Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance CHENGALPATTU TAMILNADU 603209 UDYAM UP 50 0002523 33AACCM8669A2ZJ R 05AACCM8669A1ZJ M 09AACCM8669A1ZB M 33AACCM8669A2ZJ M MII STATUS AS VERIFIED | CHENGALPATTU | TAMIL NADU | 603209 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance DISTRICT COUNCIL HAZARIBAGH | HAZARIBAGH | JHARKHAND | 825301 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹13.1 Cr
EMD Value
₹26.2 L
Closing Date
20 May 2026, 5:00 pmClosed
Chief General Manager (Civil)
404, 4TH Floor, Shree Ramakrishna Enclave, Adalhatu Road, Morabadi, Ranchi-834008, Jharkhand
CONSTRUCTION OF NEW LINE/MODIFICATION BY COMPLETE TRACK RENEWAL OF EXISTING RAIL LINES OF WHARF WALL LOADING PLATFORM OF GIDDI-A RAILWAY SIDING UNDER ARGADA AREA OF CCL IN THE STATE OF JHARKHAND, INDIA.
2026_IPRCL_275591_1
IPRCLRanchiCCLGiddiWorks96
Open Tender
Civil Works
365 days
Giddi Argada Area Ramgarh Jharkhand
Please refer tender document
5 documents required · 5 mandatory
₹0
₹26.2 L
IPRCL Ranchi Office
9 Jul 2026
23 Apr 2026
21 May 2026
24 Apr 2026
20 May 2026
24 Apr 2026
24 Apr 2026 - 29 Apr 2026
30 Apr 2026
Percentage in Words
Earthwork in Formation
Ballast Supply
P.Way Supply : Other than steel items
P.Way Supply : Steel Items
Permanent Way Linking: Installation Works
Permanent Way Linking: Supply and Installation Works
Construction of Drain
Construction of Wharfwall Platform
Construction of Buildings: (Service Building, Crew guard rest room,weigh bridge room & security room, A cabin room)
Miscellanceous Works
Supply of Rainforcement Steel
Supply of Cement
Site Facilities
Total Price =
Description of Schedule
Earthwork in Formation
Ballast Supply
P.Way Supply (Other than steel items)
P.Way Supply (Steel Items)
Permanent Way Linking: Installation Works
Permanent Way Linking: Supply and Installation Works
Drain
Platform(725 x 10)m
Building Works
IMWB room, Crew room etc.
Service Building
Misc. Work Incl. Dismantling Work
Construction of Approach road
In Motion Weigh Bridge
Site Facilities
vetted
Description of Item
Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps,trolley refuges,platforms etc, with contractors own earth conforming to soil quality class SQ1/SQ2/SQ3, after preparation of foundations as applicable benching in existing banks wherever required spreading in layers with motor grader bringing the moisture content to OMC, mechanical compaction to specified density and dressing of bank to final profile as per RDSO specifications :RDSO/2020/GE:IRS-0004 with latest correction slip . Note 1) Foundation preparation,Benching including additional earthwork on account of this wherever required shall be paid extra under relevant schedule item for benching . 2) payment for earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines
Using Soil Class SQ2
Earthwork in cutting in formation trolley refuges, side drains, level crossing approaches,platforms, catch water drains,diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profiIe inclusive of all labour, materials, plant & machinery leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either Side of edge of the cutting (s) including all lifts ascent descent, loading,Unloading bailng & pumping out water if required clearance of site and all other works incidentals there to for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest Updated correction slips and to the satisfaction of the Engineer-in -charge Note: (i) AlI usable earth arising from cut Spoils shall be led into bank formation and Unusable spoils shall be dumped /stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and wil be property of Railways/IPRCL/CCL. (iii)Cut trees shall be property of Railways/IPRCL/CCL and to be deposited in the godown Unless specified otherwise in the condition of contract.
ln all conditions and Classifications of soil except rock
Manufacturing of blanketing material by wet mixing of naturally available suitable soil including additional blending with naturally available suitable soil including additional blending with naturally available of manufactured material as required to achieve specified gradation, in designed proportion in pug mill or wet mix plant to have uniform gradation including all incidental transportation laying over finished formation in uniform layer(s) with motor grader, compaction with suitable vibratory roller to specified density and finishing to correct profile complete as per RDSO specification No. RDSO/2020/GE :IRS 0004 with latest correction slips.
Preparation of foundation for embankment by cleaning , grubbing, stripping top soil ( average 150mm) and stacking beyond foundation area, therafter ploughing and pulverising 150-200mm of top of soil with tractor trolley , mixing water to achieve OMC with water sprinkler or left for natral draing , as required, and compaction with vibratorty roller of suitable capacity to achieve 98% MDD for laying fast layer of soil for embankment construction.
Description of Item
Supply & delivery of machine crushed ballast from black stone of 50mm size clean angular, hard and durable track ballast as per specification & stacking the same on cess of the formation or toe of the bank or at suitable places as directed by EIC at site. The rate includes all the cost of leads, lift, royalty, sale tax and other taxes & duties & all incidental charges complete as applicable. Tools, plants, & screens of approved mesh & dimensions required for inspection & passing at the time of measurements are to be arranged by the contractor. The rate also includes levelling of ground, if necessary, where the ballast are to be stacked.
Handling lifting & leading of ballast from stacks with any lead, which has been dully measured & spreading ballast on formation, track & turnouts to ensure uniform & compacted ballast cushion under the sleepers desired ballast profile. Spreading of Ballast should be as per the technical specifications. Spreading of ballast on the formation will be done only after supply is completed for a particular stretch as decided by Engineer-in-Charge and ballast stacks have been released for spreading.
Description of Item
GFN Liners to RDSO Drg. No. T-6938 with latest alteration, if any.
Combination GFN liners to RDSO Drg. No.T-3707 and T-3708 with latest alteration, if any.
Composite Grooved Rubber Sole Plates (CGRSP) to RDSO Drg. No. T-8528 with latest alteration, if any
End cut GFN liner - 60 kg Manufacture & supply of end cut 60 kg Glass filled nylon 66 insulating liner confirming to RDSO Drg. No. T-3706 with latest alterations and as per IRS Specification T-44-1995 with latest alterations. Note-End cut is to be done for glued joint as per RDSO drawing No. T-4511 with latest alteration complete.
End cut combination GFN liner Manufacture & supply of end cut combination GFN liner 60/52 kg confirming to RDSO Drg. No. T-3707a & 3708a with latest alterations and as per IRS Specification T-44-1995 with latest alterations.
Supply of glued insulated rail joints G3 L 6.5 M long with 10 MM thick end post on PSC sleepers. Rails will be issued free of cost by the Employer @ 6.5 M for each joint.
Manufacturing, Supplying, Transportation of B.G Monoblock prestressed monoblock concrete sleeper(wider) as per RDSO's Dwg. No- T-8527 with latest alteration if any, including leading, loading & Unloading and stacking as per IPRWM and all along and both side of the siding alignment or as directed by the engineer in charge
Supplying at site of work including leading, loading, unloading and stacking of Special PSC Monoblock Sleepers (pre-tensioned type) for B.G. 1 in 8½ Derailing Switch as per RDSO Drg. No.-T-6068 to suite both 52/60 kg rails as per RDSO Design and IRS Specifications No. T-45-96 (2nd Edition) as amended from time to time with contractor's labour, materials, tools & Plant, equipment and machinery, transport etc complete .
Supplying at site of work including leading, loading, unloading and stacking PSC turnout sleepers and approach sleepers for fanshaped layout of 60 kg 1 in 8.5 turnout for B.G 60 Kg. (UIC) rail/52 kg rails to RDSO Drg. No. T-4865 Alt-5(RT-4793 to 4844 & RT-4512) (for general layout) and drawings thereof with latest alterations if any, complete set with contractor's labour, materials, tools & Plant, equipment and machinery, transport etc complete .
Supply of Grooved Rubber Sole Plates for 1 in 8.5 turnouts for layout Drg no. T-4865 with latest alterations if any, complete set for the turnout as per IRS specification for Grooved Rubber Sole Plate (6mm thick) for placing beneath rails Sl. No. T-47-2006 with up to date corrigendum if any
Description of Item
Transportation of rails, switches, crossings, etc. from point of issue to their final location of laying in track
Average lead, from the place of issue upto the middle point of location of laying in each KM, upto 10 KM
Incremental rate for lead beyond 10 KM under item 5006 (a) above
ERC to RDSO Drg. No.T-3701
Metal liner to RDSO Drg. No.T-8616
ERC "J" to RDSO Drg. No.T-4158
Supply of Combination fish plates (4 Nos. per set) as per Drawing No.T696 to T699 including nuts, bolts and washers.
For 60 KG & 52 KG Rail Sections
Supply of joggled fish plates (2 No. per set) with 4 pair clamps, 4 No. Bolts & Nuts and 8 No. special washers.
For 60 KG as per RDSO Drawing No. T -4016/T-5849
Supply of Fish plates one meter long as per standard drawing of RDSO
60 KG rail (As per RDSO Drg.No.T-5916/T-5851 )
Supply of 60 kg 1 in 8.5, 6400mm Overriding Curved Switch confirming to RDSO Drg. No. T-4966/T-5353 with latest alteration, if any complete with all parts as listed in the drawing with check rails (excluding fish plates, Fish bolts & nuts, GRSPs, Liners and ERCs). Note: Rails will be issued free of cost by the IPRCL/CCL.
Supply of 60 kg CMS Crossing for 1 in 8 ½ PSC Layout conforming to Drg No. T-4967 with latest alterations complete with all parts as listed in the drawing (excluding fish plates, fish bolts & nuts, GRSPs, Liners and ERCs).
Supply of 60KG 1 in 8 ½ Derailing Switch conforming to RDSO Drg No. 6068 with latest alteration, if any complete with all parts as listed in the drawing including GRSPs (excluding fish plates, fish bolts & nuts, Liners and ERCs). Note : Rails will be issued free of cost by the IPRCL/CCL.
Any other works required in future will be done as per latest IPRCL SOR/CR USSOR/ECR USSOR with escalation @ 5% per annum from year of issue of rate.
Description of Item
Cutting of 60 KG, 52 KG, 90 R rails with contractor’s Abrasive Disc Cutter complete including men, material, fuel etc. true to square.
Drilling 26.5 MM, 32 MM diameter holes with Rail Drilling Machine in web of 60 KG, 52 KG, 90 R rails in track or on cess at correct locations including chamfering.
Installation of BG track as per methodology specified in para 4.0 of Section 5: Specifications in the Bidding Documents or any other methodology approved by the Employer in all locations e.g. straight, curves, bridges, level crossings, yards etc. including installation of SEJ and glued joints including installation and dismantling of auxiliary track. NOTE: (i) 70% of the rate shall be paid after placement of the sleepers, rails, fastening, initial squaring, initial alignment (generally corrected by eyesight) correcting sleepers spacing and Katcha Packing (ii) Next 15% of the rate shall be paid after 1st manual/ off-track tamper packing/ lifting/leveling /alining of the track and making fit for movement of moped trolley/motor trolley/material trolley/ ballast loory. (iii) Next 10% of the rate shall be paid after second manual packing including picking of slacks between 1st and 2nd packing and bringing the track parammeters within the prescribed tolerance limits to make track fit for 45kmph for working of track machines /material trains/wiring trains etc. and is certified so by the engineer. (iv) Balance 5% of the rate shall be paid after picking of any slacks etc. for making the track fit for getting ready for final inspection from Railways/IPRCL. (v) For the measurement and payment purposes, the length of track from central line of first special sleeper to central line of last special sleeper shall be multiplied by 2 in case of bridge and level crossing provided with guard/check rails and to be multiplied by 3 in case of SEJ. (vi) The rate includes initial packing on 1st day, 1st through packing on 2nd day, 2nd through packing on 3rd day and Picking up of slacks, as required, from 4th to 9th day. The speed on 1st day will be 20 kmph and the same will be relaxed to 45 kmph on 9th day after aforesaid activities.
Through packing of track as per procedure prescribed in latest edition of Indian Railways Permanent Way Manual.
For PSC sleeper Track with sleeper density of 1540 sleepers/km or more.
First or second Through packing of track of all sleeper density including giving a general lift as desired to eliminate sag after deep screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilition as per procedure prescibed in latest edition of IRWPM. Note: General lift is normally 25mm and isolated lift may be upto 25mm.
For PSC sleeper Track with sleeper density of 1540 sleepers/km or more.
Third or Subsequent Through packing of track of all sleeper density including picking of slacks as required after second through packing, subsequent to Deep Screening work as per procedure prescribed in latest edition of IRPWM. This item can also be used after lifting/regarding/realignment works also. Note: General lift is normally 25mm and isolated lift upto 50mm .
For PSC sleeper Track with sleeper density of 1540 sleepers/km or more.
Installation of PSC fan shape turnouts, derailing switches 60 KG / 52 KG including lead rails as per RDSO layout drawings including katcha packing with bars or off track tampers for 20 KMPH speed. Activities of rail cutting, drilling of holes, welding of joints and transportation are not included in this item and shall be paid separately under relevant items.
Turnouts 1 in 8-1/2
Derailing switches
Anticorrosive painting of 60 KG, 52 KG rails. Painting to be done prior to installation on sleepers including touching of paints in areas damaged during fixing.
Provision of Buffer stop of 60 KG, 52 KG, 90 R rail section as per plan including painting with luminous paint etc. as directed by the engineer. Note: Rail required for this item will be issued free of cost by the Employer/IPRCL.
USFD testing of 60 KG, 52 KG rail welds (Flash Butt / SKV) as per RDSO Manuals and submitting reports on proforma as directed by the Engineer.
Fouling marks of size 1500x250x225 MM in M20 grade cement concrete including engraving the letters “FM”, white washing with two coats and painting the letters in black enamel paint indicating the numbers of vehicles duly fixed at site.
First and second manual through packing of points and crossing including gauging, fittings recoupment, elimination of sag and to the required alignment as per provisions of Indian Railways Permanent Way Manual for raising the speed from 20 kmph to 45 kmph. NOTE: The rate includes 1st through packing on 2nd day after relaying on Day 1 (laying of turnout will be paid separately under relevant item of BOQ), 2nd through packing on 3rd day and Picking up of slacks, as required, from 4th to 9th day.
1 in 8-1⁄2 Points & Crossing
1 in 8-1⁄2 Derailing Switch
Third or subsequent manual through packing of points and crossing including gauging, fittings recoupment, elimination of sag and to the required alignment as per provisions of Indian Railways Permanent Way Manual for raising the speed from 45 kmph to 75 kmph. NOTE : The rate includes packing on 10th day after relaying and picking of slacks for next 10 days for raising the speed from 45 kmph to 75 kmph.
1 in 8-1⁄2 PSC layout
1 in 8-1⁄2 Derailing Switch
Providing FOB, platform shelters, height gauge, columns, beams, trusses and other steel components of miscellaneous works duly launched in position with or without traffic block as directed by Engineer with contractors steel conforming to IS:2062-1999 including fabrication, assembly, erection, launching, riveting/welding, bolting, initial coats of zinc chromate priming conforming to relevant IS specification and three subsequent coats of aluminum paint of approved quality conforming to IS:2339 after final erection on all surfaces complete. Rate is inclusive of supply and fixing of MS holding down bolts for IRS type platform shelters and FOBs with required angles.
Dismantling of existing BG track, turnouts, derailing switches, dead ends, sand humps, etc. of any rail section and any type of sleepers of any density and transporting all released material including sleepers, rails, switches, crossings and fittings & fastenings to the nearest station or manned level crossing or road loading point as directed by the Engineer.
Plain track including SEJ and Glued Joints and track at level crossing, bridge & bridge approaches and sharp curves with check rails
Gas cutting of rail of various sections with the contractor's tools & plants, as directed by engineer-in-charge:
Rail section of 52Kg and above
Providing temporary Buffer Rails of fish plated joints of 3 pairs, measuring 6.5m each, duly removing rails of the existing track including cutting & drilling of rails of the existing track including cutting & drilling of rails as required for isolating LWR/CWR on all types of track structure. Work will be done under traffic block condition. Note.: 1. Each set comprises of 3 pairs of rails 6.5m long only. 2. Only Rails fish plate and fish bolts will be supplied free by Railway/IPRCL within free lead of 250m.
Shifting of P.way materials such as rails, sleepers, points and crossings, fastening etc. and stacking at the nominated place upto 250m lead as directed by Engineer-In-charge including all lift , labour, tools and machinery etc. complete.
For lead upto 50m
Extra For lead for every 50m or part therof beyond initial 50m lead
Description of Item
Alumino thermit welding of 60kg/52 kg rail joints or combination joints of 60kg/52kg rail by pre-heat (SKV) welding technique using compressed air petrol/LPG for preheating, three piece pre-fabricated moulds (Zircon washed) single shot crucible fitted with automatic tapping thimbles with all labour, materials including supply of portion, tools and plants, aligning of rails, placing & fixing of mould, preheating, welding, mechanised trimming, grinding with profile grinder (including riser), testing, marking, painting with one coat of high build epoxy paint (two pack conforming to RDSO specification no. M&C/PCN-111/88) on the welded area up to 10 cm on either side. The work is to be completed in all respects as per IRS: T-19-2012 with latest updates and in accordance with “RDSO Manual for Fusion Welding of Rails by Alumino Thermic Process with up to date correction Slips in free rails or 3/10/20 rail panels. The work to be done under supervision of trained welding supervisor and carried out by trained welder having valid competency certificate from RDSO/TPP, Lucknow. Ultrasonic testing of welded joints shall be paid separately under relevant items. Note: 1) In case only portion is supplied by the contractor but welding is not done the rate shall be payable @ 60% of the item rate. 2) In case welding portion is supplied free of cost by IPRCL, the rate shall be payable @ 40% of the item rate. 3) The above provision in note (1) & (2) shall be operated with the specific approval of CGM/IPRCL
for 60kg Rails (R-260)
Description
Earthwork in B4:B11 trolley refugees, side drains, level crossing approaches, platforms, catch water drains, diversions of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading al cut spoils either to make spoil dumps of for filling of embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water if required clearance of site and all other works incidental thereto for completing the work as per RDSO specification No. RDSO/2020/GE:IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note-(i) All usable earth arising from cut spoils shall be led into bank formation and unsuable spoils shall be dumped /stacked away from toe of embankment. (ii) All hard rock/ and boulders not fit for filling will be stacked by the contractor and will be property of the Railways/IPRCL/CCL. (iii) Cut trees shall be property of Railway/CCL and to be deposited in the Railway/IPRCL/CCL godown unless specified otherwise in the condition of contract.
ln all conditions and Classifications of soil except rock
Supplying, spreading and filling coarse sand ( no cohesive materias to be used) of approved quality including watering and ramming in foundation, plinth, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction of Engineer-in-Charge. The rate includes all lead lift, contractor's labour, materials, tools and plant
Providing & laying in position plain cement concrete of specified nominal mix for miscellaneous works like side drains, foundation, for OHE mast and other miscellaneous structures excluding the cost of cement, centring and shuttering- all work upto plinth level
PCC M-15 in levelling course, 1:2:4 (1 cement : 2 sand( Zone-III): 4 graded stone aggregate 20 mm nominal size)
PCC M-20 Grade design mix with contractor’s 20mm. graded black trap course aggregate, sand etc. including necessary , cutting, bending, placing and binding reinforcement with contractors binding wires, complete as directed.
Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub- structure e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, abutments cap, Pier cap, Inspection Platform & Pedestal over Pier Cap, Fender Wall, Diaphragm wall etc. upto 5m above ground level.
Description
Earthwork in cutting in formation trolley refuges, side drains, level crossing approaches,platforms, catch water drains,diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profiIe inclusive of all labour, materials, plant & machinery leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either Side of edge of the cutting (s) including all lifts ascent descent, loading,Unloading bailng & pumping out water if required clearance of site and all other works incidentals there to for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest Updated correction slips and to the satisfaction of the Engineer-in -charge Note: (i) AlI usable earth arising from cut Spoils shall be led into bank formation and Unusable spoils shall be dumped /stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and wil be property of Railways/IPRCL/CCL. (iii)Cut trees shall be property of Railways/IPRCL/CCL and to be deposited in the godown Unless specified otherwise in the condition of contract.
ln all conditions and Classifications of soil except rock
Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated materials, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil upto a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer - in charge. Note : This item will be used for excavation work in connection with other miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structure in connection with gauge conversion, Doubling, new lines.
All Kinds of Soil
Soft rock (not requiring blasting)
Earth work in filling-OB filling: Re-Handling of OB: Earth work in filling/ re-handling of over burden all kinds of soil/rocks including granular & boulders (consisting of top soil, alluvium soil, blast rock etc.) including excavation of OB laying in dump area as demarcated by CCL, loading & transportation of excavated OB and dumping in the abundant quarry as demarcated by IPRCL, dozing, grading, levelling at dump sites including face & other specified place, preparation & dewatering of working face, maintenance of haul roads, water sprinkling on haul road as per instruction of the Engineer-in-charge.
Lead between 0 Km - 1 Km (mean lead 0.5Km)
Lead between 1 Km - 2 Km (mean lead 1.5Km)
Lead between 2 Km - 3 Km (mean lead 2.5Km)
Lead between 3 Km - 4 Km (mean lead 3.5Km)
Lead between 4 Km - 5 Km (mean lead 4.5Km)
PCC M-15 in levelling course, 1:2:4 (1 cement : 2 sand( Zone-III): 4 graded stone aggregate 20 mm nominal size)
Supplying, spreading and filling coarse sand ( no cohesive materias to be used) of approved quality including watering and ramming in foundation, plinth, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction of Engineer-in-Charge. The rate includes all lead lift, contractor's labour, materials, tools and plant
PCC M-20 in levelling course, 1:1.5:3 (1 cement : 1.5 sand : 3 graded stone aggregate 20 mm nominal size)
Providing and laying in position machine batch , machine mix , and machine vibrated cement concrete of specified grade as per approved design mix ( Mix in mobile concrete batching/ mixing plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation and pile cap including finishing using plasticiser in approved proportions ( as per IS 9103) to modify workability without impairing strenght and durability complete as per specification and direction of the engineer-in-charge. Note: 1. Payment for cement, reinforcement & shuttering shall be made extra relevant items. 2. Plastisier shall be invariably be used in approved proportion to increase workabalility in minimum possible quantity of cement for all grade of design mix concrete unless it is specifically approved citing reasons for not using plastisiers at the stage of mix design in that case deduction shall be made as per relevant item.
Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub structure e.g. pier, abutment,wing wall,retaining wall,RCC box type foundation, Abutment cap, pier cap,Inspection Platform & Pedestal over pier cap, Fender wall, Diaphragm wall etc.upto 5m above ground level
Description
Construction of service buildings, Crew guard rest room, weigh bridge room, security room and a cabin room etc. in yards and in mid section as per layout drawing provided by the employer and detailed specifications provided in section 5: works requirements of the bidding documents including preparation and proof checking of architectural plan and structural design and drawings. Rate includes cost of cement steel and all other materials and labour. NOTE: (1) The rates under the item cover the cost of construction of superstructure only. Foundations of the building upto plinth shall be payable under the relevant items of BOQ (2) For construction of single storey building, foundation of the building is to be designed for double storey. (3) For building proposed to be built for more than four stories should be designed as framed structure only. (4) Additional 50% rates over and above the accepted rates shall be payable for construction of Isolated buildings outside ‘Station Section’ (‘Station Section’ for this purpose will mean the section between outermost facing points of a station) such as gate lodges, SP/SSP, Relay Hut, IBH building, gate lodge cum IPS building at interlocked gates. The additional rates shall be applicable on foundation as well as in superstructure items. (5) The rates do not cover General Electrification of buildings and the same shall be payable under ELECTRICAL GENERAL SERVICES WORKS.
Ground floor and subsequent floors of Service building (floor height upto 8.0 m).
Extra payment for provision of internal sanitary and water supply installations.
Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated materials, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil upto a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer - in charge. Note : This item will be used for excavation work in connection with other miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structure in connection with gauge conversion, Doubling, new lines.
All Kinds of Soil
Filling available excavated earth (excluding rock) in trenches plinth,sides of foundations etc. in in layers not exceeding 20cm in depth: consolidating deposited layer by ramming and wsatering, lead up to 500 m and lift up to 1.5m.
Supplying, spreading and filling coarse sand ( no cohesive materias to be used) of approved quality including watering and ramming in foundation, plinth, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction of Engineer-in-Charge. The rate includes all lead lift, contractor's labour, materials, tools and plant
Providing and laying in position cement concrete of specified proportion excluding cost of cement, centering and shuttering - All works upto plinth level :
PCC M-15 in levelling course, 1:2:4 (1 cement : 2 sand( Zone-III): 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. All works upto plinth level (Note :-Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).
Centring and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone - III) : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth.
Description
Construction of Road:
Preparation and consolidation of subgrade with power road roller 8 to 12 tonne capacity after excavating earth to an average of 22.5cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the subgrade and disposal of surplus earth with lead upto 50metres
Earthwork in B4:B11 trolley refugees, side drains, level crossing approaches, platforms, catch water drains, diversions of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading al cut spoils either to make spoil dumps of for filling of embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water if required clearance of site and all other works incidental thereto for completing the work as per RDSO specification No. RDSO/2020/GE:IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note-(i) All usable earth arising from cut spoils shall be led into bank formation and unsuable spoils shall be dumped /stacked away from toe of embankment. (ii) All hard rock/ and boulders not fit for filling will be stacked by the contractor and will be property of the Railways/IPRCL/CCL. (iii) Cut trees shall be property of Railway/CCL and to be deposited in the Railway/IPRCL/CCL godown unless specified otherwise in the condition of contract.
Soft rock not requiring blasting
Providing 40mm premix carpet surfacing with 10 -12.5 MM nominal size stone aggregate @ 5.4cum per 100 SqM and 54kg hot bitumen per cum of stone aggregate complete with paving asphalt 80/100 heated and then mixed with solvent at 70gms per Kg of asphalt. The rate also includes tack coat using hot straight run bitumen of grade 80/100 @ 0.75kg per sqm and perparation of existing road surface as per specifications.
Providing seal coat of premixed fine aggregate (passing 2.36MM and retained on 180 micron sieve) with bitumen using 128Kg of Bitumen of grade 8500 per Cum of fine aggregate and 0.60cum of fine aggregate per 100 Sqm of road surface including rolling and finishing with roller complete.
Providing bitumen penetration macadm with hard stone aggregate of specified size and grading and with bitument of suitable penetration grade inculding consolidation with road roller complete.
For 50 MM compacted thickness using coarse aggregate of size 40-20 MM graded and key aggregate of size 12.5 MM graded.
For 75 MM compacted thickness in two layers using stone aggregate of size 63-41 MM graded and key aggregate of size 20 MM graded.
STRUCTURE DISMANTLING WORKS:
Demolishinng R.C.C work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50meter lead as per direction of Engineer-in-charge.
Dismantling brick or stone masonary in lime or cement mortar under 3m height including stacking the useful materials for reuse and removing the debris within 50m cleaning the debrises with all taxes, including leads & lifts transportation & disposing at specified place as per direction of Engineer-in-Charge.
Dismantling steel work in building up section in angles, tees, flats and channels inculding all gusset plates, bolts, nut, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead.
Misc any unforseen work: item avaliable as per latest IPRCL SOR/CR USSOR/ECR USSOR with escalation @ 5% per annum from year of issue of rate.
Description
Thermo-Mechanically Treated bars of grade Fe-500D or more of approved brands/makes.
Description
Pozzolana Portland Cement approved brand/makes
Description
Providing site offices for Employer with Contractor's material, Labour, Tools and Plant, Equipment etc. including provision of Water Supply, Drainage, Power arrangements, office maintenance as per the details mentioned in clauses 3.1 to 3.2.8 & 3.5 to 3.5.2 of Chapter 3 (Site Facilities for the Employer and the Engineer) of Section 5 (Work's Requirement) of Tender Documents. Note 1: This item is provided with the contention that new site offices will be constructed for this purpose and 75% payment of the accepted rates will be made after making available functional office, balance 15% payment shall be made at the end of the completion period and the remaining 10% will be paid after clearance of site by the contractor. Note 2: Alternatively if suitable accommodation is available on hire basis at suitable location acceptable to the employer, the contractor can arrange the same under the item but in such a case the payment shall be regulated as below. (a) 10% payment shall be made on completion of one month from the date of making available the office fit for functioning. b) Remaining 90% payment shall be paid in equal monthly instalments that is (0.9xQuoted rate) / (Stipulated Completion period in months + defect liability period in months). Note 3: In case stipulated period gets extended, payment on monthly basis, under this item, in such extended period, shall be made as under; (i) in case of new construction @ [(54% of Quoted rate) / (Stipulated Completion period in months + defect liability period in months)] per Sq.m. of Plinth area. (ii) in case of accommodation on hire @ [(90% of Quoted rate) / (Stipulated Completion period in months + defect liability period in months)] per Sq.m. of Plinth area.
Providing Furniture at Site Facilities for the Employer and the Engineer as per clause 3.3 of Section-5 Works Requirement.
Providing Road Vehicle mentioned below for the use of Engineer/Employer as per the Conditions mentioned in Clause 3.4 of Chapter 3 (Site Facilities for the Employer and the Engineer) of Section 5 Work's Requirement) of Tender Documents. Note: The provisions of clause 12.3.1 (a) (ii) of Section 6 (GCC) of the Contract shall not be applicable for appropriateness of new rate for this item.
BOLERO, SCORPIO, ERTIGA, MARAZZO or similar (2 nos)
Item Description
Earthwork in Excavation in Foundation:
Footing PCC
Footing RCC
Column up to Plinth Level RCC
Plinth Beam RCC
Grae Slab RCC
Column Up to Slab Level RCC
Brick Masonry
In Side Plaster
Out Side Plaster
Ceiling Plaster
Slab RCC
In Side Paint
Out Side Paint
Skin Reinforcement(Fe-500 grade)
Earth work in excavation as per approved drawings and dumping at embankment site or spoil heap, within railway land, including 50m lead and 1.5m lift, the lead to be measured from the centre of gravity of excavation to centre of gravity of spoil heap; the lift to be measured from natural ground level and paid for in layers of 1.5m each including incidental work, as per specifications - All kinds of soils
Suspended floors, roofs, landings, balconies and access platform
Lintel beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Post and struts
Making plinth protection 50mm thick of Cement Concrete 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 20mm nominal size) over 75mm bed of cement dry brick aggregate 40mm nominal size rammed, consolidated and grouted with fine sand including necessary excavation, levelling, dressing & finishing the top smooth
Brick work with common burnt clay non-modular (FPS) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) excluding cost of cement
Brick work with common burnt clay non-modular (FPS) bricks of class designation 7.5 in superstructure above plinth level up to floor/Roof level in all shapes and size in cement mortar 1:4 (1 cement : 4 coarse sand) excluding cost of cement
Half Brick masonry with common burnt clay non-modular (FPS) bricks of class designation 7.5 in superstructure above plinth level up to floor/roof level in all shapes and size in cement mortar 1:4 (1 cement : 4 coarse sand) excluding cost of cement
12mm Cement Plaster of mix excluding cost of cement:
1:4 (1 cement : 4 coarse sand)
1:6 (1 cement : 6 coarse sand)
15mm Cement Plaster on the rough side of single or half brick wall of mix excluding cost of cement:
1:4 (1 cement : 4 coarse sand)
6mm Cement Plaster to ceiling of mix excluding cost of cement:
1:3 (1 cement : 3 fine sand)
Neat cement punning
Providing and applying plaster of Paris putty of 2mm average thickness over plastered surface to prepare the surface even and smooth complete
Finishing walls with water proofing cement paint of required shade two or more coats on new work applied @ 3.84 kg/10 sqm
Distempering two or more coats on new work with 1st quality acrylic washable distemper (ready mixed) of approved manufacturer and of required shade and colour complete as per manufacturer’s specification
Providing and fixing pressed steel door frames confirming to IS: 4351, manufactured from commercial mild steel sheet of 1.6mm thickness including hinges jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50mmx25mm, or base ties of 1.6mm pressed mild steel welded or rigidly fixed together by mechanical means, adjustable lugs with split end tail to each jamb including steel butt hinges 25mm thick with mortar guard, lock strikeplate and shock absorbers as specified and applying a coat of approved steel primer after pretreatment of the surface as directed by the Engineer-in-Charge. Fixing with adjustable lugs with split end tail to each jamb.
Providing and fixing to IS:2202 Part-1 marked flush door shutter decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3-ply veneering with vertical grains or cross bands and face veneers on both faces of shutters. 35mm thick including ISI marked stainless steel butt hinges with necessary screws
Providing and fixing aluminium handles ISI marked anodised (anodic coating not less than grade AC 10 as per IS:1868) transparent or dyed to required colour or shade with necessary screws etc. complete: 100mm
Providing and fixing bright finished brass hanging type door floor stopper with necessary screws etc. complete
Providing and fixing aluminium sliding door bolts ISI marked anodised (anodic coating not less than grade AC 10 as per IS:1868) transparent or dyed to required colour or shade with nuts and screws etc. complete : 300mmx16mm
Providing and fixing aluminium tower bolts ISI marked anodised (anodic coating not less than grade AC 10 as per IS:1868) transparent or dyed to required colour or shade with necessary screws etc. complete : 200mmx10mm
Providing and fixing factory made UPVC door frame made of uPVC extruded section having an overall dimension as below (tolerance ±1mm) with wall thickness 2mm ± 0.2mm, corners of door frame to be mitered and welded of plastic, galvanized brackets and stainless steel screws. Hinge side vertical of frames reinforced by galvanized MS tube of size 19mmx19mm and 1mm ± 0.1mm wall thickness and 3 nos. stainless steel hinges fixed to frame complete as per direction of Engineer incharge: Extruded section profile size 48mmx40mm
Providing and fixing door frame 24mm thick factory made PVC door shutters made of styles and rails of a PVC hollow section of size 59mmx24mm with a wall thickness 2mm±0.2mm. The styles and rails mitered cut and joined at corners by means of M.S. galvanized/plastic brackets of size 75mmx220mm having wall thickness 1.0mm/solid and fix with stainless steel screws. The styles of shutter reinforced by inserting galvanized M.S. tube of size 19mm x 19mm with a wall thickness 1mm±0.1mm. The lock rail made out of ‘H’ section, PVC hollow section of size 100mmx24mm with a wall thickness 2mm±0.2mm, fixed to shutter styles by means of plastic/galvanized M.S. ’U’ cleats. The shutter frame filled with a PVC multi- chambered panel of size 20mmx200mm with a wall thickness 1mm±0.1mm. The panels filled vertically and tie bar at two places by inserting horizontally 0.6mm galvanized M.S. rod and fastened with nuts and washers. All complete as per manufacturer’s specification and direction of Engineer-In-Charge. (For W.C. and bathroom door shutter)
Providing and fixing anodised aluminium work for doors, windows, ventilators and partitions with extruded built-up standard tubular and other sections of approved make conforming to IS:733 and IS:1285, anodised transparent or dyed to required shade according to IS:1868 (Minimum anodic coating of grade AC 15), fixed with rawl plugs and screws or with fixing clips, or with expansion hold fasteners including necessary filling up of gaps at junctions, at top, bottom and sides with required PVC/neoprene felt etc. Aluminium sections shall be smooth, rust free, straight, mitered and jointed mechanically wherever required including cleat angle. Aluminium snap beading for glazing/panelling, C.P. brass/stainless steel screws, all complete as per architectural drawings and directions of Engineer-in-charge. (Glazing & panelling to be paid for separately) : For fixed portion
Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with PVC/neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge. (Cost of aluminium snap beading shall be paid in basic item) : With float/frosted glass panes of 4mm thickness (weight not less than 10.0 kg/sqm)
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete : Fixed to steel windows by welding
Providing and fixing circular/hexagonal M.S. sheet ceiling fan box with clamps of internal dia 140mm, 73mm height, 3mm thick rim, top and bottom lid of 1.5mm M.S. sheet. Lids shall be screwed into M.S. box by means of 3mm round beaded screws, clamps shall be made of 12mm dia M.S. bar bent to shape as per standard drawing with over all length as 80cm. (it includes cost of clamps also)
Diluting and injecting chemical emulsion Chlorpyriphos/ Lindane E.C. 20% with 1% concentration for post constructional anti-termite treatment (Payment for chemical emulsion to be made separately)
Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres/sqm of the vertical surface of the substructure to a depth of 300mm including excavating channel along the wall and rodding etc. and making good the same
Kota stone slab flooring of size up to 30cmx30cm over 20mm (average) thick base of 1:4 cement mortar (1 cement : 4 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing, excluding cost of cement complete : 25mm thick
Providing and fixing ceramic tiles conforming to IS:15622 of manufacturers approved by railway in all colours, shades, design and abrasion resistance class as approved by the Engineer-in-Charge in floors and landings over 20mm thick bed of cement mortar 1:4 (1 cement : 4 coarse sand) including pointing in white cement mixed with pigment of matching shade complete : Of Group B-II Clause 5.1 (for abrasion resistance) of IS:15622 (Ceramic Floor Tiles) of size 300mmx300mm
Providing and fixing Ist quality ceramic tiles conforming to Group B-III (Ceramic Wall Tiles) of IS:15622 of manufacturers approved by railway in all colours, shades, and design as approved by the Engineer-in-Charge in skirting, risers of steps and dado over 12mm thick bed of cement mortar 1:3 (1 cemen : 3 coarse sand) including pointing in white cement mixed with pigment of matching shade complete : 200x300 mm
Providing and fixing 10mm thick heavy duty acid and/or alkali resistant factory made tiles conforming to Group V-RD series of approved make and colour using acid and/or alkali resisting mortar bedding and joints filled with acid and/or alkali resisting cement as per IS:4457 complete including cost of acid/alkali resistant cement
In flooring on a bed of 10mm thick mortar 1:4 (1 appropriate cement : 4 coarse sand)
In dado/skirting on 12mm thick mortar 1:4 (1 appropriate cement : 4 coarse sand)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete : 40mm thick with 20mm nominal size stone aggregate
Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 sand : 4 stone chips 12.5mm nominal size) excluding cost of cement
Providing and fixing white, vitreous china flat back half stall urinal of 580mmx380mmx350mm with white P.V.C. automatic flushing cistern, with fittings, standard size C.P. brass flush pipe, spreaders with unions and clamps (all in C.P. brass) with waste fitting as per IS:2556, C.I. trap with outlet grating and other coupling in C.P. brass including painting of fittings and cutting and making good the walls and floors, wherever required : Single half stall urinal with 5 litres P.V.C. automatic flushing cistern
Providing and fixing water closet squatting pan (Indian type W.C. pan) with 100mm sand cast iron 'P' or 'S' trap, 10 litres low level white P.V.C. flushing cistern with manually controlled device (handle lever) conforming to IS:7231, with all fittings and fixtures complete including cutting and making good the walls and floors wherever required : White Vitreous China Orissa pattern W.C. pan of size 580mmx440mm with integral type foot rests
Providing and fixing wash basin with C.I./M.S. brackets, 15mm C.P. brass pillar taps, 32mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls, wherever required : White, vitreous china wash basin size 630mmx 450mm with a pair of 15mm C.P. brass pillar taps
Providing and fixing 600mmx450mm bevelled edge mirror, 5.5mm thick of float glass (of approved quality) complete with 6mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete
Providing and fixing 600mmx120mmx5mm glass shelf with edges round or supported on anodised aluminium angle frame with C.P. brass brackets and guard rail complete fixed with 40mm long screws, rawl plugs etc. complete
Providing and fixing soil, waste and vent pipes : 100mm dia. sand cast iron S&S pipe as per IS:1729
Providing and filling the joints with spun yarn cement slurry and cement mortar 1:2 (1 cement : 2 fine sand) in S.C.I./C.I. pipes : 100mm dia. Pipe
Providing and fixing M.S. holder-bat clamps of approved design to sand cast iron/cast iron (spun) pipe embedded in and including cement concrete blocks 10cmx10cmx10cm of 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) including cost of cutting holes and making good the walls etc.: For 100mm dia. pipe
Providing and fixing bend of required degree with access door, insertion rubber washer 3mm thick, bolts and nuts complete : 100mm dia. sand cast iron S&S as per IS-1729
Providing and fixing Poly Tetra Methylene Terephthalate (PTMT) Waste Coupling for wash basin & sink of approved quality, colour & make : Waste coupling 31mm of 79mm length and 62mm breadth weighing not less than 45gm
Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with C.P. brass screws with concealed fitting arrangement of approved quality colour and make : 600mm long towel rail with total length of 645mm, width 78mm and effective height of 88mm, weighing not less than 190gm
Providing and fixing on wall face unplasticised - Rigid PVC single socketed rain water pipes conforming to IS:13592 Type-A including jointing with seal ring conforming to IS:5382 leaving 10mm gap for thermal expansion : 110mm dia.
Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised - Rigid PVC rain water pipes conforming to IS:13592 Type-A including jointing with seal ring conforming to IS:5382 leaving 10mm gap for thermal expansion :
Coupler, 110mm
110mm dia. Bend
Providing and fixing G.I. pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc. Internal work - Exposed on wall
15mm dia. nominal bore
20mm dia. nominal bore
Providing & fixing brass bib cock of approved quality : 15mm nominal bore
Providing & fixing brass stop cock of approved quality : 15mm nominal bore
Providing and fixing unplasticised PVC connection pipe with brass unions : 30cm length, 15mm nominal bore
Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (new work) : 20mm nominal bore
Providing and fixing PTMT pillar cock of approved quality and colour : 15mm nominal bore, 107mm long, weighing not less than 110 gm
Making soak pit 2.5m diameter, 3m deep with 45cmx45cm dry brick honey comb shaft with bricks of class designation 7.5 and S.W. drain pipes 100mm diameter, 1.8m long complete as per standard design, including excavation complete : With F.P.S. (non modular) bricks
Constructing brick masonry chamber for underground C.I. inspection chamber and bends with 7.5 class designation bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 455mmx610mm internal dimensions, total weight of cover with frame to be not less than 38kg (weight of cover 23kg and weight of frame 15kg) R.C.C. top slab with 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40mm nominal size), inside plastering 12mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished smooth with a floating coat of neat cement on walls and bed concrete etc. excluding cost of cement complete as per standard design
Inside dimensions 455mmx610mm and 45cm deep for single pipe line with F.P.S. bricks
Inside dimensions 600mmx850mm and 45cm deep for pipe line with three or more inlets with F.P.S. bricks
Providing and placing on terrace/staging (at all heights) polyethylene water storage tank ISI:12701 marked with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank
Providing and fixing G.I. pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc. Internal work – Exposed on wall, 40mm dia. nominal bore
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 40mm nominal bore
Providing and fixing gun metal non-return valve of 40mm nominal bore approved quality (screwed end) : Vertical
Supplying and fixing C.I. cover without frame for manholes : 500mm diameter C.I. cover (medium duty) the weight of cover to be not less than 58kg
Ordinary Portland Cement Grade-43 Grade
Skin Reinforcement(Fe-500 grade)
Providig Coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume)
Description of Item
Dismantling of existing BG track, turnouts, derailing switches, dead ends, sand humps, etc. of any rail section and any type of sleepers of any density and transporting all released material including sleepers, rails, switches, crossings and fittings & fastenings to the nearest station or manned level crossing or road loading point as directed by the Engineer.
Plain track including SEJ and Glued Joints and track at level crossing, bridge & bridge approaches and sharp curves with check rails
Dismantling of existing Structure like Washery and others
Misc work
Description of Item
Construction of service buildings at stations, in yards and in mid section as per layout drawing provided by the employer and detailed specifications provided in para 4.2 of section 5: works requirements of the bidding documents including preparation of architectural plan and structural design and drawings. Rate includes cost of cement steel and all other materials and labour. NOTE: (1) The rates under the item cover the cost of construction of superstructure only. Foundations of the building upto plinth shall be payable under the relevant items of BOQ (2) For construction of single storey building, foundation of the building is to be designed for double storey. (3) For building proposed to be built for more than four stories should be designed as framed structure only. (4) Additional 50% rates over and above the accepted rates shall be payable for construction of Isolated buildings outside ‘Station Section’ (‘Station Section’ for this purpose will mean the section between outermost facing points of a station) such as gate lodges, SP/SSP, Relay Hut, IBH building, gate lodge cum IPS building at interlocked gates. The additional rates shall be applicable on foundation as well as in superstructure items. (5) The rates do not cover General Electrification of buildings and the same shall be payable under standard BOQ Bill No. 33 : ELECTRICAL GENERAL SERVICES WORKS.
Ground floor and subsequent floors of Service building (floor height upto 3.35 m).
Extra for every additional storey over ground floor. Note: Payment will be made for the actual area constructed on the floor.
Extra for every 0.3m additional height above normal height of 3.35 m
Extra for resisting earth quake forces in Zone III, IV & V Note: No extra payment shall be made for resisting earth quake forces in Zone II and single storey building in Zone III & IV.
Extra payment for provision of internal sanitary and water supply installations. Note: Plinth area of only toilets/bath rooms/kitchen or pantry are to be considered for measurement and payment under the item.
Construction of residential buildings for staff accommodation near railway stations, level crossings or any other nominated location as per layout drawings and standard railway plans for each type of staff quarters, provided by the employer and detailed specifications provided in para 4.3 of section 5: works requirements of the bidding documents including structural design and preparation of detailed structural drawings. Rate includes cost of cement steel, internal water supply and sanitary installations and all other materials and labour. Note: (1) The rates under the item cover cost of construction of superstructure only. Foundations of the building upto plinth shall be payable under the relevant items of BOQ. (2) The rates do not cover General Electrification of buildings and the same shall be payable under standard BOQ Bill No. 33: ELECTRICAL GENERAL SERVICES WORKS. (3) Additional 50% rates over and above the accepted rates shall be payable for construction of Isolated residential buildings outside ‘Station Section’ (‘Station Section’ for this purpose will mean the section between outermost facing points of a station). Only upto two units being constructed at one location outside the ‘Station Section’ shall be treated as isolated residential buildings. The additional rates shall be applicable on foundation as well as in superstructure items.
Type II, III Ground floor and subsequent floors (floor height upto 2.9 m)
Type IV/Type V Ground floor and subsequent floors (floor height upto 2.9 m)
Extra for every additional storey over ground floor. Note: Payment will be made for the actual area constructed on the floor.
Extra for every 0.3m additional height above normal height of 2.9 m
Extra for resisting earth quake forces in Zone III, IV & V Note: No extra payment shall be made for resisting earth quake forces in Zone II and single storey building in Zone III & IV.
Construction of Water booths with granite cladding as per……….. [mention RVNL/Railway Drg no.]
Deleted
Providing precast RCC benches (chair type with back rest) as per ……….. [mention RVNL/Railway Drg no.] including fixing.
Construction of Gate Lodge/SP/SSP buildings with Pre-Cast RCC elements as per GAD No……….. from foundation to roof including casting, transportation, and erection of structures such as foundation Raft, columns, beams, side walls, roof slabs etc as directed by Engineer-in-charge. The rate includes teak wood doors, UPVC windows, UPVC ventilators, PVC Doors for bathrooms, interior, exterior painting with one coat of primer, two coat of putty with two coat of acrylic emulsion paint, flooring finished with vitrified tiles of approved quality, providing wall tiles in dado of toilet upto 1.2m from floor level, internal and external sanitary and water supply installations, WCs, leach pits 1.8m dia upto 2 m depth. Rates are also inclusive of all labour and materials such as cement and steel including tools and plants by contractor complete. Note: 1. Plinth area of building is………Sqm 2. Structural drawings (……Sheets) duly proof checked are enclosed
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BIDGiddi.pdf
Tender Documents • 5.27 MB
BOQ.xls
Other Document • 0.36 MB
BOQ.pdf
Other Document • 6.12 MB
VClinkPreBid.pdf
PDF • 0.99 MB
Download all tender documents and submit your bid