| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.0 Cr+₹9.3 L (10.1%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.1 Cr+₹18.5 L (20.1%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical NOT PREQUALIFIED |
Tender Value
₹1.2 Cr
EMD Value
₹50,000
Closing Date
19 Dec 2023, 5:00 pmClosed
Managing Director, KINFRA
TC 31/2312,KINFRA HOUSE, Kinfra Head Office , Sasthamangalam, Thiruvananthapuram
O AND M and upkeep of the 6.5 MLD water supply scheme and associated electromechanical equipment and routine and preventive maintenance of pumps and motors, electrical and plumbing system of KEPIP for 3 years
2023_KINFR_626479_1
KINFRA/KEPIP/OM/25/2023-24
Open Tender
AMC/ Maintenance Contracts
Item Rate
1095 days
Kinfra Export Promotion Industrial Park, Kakkanad
As per NIT
2 documents required · 2 mandatory
₹5,900
₹50,000
16 Mar 2024
29 Nov 2023
22 Dec 2023
29 Nov 2023
19 Dec 2023
29 Nov 2023
Amount
Engaging qualified, experienced Supervisor Male - (Total 1 shift per day)
First Year
Second Year
Thrid Year
Engaging qualified, experienced Plant Operator (WTP) 1 each/shift (Male) - Total - 2 shifts per day)
First Year
Second Year
Thrid Year
Engaging qualified, experienced Pump Operator - for intake well site - 2 each/ shift (Men)/ pump house - 2 shifts/day
First Year
Second Year
Thrid Year
Engaging qualified, experienced Helpers (male) - for WTP - 1 each/ shift (Men) - 2 shifts/day
First Year
Second Year
Thrid Year
Sweepers for sweeping and cleaning of floors, walls, roofs etc of WTP and two raw water pump houses and yard daily (Man/woman)
First Year
Second Year
Thrid Year
Engaging qualified, experienced Pipeline fitter for intake well site & WTP (Men)
First Year
Second Year
Thrid Year
Engaging qualified, experienced electrician for electrical repair works (Men)
First Year
Second Year
Thrid Year
Engaging qualified, experienced painter for painting works (Men)
First Year
Second Year
Thrid Year
Engaging qualified, experienced Chemist (WTP-KEPIP) (Men)
First Year
Second Year
Thrid Year
Engaging qualified, experienced Plumber - for O & M activities at KEPIP, WSS (Men)
First Year
Second Year
Thrid Year
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared
First Year
Second Year
Thrid Year
Lifting and carefully removing RCC / heavy duty CI cover slabs of manhole chambers for sluice valves, air valves, scour valves etc. of the pipelines removing the silt deposit, if any, cleaning the body of the valves chamber etc. and replacing the RCC cover slabs after the work carefully without any damage including seating the slabs in cm 1:5 to lines and levels etc.
First Year
Second Year
Thrid Year
Earth work excavation by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm or on plan) , including dressing of sides and ramming of bottoms, lift upto 1.5m , including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All Kinds of soil
First Year
Second Year
Thrid Year
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
First Year
Second Year
Thrid Year
Filling with contractors own gravelly soil /sand including loading, unloading, and stacking for measurements and filling in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
First Year
Second Year
Thrid Year
Cutting tarred surface of the road and disposal of debris as per direction of KEPIP.
First Year
Second Year
Thrid Year
Cutting 300 mm DI pipes perpendicular to the axis of the pipe in trenches using DI pipe cutters wherever required without causing damages to the pipe
First Year
Second Year
Thrid Year
Cutting 200 mm DI pipes perpendicular to the axis of the pipe in trenches using DI pipe cutters wherever required without causing damages to the pipe
First Year
Second Year
Thrid Year
Dismantling the damaged 200 mm D.I./ C.I pipes after taking out the pipes manually/ mechanical means breaking lead caulked joints / rubber rings as the case may be of pipes and specials at site within 50 m lead as per the direction of engineer in charge including stacking
First Year
Second Year
Thrid Year
Dismantling the damaged 300 mm D.I./ C.I pipes after taking out the pipes manually/ mechanical means breaking lead caulked joints / rubber rings as the case may be of pipes and specials at site within 50 m lead as per the direction of engineer in charge including stacking
First Year
Second Year
Thrid Year
Providing and laying S&S Centrifugally Cast (Spun) / Ductile Iron 200 MM Pipes conforming to IS: 8329 (excluding cost of pipe) :
First Year
Second Year
Thrid Year
Providing and laying S&S Centrifugally Cast (Spun) / Ductile Iron 300 MM Pipes conforming to IS: 8329 (excluding cost of pipe) :
First Year
Second Year
Thrid Year
Providing joints to Centrifugally (Spun) 200 mm Cast Iron Pipes or Ductile Iron Pipes including testing of joints by Providing lead caulked joints to spun iron or C.I. pipes and specials including testing of joints but excluding the cost of pig lead and jointing materials :
First Year
Second Year
Thrid Year
Providing joints to Centrifugally (Spun) 300 mm Cast Iron Pipes or Ductile Iron Pipes including testing of joints by Providing lead caulked joints to spun iron or C.I. pipes and specials including testing of joints but excluding the cost of pig lead and jointing materials :
First Year
Second Year
Thrid Year
Providing flanged joints to 200 mm double flanged C.I./ D.I. pipes and specials, including testing of joints excluding cost of jointing materials:
First Year
Second Year
Thrid Year
Providing flanged joints to 300 mm double flanged C.I./ D.I. pipes and specials, including testing of joints excluding cost of jointing materials:
First Year
Second Year
Thrid Year
Providing push on joints to 200 mm DI pipes including testing of joints using rubber rings
First Year
Second Year
Thrid Year
Providing push on joints to 300 mm DI pipes including testing of joints using rubber rings
First Year
Second Year
Thrid Year
Providing mechanical joints to 200 mm DI pipes including testing of joints complete
First Year
Second Year
Thrid Year
Providing Mechanical joints to 300 mm DI pipes including testing of joints complete
First Year
Second Year
Thrid Year
Dismantling the existing sluice valves from the pipeline by cutting and removing the rusted nuts and bolts, disassembling the valve using necessary chain pulley block, taking out the spindle, shutter etc., cleaning the shutter, shutter groove with sharp chisel and Emrine cloth, applying grease and removing old packing etc and resetting and assembling the valve with new packing leather and gland packing rope, nuts and bolts including servicing, greasing and resetting the valve in the pipeline.
First Year
Second Year
Thrid Year
Dismantling the existing foot valve of motor/pumps upto 49 HP, taking it out from the tank using necessary chain pulley block, and rectifing leakages including replacement of flaps and resetting the valve and relaying into the tank
First Year
Second Year
Thrid Year
Dismantling the existing foot valve of motor/pumps of 50 HP and above, taking it out from the tank using necessary chain pulley block, and rectifing leakages including replacement of flaps and resetting the valve and relaying into the tank
First Year
Second Year
Thrid Year
Rectification of leakages/breakage in 160 mm - 300mm PVC pipelines by exposing the pipeline, cutting and dismantling the damaged pipe, laying and jointing new pipe bit using CID joint/coupling, solvent cement after making socket at both the ends of pipe if necessary etc, including protecting the sides of the trenches, bailing out water, controlling the valves, testing the pipe line, back filling etc as per the direction of Engineer - in - charge, excluding earthwork excavation and filling which will be paid seperately.
First Year
Second Year
Thrid Year
Rectification of leakages/breakage in 110 mm PVC pipelines by exposing the pipeline, cutting and dismantling the damaged pipe, laying and jointing new pipe bit using CID joint/coupling, solvent cement after making socket at both the ends of pipe if necessary etc, including protecting the sides of the trenches, bailing out water, controlling the valves, testing the pipe line, back filling etc as per the direction of Engineer - in - charge, excluding earthwork excavation and filling which will be paid seperately.
First Year
Second Year
Thrid Year
Rectification of leakages in 40 mm -90mm PVC pipelines by exposing the pipeline, cutting and dismantling the damaged pipe, laying and jointing new pipe bit using CID joint/coupling, solvent cement after making socket at both the ends of pipe if necessary etc, including protecting the sides of the trenches, bailing out water, controlling the valves, testing the pipe line, back filling etc as per the direction of Engineer - in - charge, excluding earthwork excavation and filling which will be paid seperately.
First Year
Second Year
Thrid Year
Loading heavy dismantled parts of components, pipes and specials and other materials etc. carefully into lorries and transporting the same upto 5 km distance and unloading and stacking the materials at the destination including hire to lorry, wire rope, pully etc
First Year
Second Year
Thrid Year
Loading heavy dismantled parts of components, pipes and specials and other materials etc. carefully into lorries and transporting the same above 5 km and upto 10 KM distance and unloading and stacking the materials at the destination including hire to lorry, wire rope, pully etc.
First Year
Second Year
Thrid Year
Loading heavy dismantled parts of components, pipes and specials and other materials etc. carefully into lorries and transporting the same above 10 km and upto 20 KM distance and unloading and stacking the materials at the destination including hire to lorry, wire rope, pully etc.
First Year
Second Year
Thrid Year
Loading empty Chlorine cylinder to TCC and refilling chlorine cylinder (18 km) including loading & unloading , stacking at both ends. ( 3 cylinders in one load)
First Year
Second Year
Thrid Year
Engaging Men labourers as and when required for work such as dewatering trenches manually , cleaning water weeds in water bodies infront of intakes etc. as per the directions of KEPIP.
First Year
Second Year
Thrid Year
Engaging Women labourers as and when required for work such as dewatering trenches manually , cleaning water weeds in water bodies infront of intakes etc. as per the directions of KEPIP.
First Year
Second Year
Thrid Year
Dismantling carefully motor of 50 HP vertical turbine pump set from the stool without damaging the motor by detaching cable connection, earthing, couplers etc and Dismantling carefully the 50 HP V T pump, without damaging the same by detaching the column pipe, driving shaft, spider bushes, impellers, bearing / bushes etc... and taking out from the pump house using necessary chain pulley blocks and refixing the same after reparing.(Repair Cost not Included)
First Year
Second Year
Thrid Year
Dismantling carefully motor of 50 HP vertical turbine pump set from the stool without damaging the motor by detaching cable connection, earthing, couplers etc and taking out from the pump house using necessary chain pulley blocks and refixing it after the repairing
First Year
Second Year
Thrid Year
Dismantling carefully the motor of capacity above 10 HP upto 49 HP from the bed of pump set / blowers by detaching cable connections, couplers, foundation bolts etc complete without damages to the same and taken out from pump house using necessary chain pulley blocks and refixing the same after reparing
First Year
Second Year
Thrid Year
Dismantling carefully the motor of various capacity upto 10 HP from the bed of pump set / blowers by detaching cable connections, couplers, foundation bolts etc... complete without damages to the same and taken out from pump house using necessary chain pulley blocks and refixing the same after reparing
First Year
Second Year
Thrid Year
K K BAKKER
AQUA TECHSOLE ESTABLISHMENTS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .