugal Pump 10 H.P - 02 Nos (iii) DG Set 62.5 KVA - 01 No (iv) LT Panel with starters & control devices - 04 Nos. (v) Sluice valve/ NRV 150 to 200mm - 04 Nos (vi) UG Sump of capacity 0.5 LG - 02 Nos The number of FGM to be employed per shift shall be 01 (one).
Maintenance and operation of DG sets installed at AF NET / Stn HQ area at AF station Suryalanka consisting of following switch gears / equipments complete for ONE Shift of 08 Hrs on all days including Sundays and Holidays all as specified and as directed. (i) DG Set 100 KVA with LT panel & DB's - 02 No (ii) DG Set 30 KVA with LT panel & DB's - 02 No (iii) DG Set 10 KVA with LT panel & DB's - 01 No The number of FGM to be employed per shift shall be 01 (one). Shift timimg shall be 0800 hrs to 1600 hr dailys. However the shift timing shall change as per requirement as directed by AGE (I).However working hours shall be restricted to 8 hrs (continous) in a day. The contractor shall not have any claim on this regard at a later stage.
Note for item No. 1 & 2 :- (a) The work will be of continuous nature including Sundays, Holidays or irrespective of Strikes and the contractor must employ reliever tradesman as relief for employees during weekly off / authorised holidays and the rate quoted above shall be deemed to be included this aspect in all respect. The operator will be present in the installation as per shift, should ensure serviceability of the equipments. (b). The operator should be above 18 Years and below 60 Years of age. Operator should be in proper uniform with shoes and belts, entry passes etc. The name of operator to be displayed on uniform. The nature of work to be carried out are at restricted areas and all restrictions for entry / exit of the particular areas are to be followed by the operator. The Electric Panels, Pump sets and DG sets shall be operated by one operator per shift and the operator shall remain in generator room while running DG set. If the operator found missing from the work premises, an amount of Rs.500/- per Hour as penalty will be deducted from the amount due to the contractor. (c) The operator should be passed with minimum 2 years course training from ITI / NCVT in Electrical / Mechanical/fitter trade and must have 4 years experience in similar field. The operators should ensure the serviceability of the Plants, Machineries or Equipments and should be remain alert for every odd situation. The contractor should ensure full safety and functionability of the assets being maintained by him. Any casualty or injury sustained by the operators during the working hours at the premises of installations shall be sole liability of the contractor. No claim on this account shall be entertained by the Department. (d) All Tools & Plants or Transport required for carrying out daily maintenance and necessary stationary & documents (log books, test records etc.) for maintaining the records at each installation will be arranged by the contractor and nothing extra will be admissible on this account. (e) The operator should take care of power factor in TOD meter and report immediately to the JE / AGE in case of disturbed pf. In case of negligence, any penalty imposed by the AP State Electricity board for the low pf will be recovered from the Contractor. (f) The rate quoted by contractor shall deem to be included for cleaning of the premises of installation including monthly periodical cutting of grass, Vegetation and keeping the installation neat and tidy in all the manners. (g) Contractor has to provide the Log sheets and their employees have to maintain the same as the details of Pumping time, Gen set Running time duly signed by the AGE & JE at every day (h) Contractor has to submit the duty roaster in advance for every month duly singed by Contractor & JE (j) Contractor has to provide one mobile Phone with mobile No for receiving & attending emergency Complaints from user side/ concern JE/AGE E/M (k) The proof of Actual payment to employees shall be kept on record and shall be submitted to Engineer in Charge alonwith RAR / FB for Verfication. (l) DHPP for operation of DG Sets will be issued by the Department free for filling in DG Sets only. Labour for loading, unloading and collection of fuel (DHPP) from MT will be arranged by the contractor of their own cost. However transport / vehicle for conveyance of fuel will be provided by the Department/Govt. USR, Gate Pass will be issued by the Department only. (m)Contractors shall adhered to payment of fair minimum wages as Govt circular issued from time to time including payment of contribution towards ESI & EPF in any case irrespective of quoted rate. (n) The cost of minor spares shall be included in the quoted rate. (o) The installations will be handed over in operating state on the date of commencement of work. (p) The quoted rate shall include for all the above aspects. No claim whatsoever shall be allowed at a later stage.
Dismantling of unserviceable flange coupling from centrifugal pumping set of capacity 10 HP to 12.5 HP installed for pumping of clear water carefully and supply & replacing the same with tyre coupling incl required machinery work of shaft, aligning of motor etc complete all as specified and directed.
M&L for repair to starter by replacing the Contactor as required at site complete all as specified and as directed.
Dismantling of 10 HP to 12.5 HP motor electric from foundation and pump opening the same and servicing of motor by cleaning internally and externally , varnishing of stator, greasing of bearing , fittings alignment , connecting electrically , re-fixing and testing etc complete all as specified and directed. Note :The job shall be done at plant only. Next servicing of motor will be due after six months on the date of first servicing under this contact.
S&F in repair One run of Single core 6 sqmm PVC insulated sheathed, multistranded copper conductor FRLS cable 1100 volts as connecting wire for starter connections and LT panel internal Busbar connections complete all as specified and directed. Make: Polycab/ Plaza / Havells / anchor / Finolex.
S&F in repair One run of Single core 10 sqmm PVC insulated sheathed, multistranded copper conductor FRLS cable 1100 volts as connecting wire for starter connections and LT panel internal Busbar connections complete all as specified and directed. Make: Polycab/ Plaza / Havells / anchor / Finolex.
G V N R CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .