2 Mar 2026, 3:00 pmClosed
Construction of ROB with (1x42 mtr Composite Girder + 2x18 mtr Composite Girder + 7x24.0 mtr RCC T- Beam Girder, including bridge approaches with RE walls in lieu of existing manned LC- 446 at Km: 784/25-27 between Sigadam - Chipurupilli stations of Waltair Division in East Coast Railway.
DYCEGSUWATENGG2026005~ECOR
DYCEGSUWATENGG2026005
Open
Works - General
24 Months
Srikakulam, Andhra Pradesh
₹0
₹23.8 L
28 Jan 2026
28 Jan 2026
16 Feb 2026
A-Execution of Concrete works and its connected works for the ROB Above/
B-Execution of RCC Pile work , MS liner, Pile Load test etc. items
C-Execution of Structural Steel works and its connected works etc works
D-Supply, including straightening, cutting, bending, placing in position
E-Supply and using of Cement etc Items covered under ECoR USSOR -
F-Execution of ROB approach works and its connected works etc, items
G-Execution of Non Schedule items (Non USSOR-2021 & CPWD-DSR-
superstructure, Service/Diversion Roads etc ( Items Covered under USSOR-2021).
Item- 1 Execution of all items under Schedule-A.
S No. Item No Description of Item Unit Qty Rate Amount
Earthwork in filling in embankment,
guide bunds, around buried type
abutments, bridge gaps, trolley
refuges, platforms etc. with
contractor's own earth conforming to
Soil Quality Class SQ1/SQ2/SQ3, after
preparation of foundations as
applicable, benching in existing banks
wherever required, spreading in
layers with motor grader, bringing the
moisture content to OMC, mechanical
compaction to specified density and
dressing of bank to final profile as per
RDSO Specifications: RDSO/2020/GE:
IRS-0004 with latest correction slips.
Note: 1) Foundation preparation,
Benching including additional
earthwork on account of this,
wherever required, shall be paid
extra under relevant schedule item
for benching. 2) Payment for
Earthwork under this item shall be
made based on the cross section
measurements calculated (i) with
original ground profile of existing
bank based on initial ground levels
before doing benching and (ii) final
profile of the bank worked out with
final levels as per prevailing
ECOR-CONST-HQ-ENGG/ECOR
2 012040 Manufacturing of blanketing material cum 3000.00 915.96 2747880.00
by wet mixing of naturally available
suitable soil including additional
blending with naturally available or
manufactured material as required to
achieve specified gradation, in
designed proportion in Pug mill or
wet mix plant to have uniform
gradation including all incidental
transportation, laying over finished
formation in uniform layer(s) with
motor grader, compaction with
suitable vibratory roller to specified
density and finishing to correct
profile, complete as per RDSO
Specification No. RDSO/2020/GE: IRS-
0004 with latest correction slips.
P r o v i d i n g portable fencing along
running track where work is to be
done in close vicinity of track,
maintaining during execution of work
and removing after completion of the
work as per direction of the Engineer.
Fencing shall consist of self
supporting steel angles of size 50mm
x 50mm x 6mm, 1.5m long provided
with hooks etc. and embedded in CC
1:2:4 block of size 0.23m x 0.23m x
0.23m placed at c/c distance of 2m
along track. 12mm dia rods in three
horizontal layers shall be tack welded
with angle posts. Note : Released
material will be property of the
contractor after completion of work.
Cost of cement required for CC blocks
shall be paid separately.
retro-reflective tape in horizontal
direction, duly secured/tight with
vertical posts.
Earthwork in excavation by
mechanical means (Hydraulic
Excavator)/Manual Means for
foundations and floors of the bridges,
retaining walls etc. including setting
out, dressing of sides, ramming of
bottom, getting out the excavated
material, back filling in layers with
approved material and consolidation
of the layers by ramming and
watering etc. including all lift,
disposal of surplus soil up to a lead of
300m, all types of shoring and
strutting with all labour and material
complete as per drawing and
technical specification as directed by
Engineer in charge. Note: This item
will be used for excavation work in
connection with other miscellaneous
works also like side drains, foundation
for OHE masts and other
miscellaneous structures in
connection with Gauge Conversion,
Doubling, New lines.
ECOR-CONST-HQ-ENGG/ECOR
Providing and laying in position Plain
cement concrete of specified Nominal
Mix for miscellaneous works like side
drains, foundation for OHE masts and
other miscellaneous structures
excluding the cost of Cement,
centering and shuttering - All work up
to plinth level :
(zone-III) : 3 graded stone aggregate
20 mm nominal size)
7 022040 P r o v i d i n g and laying in position cum 3524.85 3777.08 13313640.44
machine batched, machine mixed
and machine vibrated Cement
Concrete of specified grade as per
approved Design Mix (mixed in Mobile
Concrete Batching/Mixing Plant at
site or RMC from approved plants)
using 20mm graded crushed stone
aggregate and coarse sand of
approved quality in RCC raft
foundation & Pile cap including
finishing, using Plasticiser in
approved proportions (as per
IS:9103), to modify workability
without impairing strength and
durability complete as per
specifications and direction of the
Engineer in charge. Note: 1. Payment
for cement, reinforcement and
shuttering shall be made extra under
relevant item. 2. Plasticiser shall
invariably be used in approved
proportion to increase workability
with minimum possible quantity of
cement for all grade of Design Mix
Concrete unless it is specifically
approved citing reasons for not using
plasticiser at the stage of Mix Design
a n d in that case deduction shall be
made as per relevant item.
ECOR-CONST-HQ-ENGG/ECOR
P r o v i d i n g and laying in position
machine batched, machine mixed
and machine vibrated Cement
Concrete of specified grade as per
approved Design Mix (mixed in Mobile
Concrete Batching/Mixing Plant at
site or RMC from approved plants)
using 20mm graded crushed stone
aggregate and coarse sand of
approved quality for the following
Reinforced cement concrete
structural elements up to height of
9.0 m from foundation top level,
including finishing, using Plasticiser in
approved proportions (as per
IS:9103), to modify workability
without impairing strength and
durability complete as per
specifications and direction of the
Engineer in charge. Note: 1. Payment
for cement, reinforcement and
shuttering shall be made extra under
relevant item. 2. Plasticiser shall
invariably be used in approved
proportion to increase workability
with minimum possible quantity of
cement for all grade of Design Mix
Concrete unless it is specifically
approved citing reasons for not using
plasticiser at the stage of Mix Design
a n d in that case deduction shall be
made as per relevant item.
Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc.
11 022054 Approach slab at formation level, Dirt cum 1950.14 3809.70 7429448.36
wall/ ballast wall at formation level
12 022055 Extra for every increase of 1m or part cum 3961.87 65.23 258432.78
thereof in the height above 9.0 m
13 022060 Providing and laying Plain Cement cum 543.38 3513.33 1909073.26
Concrete 1:3:6 with graded stone
aggregate of 40mm nominal size, in
foundation and floors, retaining walls
of bridges including mechanical
mixing, vibrating, pumping and
bailing out water where ever required
with all materials and labour
complete but excluding the cost of
cement and shuttering as per
drawings and technical specifications
as directed by Engineer.
14 022070 Providing and fixing Weep Holes in Metre 1241.00 276.80 343508.80
Abutments, Wing walls and Return
walls etc., of new bridges with
110mm dia UPVC pipe Type A ISI
marked with all contractor's men,
material, transportation, all taxes as
per specifications and as directed by
Engineer-in-Charge.
ECOR-CONST-HQ-ENGG/ECOR
15 022140 Pulse Echo Test (PET) for integrity Each 36.00 3186.07 114698.52
testing of piles with contractor's men,
materials and machines. The rate
includes cost of Inspection of site,
preparation of pile head and any
other unforeseen cost required for the
test, submission of reports in
triplicate as per satisfaction of the
Engineer in Charge.
Centering and shuttering including
strutting, propping etc. and removal
16 025031 All types of bridge sub-structures, e.g. Sqm 11339.98 665.63 7548230.89
pier, abutment, wing wall, retaining
wall, RCC box type foundations,
Abutment cap, Pier Cap, Inspection
Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc. up
to 5m above ground level
17 025032 All types of bridge super-structures, Sqm 3985.04 868.54 3461166.64
e.g. slabs, I-girders, T-girders, Box
girders etc. up to 5m above ground
18 025033 Extra for additional height over item Sqm 5324.23 107.45 572088.51
no. 025031 & 025032 wherever
required with adequate bracing,
propping etc. over initial height of 5
metres for every additional height of
1 metre or part thereof.
19 031210 Supplying and laying 160mm dia. PVC Metre 688.80 395.89 272689.03
Pipes Class-I, capable for a pressure
of 2.5 kg/sqm in footpath of ROB for
laying cable with all contractor's
materials labour, tools, plant,
machinery, vehicles, consumables,
lead, lift etc. complete as per
specifications and as directed by
Engineer in-charge.
20 041050 Providing and fixing railing used in Kg 1000.00 104.58 104580.00
rows for footpath or anti-crash barrier
railing with B class G.I. pipe 65/50
mm nominal dia including cost of M.S.
angle and channels in vertical posts,
welding / bolting, priming painting
with one coat ready mix Zinc
Chromate conforming to IS:104 with
DFT of 25-30Microns, followed by one
coat of Zinc Chrome red oxide
conforming to IS:2074 with DFT of 25
Microns with all material, labour, T&P
as a complete job. Note: Cost of
painting shall be paid extra under
21 051030 Supplying of stone boulders weighing cum 300.00 1347.74 404322.00
not less than 35 kg each at specified
bridge locations.
22 052030 Supply and laying of quarry dust cum 39.00 775.77 30255.03
including consolidation, supply of all
materials, labour, lead, lift, tools,
plants, crossing of tracks as per
drawing and technical specification as
directed by the Engineer in charge in
case loose slush is encountered at
site of foundation before casting the
foundation or laying the filtering
ECOR-CONST-HQ-ENGG/ECOR
including consolidation with all
labour, lead, lift, tools, plants,
crossing of tracks as per drawing and
technical specification as directed by
the Engineer in charge in case loose
slush is encountered at site of
foundation before casting the
foundation or laying the filtering
24 052150 Providing and laying of filter media cum 225.00 2662.74 599116.50
consisting of granular materials of
GW, GP, SW groups as per IS:1498
(latest) in required profile behind
boulder filling of abutments, wing
walls / return walls etc. above bed
level with all labour and material
complete job as per drawing and
technical specification of RDSO
25 052250 Providing Boulder Backing behind cum 300.00 359.00 107700.00
wing wall, return wall, retaining wall
with hand packed boulders & cobbles
with smaller size boulders toward the
back including all lead, lift, labour &
other incidental charges as complete
work in all respect. Payment for
boulder/cobbles will be done extra.
26 052260 Dewatering of natural or accumulated HP Hour 5000.00 45.56 227800.00
water from any location. Payment to
be done for Horse power of pump
multiplied by pumping hours.
Designing and developing Detailed
structural and working Drawings for
following items for ROB/RUB/Bridge
based on Railway's approved GADs,
duly collecting necessary data from
Railways and R&B authorities, duly
designing members and submission
of check plot duly getting proof-
checked by Railway approved
institutes, submitting for Railway's
verification and approval, making
corrections duly incorporating
suggestions in drawings/designs,
further submission of original in
transparent film paper and soft copy
(CD) for Railways approval etc. with
contractor's technical expertise and
instruments, labour, consumables,
repeatedly attending till final
approval etc., complete as directed
by Engineer in-charge.
piers/abutments
29 053013 Foundation and sub-structure for RCC Set 11.00 25347.23 278819.53
retaining wall, abutment and
ECOR-CONST-HQ-ENGG/ECOR
required width from centre line of
track for replacement of sleepers by
digging of pucca road surface up to
bottom of sleeper, removing of
ballast, muck etc., screening of
ballast & stacking the same near
level crossing and disposing of all
debris, replacing the required sleeper
duly packing the sleeper to make fit
for normal traffic and closing of LC
surface with screened ballast to
original level by proper ramming and
consolidation to smooth motarable
surface as directed by engineer in-
31 181020 Dismantling existing check rail of RM 52.00 168.79 8777.08
Level Crossing, blocks, bolts & nuts
and stacking these in a countable
manner near LC, free from any
infringements as directed by Engineer
32 183010 Drilling of parabolic shaped holes to Each 200.00 140.01 28002.00
the web of check rail as per drawings
& specifications and as directed by
engineer in- charge.
bending/machining and fixing of
check rails of all rail sections over
PSC Sleepers as per Railway's
approved drawings & specifications
for level crossings / trolley
paths/inspection lines in yards duly
cutting rail flanges, wherever
required to correct alignment and
level, drilling of holes with machine in
check rails and fixing to Running rail
and sleepers with all Railway's
fittings, e.g. rail screws / grip
expansion bolts, brackets, packing
pieces, bolts, washers etc including
grinding of brackets if required, fixing
of Railway's wooden blocks at flare
ends duly cutting and plaining,
crossing of tracks and as directed by
the engineer in-charge Note: 1.
Drilling of holes in PSC Sleeper and
fixing of dowels shall be paid under
relevant item. 2. Required P.Way
materials will be supplied at
SSE/P.Way stores.
other approved method for check
rails and grinding sharp edges into
smooth profile. Payment shall be
made for length of cutting of foot.
35 183040 Fixing check rails to running rails on Set 26.00 4670.74 121439.24
level crossings with MS brackets, MS
packing plates, bolts & nuts, spring
washers etc. including lubrication as
per approved drawing &
specifications, as directed. Rails, MS
brackets, packing plates, bolts &
nuts, spring washers will be supplied
by Railways. Note: One set consists
two check Rails.
ECOR-CONST-HQ-ENGG/ECOR
36 184010 Painting of running rails and check RM 100.00 51.68 5168.00
rails of any rail section of level
crossing with anti-corrosive paint on
both sides of web, foot etc. including
liner contact area (excluding bottom
of foot) and fishing plane with two
coats of thickness of 100 microns
each by bituminous black paint
confirms to IS-9862 of reputed make
including painting of liners, ERC
surface preparation, i.e. cleaning with
wire brush / sand paper as a
complete job as per Para No 613 (2)
(b)(iii) of Indian Railways Permanent
Way Manual, as directed by Engineer
Providing Rail Height Gauge at
approaches of level crossings as per
approved drawings in cement
concrete foundation using Railway's
rails of all sections including cutting,
bending, drilling holes, erecting in
position with clamps, bolts & nuts
including painting with one coat of
enamel paint of specified colour over
one coat of primer. Note: excavation
and concrete work will be paid
37 185032 Above 5 metre width of level crossing Each 2.00 15201.57 30403.14
Manufacture, supply, assembly,
erection, commissioning and testing
of Lifting Barrier assembly, having
fragmented boom, boom light boxes
with suitable gate lamps, bell, boom
supports (stay wires) with adjusters,
counter weight, pedestal and lock
posts with foundation of 'A' type as
required, turn-union wheel with
brackets, balance and auxiliary
weights clamps etc. to approved
standard drawing with all fittings and
fastenings excluding fringes,
complete with contractor's men,
equipments and materials, as per
specifications and as directed.
erection, commissioning and testing
of Winch Arrangement for operation
of level crossing lifting barriers, as
per RDSO's approved layout, having
standard covering arrangement,
foundation of 'A' type as required and
pulleys, pulley guides & stakes,
horizontal rope wheel, vertical rope
wheel, wire adjusting screws, wire
ropes 6 x 6 x 19 with all fittings,
fixtures & accessories to RDSO's
approved drawings with all parts
including painting of steel work as per
specification, as directed with cement
concreting complete. Note:
Excavation and concrete work will be
paid separately.
ECOR-CONST-HQ-ENGG/ECOR
Manufacturing, supplying and laying
factory made CC block pavers for
road surface of level crossings to
manufactured using 20mm size
graded hard stone aggregates of
approved quality over a well
compacted sand bedding 50 thick
with all contractor's cement, labour,
tools/plant and curing with all lead &
lift as per specifications and as
directed by Engineer in-charge.
41 186020 Fixing of Railway's existing precast Sqm 120.00 78.99 9478.80
concrete slabs of different sizes in
position for level crossings / trolley
path and filling gap between check
rail / running rail, slabs, approaches
etc. with asphalt complete and as
42 186150 Fabrication, supplying and fixing Stop Each 4.00 2780.77 11123.08
Boards of 600mm dia. to lifting
barriers as per approved drawing,
made of 3mm thick plate, using MS
clamps, providing 6 nos. of 50mm
dia. red retro-reflector on stop board,
painting iron works with two coats of
synthetic enamel paint over one coat
of primer of approved quality & colour
and writing STOP mark over the
Fixing of wooden blocks of
approximate size of 150mm x 300mm
x 1200mm on end of check rails
including sizing at level crossings
with contractor's labour, tools &
plants and as directed.
43 186172 With Contractor's hard wood block Each 4.00 3507.60 14030.40
44 186180 Fixing of grip expansion bolts of Each 200.00 124.39 24878.00
18mm / 22mm dia. with nuts and MS
clips / washers on PSC sleepers as per
specifications for fixing guard rails /
check rails / trolley path including
drilling of required holes in sleepers
with all fittings with contractor's tools
& plants, equipment, consumables
with all lead, lifts etc. complete, as
directed by Engineer in-charge,
excluding cost of bolts, nuts, washers,
ECOR-CONST-HQ-ENGG/ECOR
45 186200 Erecting Emergency Chain Posts for Each 4.00 604.09 2416.36
level crossings , including cutting rail
to required length varying from
1.00M to 1.50M , drilling holes,
providing hooks & links / rings with
necessary locking arrangements to fix
emergency chain, leading the rail
pieces from nominated station / mid
section from nearest depot to site of
work, erecting the rail post by making
the pit of size as required and filling
with CC 1:3:6 mix with 40mm
aggregates and painting the rail post
with two coats of synthetic enamel
paint of approved colour and make,
with contractor's materials, labour,
paint, all lead and lifts, etc., complete
as per specifications and as directed
by the Engineer-in-charge. Note: (1)
Rails & chain will be supplied by
Railways. (2) Excavation and concrete
work for foundation will be paid under
Hiring of machinery for minor
miscellaneous works for short
duration including operator/driver,
fuel, lubricants and consumable. The
contractor shall arrange all statutory
permits as required by rules and
regulations prevailing in the area of
work. Payment shall be made for
actual working hours at site.
similar with minimum 1.10 cum
bucket capacity
Schedule B-Execution of RCC Pile work , MS liner, Pile Load test etc. items Covered under USSOR-
Item- 2 Execution of all items under Schedule-B.
S No. Item No Description of Item Unit Qty Rate Amount
ECOR-CONST-HQ-ENGG/ECOR
Boring, providing and installation of
bored cast in-situ Reinforced Cement
Concrete piles of specified diameter
and length below pile cap of specified
grade with Design Mix Cement
Concrete, using 20mm graded
crushed stone aggregate and coarse
sand of approved quality, to carry a
safe working load not less than
specified, concreting by machine
batching, machine mixing,
scaffolding, using Admixture in
approved proportion (as per IS:9103),
placing with tremie pipe, chipping off
of pile top to remove laitance
concrete above cut off level etc.,
pumping and bailing out water, by
percussion drilling using Direct Mud
Circulation (DMC) or Bailor and Chisel
technique by tripod and mechanical
Winch machine, complete in all
respect as per approved drawing,
specification and direction of the
Engineer in charge. Note: 1. Payment
for only cement, reinforcement and
permanent casing pipe (if any ) shall
be made extra. 2. Length of the pile
for payment shall be measured up to
the bottom of RCC pile cap. 3.
Plasticiser shall invariably be used in
approved proportion to increase
workability with minimum possible
quantity of cement for all grade of
Design Mix Concrete unless it is
specifically approved citing reasons
for not using plasticiser at the stage
of Mix Design and in that case
deduction shall be made as per
ECOR-CONST-HQ-ENGG/ECOR
Boring, providing and installation of
bored cast in-situ Reinforced Cement
Concrete piles using Hydraulic piling
Rig of specified diameter and length
below pile cap of specified grade with
Design Mix Cement Concrete, using
20mm graded crushed stone
aggregate and coarse sand of
approved quality, to carry a safe
working load not less than specified,
concreting by machine batching,
machine mixing, scaffolding, using
Admixture in approved proportion (as
per IS:9103), placing with tremie
pipe, chipping off of pile top to
remove laitance concrete above cut
off level etc., pumping and bailing out
water complete in all respect as per
approved drawing, specification and
direction of the Engineer in charge.
Note: 1. Payment for only cement,
reinforcement shall be made extra. 2.
Length of the pile for payment shall
be measured up to the bottom of RCC
pile Cap. 3. Plasticiser shall invariably
be used in approved proportion to
increase workability with minimum
possible quantity of cement for all
grade of Design Mix Concrete unless
it is specifically approved citing
reasons for not using plasticiser at
the stage of Mix Design and in that
case deduction shall be made as per
3 022100 Providing, fabricating and installing MT 455.04 108148.95 49212098.21
permanent casing pipe for bored piles
for all diameters with specified
thickness of steel plate including all
labour, materials, tools & complete as
per approved drawing &
specifications complete in all respect
as per the direction of Engineer in
charge. Note: Payment shall be made
as per the weight of circular plate of
casing pipe only.
E x t r a for chiselling in addition to
boring of piles, if chiselling is required
to be resorted to in hard rock or big
stone boulders larger than 30cm,
manually or by any other means.
Conducting load test of a single pile
up to specified capacity in accordance
with IS:2911 (Part-IV) including
installation of loading platform and
preparation of pile head or
construction of test cap and
dismantling of test cap after test etc.
with all labour, material, tool &
plants, equipment, machinery, etc.
complete as per drawing and
specification, as directed by the
5 022122 Initial load test above 50 ton and up Each 36.00 66928.79 2409436.44
to 100 T capacity pile
6 022123 Initial load test above 100 ton and up Each 20.00 89785.37 1795707.40
to 250 T capacity pile
ECOR-CONST-HQ-ENGG/ECOR
coal tar or bitumen confirming to
IS:3117- latest version on the top and
sides of RCC box/slabs @ 1.70
kg/sqm after cleaning the surface
with all labour and materials
complete job as directed by the
Schedule C-Execution of Structural Steel works and its connected works etc works Covered under
Item- 3 Execution of all items under Schedule-C.
S No. Item No Description of Item Unit Qty Rate Amount
1 031090 Design, manufacturing, supplying and Cubic 1463232.00 1.52 2224112.64
fixing in position elastomeric bearing Centimetre
true to line and level conforming to
IS:3400, IS:226, BS-5400 under
prestressed concrete girders/ Steel
Girders, for Pre-cast as well as cast-
in-situ girders as per approved
drawing. The rate shall include cost of
load test of one no. bearing from
Railway approved firms and all fixing
materials, equipments, machineries,
labour, taxes, loading, unloading,
leading, lifting etc. complete. Rates
include getting the drawing approved
from Railway and cost of inspection
during manufacturing from railway
approved organization.Note : 1. The
rate is for finished item complete and
paid only after fixing in position below
the girder. 2. The volume shall be as
given in the drawing and no
deduction shall be made for inserted
steel plates etc.
Providing and fixing in position of
standard preformed sealed and slab
type or strip seal elastomeric type
expansion joints for Railway bridge or
Road Over Bridges as per approved
drawings and latest MORTH/IRC
specifications complete in all respect
as directed by Engineer in-charge.
Load testing of one or more spans of
bridge as selected by the Engineer as
per approved load test procedure
following relevant IS/IRC/Railway
codes with contractor's labour,
deflection measuring instruments,
loading materials, recording and
analyzing the load testing results
including all lead & lift, etc. complete
as required. The rates are all inclusive
and will be paid after load test is
finished and girder is cleared of the
kentledges/loading material etc. The
load shall be 1.25 times the
stipulated design load.
part thereof over 100 MT in the span
design load capacity up to 800 MT
ECOR-CONST-HQ-ENGG/ECOR
Providing and fixing in position GI
Drainage Spouts of required length
with Grating in RCC slab and filling
bitumen along kerb as shown in
drawing with contractor's pipes,
bitumen, tools, equipment, lead, lifts
etc. complete as per specifications
and as directed by Engineer in-
Supplying, fabrication, assembling of
all types of steel girders of specified
spans with structural steel
conforming to Quality "B0" Grade
Designation E250 conforming to
IS:2062, erection / slewing / end
launching of steel girders with cranes
or any other approved launching
methods as per site conditions (not
requiring traffic block) on sub-
structure including provision of trolley
r e f u g e s etc., complete as per
a p p r o v e d Q A P and drawings
conforming to IRS-B1-2001 and other
relevant codes and specifications.
Note: 1. Detailed fabrication and
erection drawings & launching
methodology will be prepared by the
contractor and got approved from
Railway. 2. The rate is all inclusive
including launching in position,
complete in all respect except cost of
(i) Painting / Metalising; (ii) Bearings
& (iii) HSFG bolts which shall be paid
extra under relevant item. 3. The
payment shall be made on the
theoretical weight of main
components and gusset plates only.
4. Payment Schedule: (i) Receipt of
material at site: 40% (ii) Fabrication
Erection/Launching: 20% (iv)
Completion in all respects: 20%
Girder/Composite Girder (Steel Work)
Grade Designation E350 instead of
Grade Designation E250 of Quality
"B0" as per IS: 2062
any dia and any length with suitable
n u t s including DTI washers
conforming to IRS-B1-2001 for
bridges and s t e e l structures with
contractors labour, tools and plants
and lead and lift etc., complete.
ECOR-CONST-HQ-ENGG/ECOR
Metallizing of steel work of girders
with sprayed aluminium after surface
preparation by Sand/grit blasting,
followed by one coat of etch primer
(IS:5666) & one coat of Zinc Chrome
primer (IS:104) and two coats of
aluminium paint (IS:2339) with all
labour, T&P and material as a
complete job duly conforming to all
relevant specifications and process
given under Clause 39 of IRS-B1-
2001. Note: Nominal Thickness of
sprayed Aluminium coating shall be
150 microns. DFT of Zinc chrome
primer shall be 25-30 microns and
DFT of each coat of Aluminium paint
shall be 12-14 microns.
access ladders, inspection platforms,
Trolley refuges etc., on bridges with
structural steel conforming to IS:2062
including welding / bolting, priming
painting with one coat of ready mixed
paint of Zinc Chromate (IS:104) with
DFT of 25-30 microns followed by one
coat of Zinc Chrome Red Oxide
(IS:2074) with DFT of 25 microns with
all material, labour, T&P as a
complete job. Note: Painting shall be
paid separately under relevant item.
Design, supply, fitting and fixing in
position true to line and level POT-
PTFE bearing of 300MT Capacity,
consisting of a metal piston
supported by a disc or un reinforced
elastomer confined within a metal
cylinder, sealing rings, dust seals,
PTFE surface sliding against stainless
steel mating surface, complete
assembly to be of cast steel /
fabricated structural steel, metal and
elastomer elements complete as per
IS:2062, IS:1030, AISI:304, AISI:316,
BS-5400, Bridge Code and as per
approved drawing and Technical
Specifications. The design of the
bearings shall be submitted by the
manufacturers / contractor and got
approved from Railway before fixing.
Test report after inspection of the
bearings shall be submitted and got
approved before the materials are
lifted from the manufacturer
Schedule D-Supply, including straightening, cutting, bending, placing in position of Reinforcement
steel Items etc., covered under ECoR USSOR -2021.
Item- 4 Execution of all items under Schedule-D.
S No. Item No Description of Item Unit Qty Rate Amount
ECOR-CONST-HQ-ENGG/ECOR
Supply of steel reinforcement of
approved brands/makes for R.C.C.
work including straightening, cutting,
bending, placing in position and
binding all complete.
grade Fe-500D or more of approved
Schedule Schedule E-Supply and using of Cement etc Items covered under ECoR USSOR -2021.
Item- 5 Execution of all items under Schedule-E.
S No. Item No Description of Item Unit Qty Rate Amount
Supply and using Cement at Worksite
approved brands/makes
Schedule F-Execution of ROB approach works and its connected works etc, items covered under
Item- 6 Execution of all items under Schedule-F.
S No. Item No Description of Item Unit Qty Rate Amount
13.0 FINISHING
Applying one coat of water thinnable
13.43 cement primer of approved brand
and manufacture on wall surface :
13.44S EXTERIOR FINISHING
Finishing walls with Acrylic Smooth
exterior paint of required shade :
13.46.1 New work (Two or more coat applied Sqm 6024.04 166.85 1005111.07
@ 1.67 ltr/10 sqm over and including
priming coat of exterior primer
applied @ 2.20 kg/10 sqm)
16.0 ROAD WORK
16.1S ROADS
16.1 Preparation and consolidation of sub Sqm 6000 180.5 1083000
grade with power road roller of 8 to
12 tonne capacity after excavating
earth to an average of 22.5 cm
depth, dressing to camber and
consolidating with road roller
including making good the
undulations etc. and re-rolling the sub
grade and disposal of surplus
earthwith lead upto 50 metres.
16.9 Scarifying metalled (water-bound) Sqm 7425 27.55 204558.75
road surface including disposal of
rubbish, lead upto 50 m and
consolidation of the aggregate
received from scarifying with power
road roller of 8 to 10 tonne capacity.
16.30S PREMIX CARPET
Providing and applying tack coat
using hot straight run bitumen of
grade VG - 10, including heating the
bitumen, spraying the bitumen with
mechanically operated spray unit
fitted on bitumen boiler, cleaning and
preparing the existing road surface as
per specifications :
ECOR-CONST-HQ-ENGG/ECOR
Providing and applying tack coat
using bitumen emulsion conforming
to IS:8887, using emulsion pressure
distributer including preparing the
surface & cleaning with mechanical
With medium setting bitumen
16.49S MISCELLANEOUS
16.50 Providing and fixing Glow studs of Each 1000 175.5 175500
size 100x20 mm made of heavy duty
body shall be moulded ASA (Acrylic
styrene Acryloretrite ) or HIP (High
impact polystyrene) or ABS having
electronically welded micro- prismatic
lens with abrasion resistant coating
as approved by Engineer in charge.
The glow stud shall support a load of
13635 kg tested in accordance with
ASTM D4280. The slope of retro-
reflective surface shall be 35 (+/-5)
7 degress to base .The reflective panels
on both sides with at least 12 cm of
reflective area up each side. The
luminance intensity should be as per
the specification and shall be tested
as described in ASTM I: 809 as
recommended in BS: 873 part 4 :
1973. The studs shall be fixed to the
Road surface using the adhesive
conforming to IS, as per procedure
recommended by the manufacturer
complete and as per direction of
Engineer-in-charge.
Preparation of sub-base road
pavement with commercial dry lime
(slaked), fly ash stabilised soil with a
mix of 3% lime, 12% fly ash and 85%
local suitable soil by weight, so as to
achieve minimum field C.B.R. of 20,
including mixing, rolling with road
roller curing etc. all complete.
Providing and laying Dense Graded
Bituminous Macadam using crushed
stone aggregates of specified
grading, premixed with bituminous
binder and filler, transporting the hot
mix to work site by tippers, laying
with paver finisher equiped with
16.54 electronic sensor to the required
grade, level and alignment and rolling
with smooth wheeled, vibratory and
tandem rollers as per specifications to
achieve the desired compaction and
density, complete as per
specificatons and directions of
Engineer-in-Charge.
thickness with bitumen of grade VG-
30 @ 5% (percentage by weight of
9 total mix) and lime filler @ 2%
(percentage by weight of Aggregate)
prepared in Batch Type Hot Mix Plant
of 100-120 TPH capacity.
ECOR-CONST-HQ-ENGG/ECOR
Providing and laying Bituminous
concrete using crushed stone
aggregates of specified grading,
premixed with bituminous binder and
filler, transporting the hot mix to work
site by tippers, laying with paver
finisher equiped with electronic
sensor to the required grade, level
and alignment and rolling with
smooth wheeled, vibratory and
tandem rollers to achieve the desired
compaction and density as per
specification, complete and as per
directions of Engineer-in-Charge.
16.57.1 40/50 mm compacted thickness with cum 735.82 10870.75 7998915.27
bitumen of grade VG-30 @ 5.5%
(percentage by weight of total mix)
10 and lime filler @ 3% (percentage by
weight of Aggregate) prepared in
Batch Type Hot Mix Plant of 100-120
16.62 Providing and applying 2.5 mm thick Sqm 1086 623.8 677446.8
road marking strips (retro- reflective)
of specified shade/ colour using hot
thermoplastic material by fully/ semi
automatic thermoplastic paint
applicator machine fitted with profile
shoe, glass beads dispenser, propane
tank heater and profile shoe heater,
driven by experienced operator on
road surface including cost of
material, labour, T&P, cleaning the
road surface of all dirt, seals, oil,
grease and foreign material etc.
complete as per direction of
Engineer-in-charge and accordance
with applicable specifications.
Construction of granular sub-base by
providing close graded Material
conforming to specifications, mixing
in a mechanical mix plant at OMC,
carriage of mixed material by tippers
to work site, for all leads & lifts,
16.78 spreading in uniform layers of
specified thickness with motor grader
on prepared surface and compacting
with vibratory power roller to achieve
the desired density, complete as per
specifications and directions of
Engineer-in-Charge.
16.78.1 With material conforming to Grade-I cum 1485 2658.1 3947278.5
12 (size range 75 mm to 0.075 mm)
having CBR Value-30
16.79 Providing, laying, spreading and cum 4027.5 2803.65 11291700.38
compacting graded stone aggregate
(size range 53 mm to 0.075 mm ) to
wet mix macadam (WMM)
specification including premixing the
material with water at OMC in for all
leads & lifts, laying in uniform layers
13 with mechanical paverfinisher in sub-
base / base course on well prepared
surface and compacting with
vibratory roller of 8 to 10 tonne
capacity to achievethe desired
density, complete as per
specifications and directions of
Engineer-in-Charge.
22.0 WATER PROOFING
ECOR-CONST-HQ-ENGG/ECOR
crystalline admixture for water
proofing treatment to RCC structures
like basement raft, retaining walls,
reservior, sewage & water treatment
plant, tunnels / subway and bridge
deck etc. at the time of transporting
of concrete into the drum of the
ready-mix truck , using integral
crystalline admixture @0.80%
(minimum) to the weight of cement
content per cubic meter of concrete)
or higher as recommended by the
manufacturer's specification in
reinforced cement concrete at site of
work. The material shall meet the
requirements as specified in ACI-212-
3R-2010 i.e. by reducing permeability
of concrete by more than 90%,
compared with control concrete as
per DIN 1048 and resistant to 16 bar
hydrostatic pressure. The crystalline
admixture shall be capable of self-
healing of cracks up to a width of
0.50mm. The work shall be carried
out all complete as per specification
and the direction of the Engineer-in-
charge. The product performance
shall carry guarantee for 10 years
against any leakage.
26.0 NEW TECHNOLOGIES AND MATERIALS
Providing at all heights, levels and
locations Aluminium profile industrial
troughed sheet of Alloy
31500/31000/40800, conforming to IS
1254, IS 737, IS 2676. The sheet shall
be fixed using self drilling/self tapping
SS screws of size 5.5x65 mm with
EPDM seal complete upto required
pitch in horizontal, vertical or curved
surfaces i/c cutting to size and shape
where required as per specifications,
detail drawings and direction of
Engineer-in-Charge. The rate shall be
inclusive of all screws, seal, ridge,
labour, scaffolding, machinery for
fixing and approved sealent where
required etc. but excluding the cost of
purlins, rafters and trusses.
15 width 1044/920 mm, cover width
26.41S NEW TECHNOLOGY ITEMS
26.65 Providing and fixing roofing consist of Sqm 1026 1630.4 1672790.4
0.8 mm thick galvanized steel deck
sheet confirming to IS 277:1992 used
as permanent shuttering over which
MS wire mesh 3mm laid at 100x100
mm grid including edge trim covered
with concrete. This metal deck will be
supported on structural steel beam
with shear studs. (Structural steel like
Beam, column, joists etc. & concrete
of different grade as per design will
be paid separately).
Schedule Schedule G-Execution of Non Schedule items (Non USSOR-2021 & CPWD-DSR-2021 Items).
Item- 7 Execution of all items under Schedule-G.
S No. Item No Description of Item Unit Qty Rate Amount
ECOR-CONST-HQ-ENGG/ECOR
1 1 Providing Reinforced earth structure Sqm 6000.00 9848.09 59088540.00
including excavationfor foundation,
foundation concrete in M15 and
cementconcrete grooved seating in
thefoundation for facing elements
inM35 (facia material) and
itsplacement, assembling, joiningwith
facing elements and layingof the
reinforcing elements asper Clause
3103, fixing frictionties and anchor
pins etc. as perapproved design and
drawing,providing filter media
ofminimum 300 mm width or
morebehind wall with
perforateddrainage pipe of
requireddiameter both longitudinal
andtransverse direction
asdirected,back filling withapproved
granular selectedmaterial , laying in
layers of 150mm thick, breaking
clods,dressing in required lines,
grades& section,watering
andcompaction by vibratory rolleretc.
including all lifts (for 5 Kmlead &
average height of 8 m)complete.Note
: Back filling ofapproved granular
material of1500mm width to be
provided."Providing REINFORCED
2 2 Supplying & mixing high range poly Kg 500.00 109.64 54820.00
carboxylate ether base water
reducing admixture Plast Super- C700
conforming to lS:9103-1999 (to be
added @ 1% by weight of cement) for
CC & RCC work for controling water
cement ratio and for gaining early
3 3 Provision of an reinforced cement Running 1000.00 783.15 783150.00
concrete crash barrier /r.c.c wall type Metre
railing at edge of the road,
approaches to bridge structure and
medians, constructed with M-25
Grade concrete with HYSD
reinforcement conforming to IRC: 21
and dowel bars of 25mm dia, 450mm
long at expansion joints filled with
pre-moulded asphalt filler board,
keyed to the structure on which it is
built and installed as per desigin and
as per dimension in the approved
drawing and at location directed by
the engineer all as specified
excluding cost of steel reinforcement,
its fabrication chareges and
premoulded filler for finished item (as
per approved drawing).
ECOR-CONST-HQ-ENGG/ECOR
4 4 Providing and laying well graded cum 2250.00 2533.45 5700262.50
drainage fill by 450 mm thick
composed of 20mm, 10mm, and
6mm of well graded aggregate as per
drawing and technical specification
and including cost, seignorage and
conveyence Of all the material to site
and all labour charge, drain pipe
wrapped With geotextile, hire charges
of plant and machinary for laying
filter Media, incluiding technical
supervision as directed by engineer-
in-charge for finished item of work for
drainage layers behind the facts. As
per approved reinforced soil wall
earth(RE) walls with good gravel
(Angle of interna friction not less than
32) depositing the gravel between
walls, spreading gravel, sectioning,
grading and consolidatlon with 8 to
10 Tonnes vibratory road Roller @
OMC and with plate compactor/small
vibrator for 1.5 m width from facia to
meet requirement of table 300-2 of
MORTH, including all hire and
operational charges of T&P and
seigniorage charges, complete for
finished item of work as per MoRT&H
specification 305 & 2200 (5th
Revision) (Payment will be made
based on level for finished Item of
work) as per approved drawing and
as per the directions of the Engineer-
6 6 Conducting non destructive tests on Numbers 350.00 2795.00 978250.00
butt and fillet welds as per IS codes
by Radiography/Ultrasonic, Magnetic
particle test report and dye
penetration tests by approved
agency and submitting the proper
test report to thedepartment duly
certification by the approved agency
with contractor, labor, materials,
tools and plants including leading,
loading and unloading etc complete
as directed by the Engineer-
incharge.R.T.Test (Film 300m long).
7 7 Conducting non destructive tests on Metre 3500.00 608.00 2128000.00
butt and fillet welds as per IS codes
by Radiography/Ultrasonic, Magnetic
particle test report and dye
penetration tests by approved
agency and submitting the proper
test report to the department duly
certification by the approved agency
with contractor, labor, materials,
tools and plants including leading,
loading and unloading etc complete
as directed by the Engineer-in-
charge.D.P.Test/ M.P.Test/U.T.Test.
