Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.5 LAdmitted-Fee/PreQual/Technical/Finance | -23.01% | ₹22.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹23.9 L+₹1.4 L (6.05%)Admitted-Fee/PreQual/Technical/Finance AT WORDNO 15 PS BOUCH TOAN DIST BOUCH PIN 762014 | BOUDH | ODISHA | 762014 | -18.35% | ₹23.9 L+₹1.4 L (6.05%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹25.4 L+₹2.9 L (13.0%)Admitted-Fee/PreQual/Technical/Finance | -12.99% | ₹25.4 L+₹2.9 L (13.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹25.7 L+₹3.2 L (14.3%)Admitted-Fee/PreQual/Technical/Finance | -12.01% | ₹25.7 L+₹3.2 L (14.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹28.9 L+₹6.4 L (28.6%)Admitted-Fee/PreQual/Technical/Finance | -1.00% | ₹28.9 L+₹6.4 L (28.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹29.2 L
EMD Value
₹29,230
Closing Date
20 Aug 2026, 1:30 pmClosed
SE RWSS DIVISION, PHULBANI
At- Kendupadar Phulbani Pin-762001
Construction of E-type Quarter at RWSS Section-III Daringibadi under RWSS Division Phulbani.
2026_RWSS_137945_2
SE(RWSS) PLB-04/2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
SE RWSS DIVISION, PHULBANI
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹29,230
Yes
21 Aug 2026
4 Aug 2026
21 Aug 2026
4 Aug 2026
20 Aug 2026
4 Aug 2026
4 Aug 2026 - 14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying all labour, materials T&P for Earth work excavation of foundation in hard Soil including rough dressing and leveling the bed etc. complete. | 68.29 | Cum | 296.87 | ₹20,273.25 |
| 2 | Supplying all labour, materials T&P for filling foundation and plinth with sand including cost, conveyance & taxes etc. complete. | 100.79 | Cum | 630.29 | ₹63,526.93 |
| 3 | Supplying all labour, materials T&P for providing Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. | 25.61 | Cum | 6,995.6 | ₹1,79,157.32 |
| 4 | Supplying all labour, materials T&P for R.C.C. M-25 using 20 mm & down size b.h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. (Column base footing) | 11.71 | Cum | 7,720.8 | ₹90,410.57 |
| 5 | Column Super structure | 3.61 | Cum | 17,112.7 | ₹61,776.85 |
| 6 | Plinth Beam | 4.34 | Cum | 8,596.48 | ₹37,308.72 |
| 7 | Lintel beam | 2.04 | Cum | 15,447.65 | ₹31,513.21 |
| 8 | Floor beam | 6.12 | Cum | 15,051.44 | ₹92,114.81 |
| 9 | Roof slab | 11.09 | Cum | 15,051.44 | ₹1,66,920.47 |
| 10 | Straightening, cutting, bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S. rods or tor confirming to I.S. 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C. works including cost, conveyance and taxes of M.S. rods or tor steel and binding wires of 18 to 20 gauge and cost of all labour etc.complete in all respect. | 46.02 | Qntl | 8,578.95 | ₹3,94,803.28 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.54 MB
Etype-Daringibadi-Section-III-TCN-04.pdf
Tender Documents • 1.76 MB
BOQ_604692.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .