Loading…
Loading…
41 results • Latest
Preparation of Feasibility Study Report Detailed Project Report and Detailed Engineering for providing Rail Connectivity for the proposed VOC Port Outer Harbour Project at Tuticorin
Operation and Maintenance of Onshore Facilities for Recreational Boat Tourism at Sonia Vihar DelhI
Construction of IWAI Office Building G plus 8 plus 1no Service Floor total 10 floors at Fancy Bazar Guwahati Assam in EPC Mode
Engagement of Operational Staff for annual operation of S and T Assets of Kusmunda Silo Siding East and West Cabin of Kusmunda Area of SECL for a period of One Year
Annual Maintenance of S and T Assets of Baroud Silo Siding of SECL Raigarh Area for a period of One Year
Preparation of Detailed Project Report for the work of Supply Installation Testing and Commissioning of In Pit Conveyor System at Rampur Batura OCP 4 MTY Sohagpur Area SECL
Supplying Transporting and stacking of various PSC sleepers in connection with Govinda Siding of Jamuna and Kotma Area Nowrozabad siding and Surakachhar Siding of SECL
Execution of Earthwork Minor Bridge Supply of Point and Xing P Way Fittings Supply and Spreading of track ballast execution of P Way works and other allied works in connection with Renovation of track and OHE at Govinda Siding of Jamuna Kotma Area
Annual maintenance of Rail track of Sardega RLS rail connectivity Phase_I at Mahalaxmi Area as per norms of Indian Railways for a period of 02 years
Construction of one loading platform at Surakachhar siding on the opposite side of the existing platform with minor modification of track for facilitating loading of opencast mines of Korba Area
Renovation and Modernization of (A) Seafarers Welfare Fund Society SWFS Office at Nirman Bhavan MbPA building Mumbai and (B) Seafarers Club Rajaji Road Fort St George Chennai
Railway Track Maintenance of Chhal Silo Siding of SECL Raigarh Area for a period of three years
Railway Track Maintenance of Manikpur Silo Siding of SECL Korba Area for a period of three years
Maintenance of Railway Track in the Marshalling Yard and Wharf Area 8 dot 10 Km of NMPA for a period of three years 2026 to 2029 at NMPA Mangalore
Design Supply Erection Testing and Commissioning 25 kV 50 Hz Single Phase Conventional type Overhead equipment and Associated modifications at GM Yard and BH Yard of HDC Railway Network under Haldia Dock Complex SMPK on Kharagpur Division
Construction of Three Terminal Building at Location Near Sangam Bridge Sumbul and Gund Prang in Srinagar JandK
Design supply erection testing and commissioning of 25 kV 50 Hz Single Phase Conventional type Overhead Equipment and associated modifications at Line No. 2 and 3 of MV Siding for Augmentation of Despatches from Kirandul Complex NMDC Limited
construction of loading unloading platform
Maintenance work of East Rail Corridor in Kharsia to Korichhapar Up and DOWN Line Korichhapar to Dharamjaygarh Single Line, Gharghoda_Bhalumunda Single Line Chhal and Baroud Feeder Single Line section of CERL in SECR with other allied works
Repairing of line no_5 and loop no_2 of LPDC siding of Dankuni Coal Complex DCC Dankuni West Bengal
Supplying Transporting and stacking of various PSC sleepers in connection with Construction of Railway Siding for platform loading siding at Durgapur Project 6 MTY Raigarh Area of SECL
Execution of Earthwork in approaches RE Wall Pile Foundation RCC BOX bridges with Pile or open foundation ground improvement Road work Drain Road Lighting and other allied work
CONSTRUCTION OF NEW LINE/MODIFICATION BY COMPLETE TRACK RENEWAL OF EXISTING RAIL LINES OF WHARF WALL LOADING PLATFORM OF GIDDI-A RAILWAY SIDING UNDER ARGADA AREA OF CCL IN THE STATE OF JHARKHAND, INDIA.
Extension of 02 Nos Sick Line near Eastern Gate of NTPC Barh
Engagement of Operational Staff for operation of SnT Assets of Manikpur Silo Siding block Cabin of Korba Area of SECL for a period of One year
Extension of 02 Nos Sick Line near Eastern Gate of NTPC Barh
Execution of Pile Foundation Sub_structure and Superstructure of 4 Lane ROB with 1 48.0 M Camel Back Girder in connection with Construction of New 4 lane ROB at Gate No_3 of Paradip Port Authority
Execution of MINOR BRIDGE Catch water Drain Mexican Turfing and Earthwork in Ramp in and Exit approach and Stacking Platform etc in connection with Conversion of Manikpur CHP Siding into SILO Loading Siding
Execution of Earthwork in Stacking Ground Associated Drain work and Toe Wall work Station Building Road and Other Anciliary Work
Execution of Earthwork in Diverted Coal handling Road Construction of Road under Bridge RUB No 2 Earthwork in formation Stacking Ground Associated Drainage work and Toe Wall work and Other Ancillary Work
Construction of ROB, its approaches and service roads
Engagement of operational staff for operation of SnT Assets of block cabin of Chhal silo siding of Raigarh Area of SECL for a period of one year
Formation and Railway track execution
Provision of Electronic Interlocking along with Colour Light Signaling and Motor operated Points at Sasti siding of WCL
Comprehensive Annual Maintenance for Indoor and Outdoor S and T Gears and associated equipment installed at Common Rail Yard of JNPA for a period of Two Years
SHIFTING WORK OF S and T FOR CONSTRUCTION OF ITAPARA RAILWAY SIDING UNDER SALANPUR AREA ECL
Operation and Maintenance OnM of National Maritime Heritage Complex Lothal Phase 1A
Comprehensive Annual Maintenance Contract CAMC of Outdoor Signalling and Telecom SandT Equipments at JVRB Private Siding at Sathupally SCCL for a Period of Twenty Four 24 Months
Provision of Signaling and Telecom System along with Interlocking of 05 nos. of LC gates with Electronic Interlocking at VoCPA of Marshalling Yard and Hare Island
Development of Rail connectivity to IWT terminals
CONSTRUCTIONOFPERMANENTTOURIST CRUISE and CARGO TERMINAL AT NEAMATI ASSAM