ECOR-CONST-HQ-ENGG/ECOR
8 8 Providing precast RCC slab for use as cum 187.61 8121.00 1523580.81
shuttering slabs, foot path slab etc,
using M-30 design mix with 20 mm
graded stone aggregate including
fixing and removal of contractor's for
works ,shuttering supports, vibrating
,curing etc and fixing in position (all
labour and materials including
cement by the contractor) with all
lead and lift etc as per approved
drawing and as directed by the
Engineer-in-charge.
9 9 Providing two coats of elastic Sqm 4326.56 534.00 2310383.04
elastomeric membrane coating with
breathing property(viz., "Emce colour
Flex"/Deck guard 'S' or similar type
coating materials) over one coat with
its primer, the system should be
made of water based acrylic polymer
with selected mineral fillers having
properties of ultra violet resistant
crack bridging type, carbonation
resistant, water proofing coating, the
consumption of primary coat and two
coats of protective coating shall be as
per the manufacturers specification
should be in suitable approved
shades, including cost of materials,
cleaning chipping and removing the
dirt particles of the concrete with wire
brush and water, labour for applying
the above coatings, scaffolding
charges, all inclusive taxes etc for
sub structure and super structure of
the Road over Bridge. Dry film
thickness of each coating shall not be
less than 150 microns. Manufaturer
specifications shall be followed.
10 10 Launching girders under traffic block. MT 444.00 12911.36 5732643.84
11 11 Painting of crash barrier/kerb stones Sqm 1186.30 149.00 176758.70
of CC/RCC slabs, stone with approved
quality reflective type of Enamel
paint , including one coat of primer
with contractor's own labour and
material etc. complete as directed by
Engineer -in -charge.
0.2mm) thick heavy duty, full-body
homogeneous, anti-algal, all weather
resistant, exterior use Paving vitrified
tiles of size upto 400mmx400mm in
approved shade, colour & quality,
having anti-skid matt finish surface
with plain or projected texture. Tiles
to be laid on 20 mm average thick
cement mortar bed of 1:4 (1 cement :
4 coarse sand) with all labour,
material complete job.
13 13 Supplying, cutting and fixing 18 mm Sqm 150.00 1203.00 180450.00
thick mastic pads for clean
joints/expansion joints in between
slab etc. as per IS: 1838 specification
inlcuisve of costs of labour, materials,
tools and equipment, loading,
unloading, all lead and lift, including
crossing of railway track, taxes,
royalty and all other incidental
charges etc., complete as diretced by
Engineer-In-charge (cut pieces less
than 500 mm should not be used).
ECOR-CONST-HQ-ENGG/ECOR
14 14 Providing Speed breakers as per Each 2.00 2953.00 5906.00
Railway's approved Plans/Drawings
including painting white and yellow
bands, diagonals etc., complete with
contractors labour men and
materials, machinery, consumables,
approved paint, T&P, Crew, fuel etc.,
complete inlcuidng all lead and lifts
and directed by egineer-In -Charge
15 15 Supply, fabrication, painting and Each 15.00 4429.00 66435.00
erection of road traffic warning
boards of suitable height of various
purposes such as No parking, No
entry , HTV and prohibited etc as per
IRC standards made of 50 * 50 * 5
mm MS angles such and 3 mm thick
MS plate for the board of appropriate
enamel paint and pasted with
reflective stickers reflective paint on
the board erected into the ground
with cement concrete 1:3:6 for 0.30 *
0.30 * 0.60 metre including earth
work excavation, etc as directed by
the Engineer-in-Charge.
16 16 Supplying & fixing of bearing with Each 4.00 122121.26 488485.04
fixtures for 25T loading for composite
girders- welding type 18.3m/24.4m
and 30.5m span Metallic guided
bearing as per RDSO approved
drawings with latest amendment. The
rate is inclusive of supply of Metallic
guided bearings and all other
components of approved dimensions
and specifications based on RDSO
Drawings with latest amendment,
fixing in position on bed block true to
line and level on pier/ abutment. This
included testing charges from
reputed laboratories, inspection
charges, if any, fixing with any other
adhesive material to the satisfaction
of Engineer at site with all lead, lift,
labour etc. complete in all respect.
Note The bearing shall meet with the
requirement as mentioned in the
respective approved drawings.
17 17 Supplying & fixing G.I. lamp posts in Each 10.00 10290.00 102900.00
crash barriers of ROB. The Post shall
consist of G.I. Pipe 100 mm dia 3m
long reduced to 75 mm dia 2.5m long
and again reduced to 50 mm dia 2.5
m vertical height including fixing of
G.I. reducers and welding of G.I.
Pipes, bending ,transportation, all
taxes ,lead, lift etc. Necessary
provision for Electrical concealed
wiring shall be made in the parapets
and lamp posts complete as require.
Rate is also inclusive of fixing of
contractors junction boxes in crash
ECOR-CONST-HQ-ENGG/ECOR
stainless steel railings for taircases,
balconies, FOBs, Enquiry/Reservation
complex etc., made of SS 304 grade
stainless steel, laser cut / water jet
cut (no shearing), polished with
Automatic round/flat polishing
machine to get a uniform hairline
finish. All parts shall be connected to
each other with the help of
prescribed size CNC made solid
connectors, countersunk screws.
Welding should be finished ensuring
that no welding marks are visible and
assembly is mounted on floor with the
help of dash fasteners. Railings shall
be fabricated as per approved
drawings by engineer-in-charge.
Manufacturer shall submit aintenance
manual and basic material test report
for grade certification.
19 19 supplying and fixing approved quality Sqm 100.00 3663.00 366300.00
of poly carbonate sheets 2mm thick
in side walling to suit the required
profile embossed clear translucent UV
protected with all fittings such as J
bolts bitumen and cup washers,
including drilling holes in sheets,
filling the gaps with Sqm silicon
sealant including all cost of labour
materials, lead, lift, transportation,
loading, unloading, etc. Complete as
directed by Engineer-in- charge.
Note: The area of individual sheets
will be taken into consideration for
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .