Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 CrAdmitted-Finance | ₹5.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.7 Cr+₹11.0 L (1.96%)Admitted-Finance B2 1116 DLF MYPAD VIBHUTI KHAND GOMTI NAGAR LUCKNOW UTTAR PRADESH 226010 INDIA | LUCKNOW | UTTAR PRADESH | 226010 | ₹5.7 Cr+₹11.0 L (1.96%) | L2 | Admitted-Finance |
| 3 | L3₹5.9 Cr+₹32.6 L (5.82%)Admitted-Finance NH 3 A 145 VINDHYANAGAR SINGRAULI MADHYA PRADESH 486885 | SINGRAULI | MADHYA PRADESH | 486885 | ₹5.9 Cr+₹32.6 L (5.82%) | L3 | Admitted-Finance |
| 4 | L4₹6.1 Cr+₹49.0 L (8.75%)Admitted-Finance | ₹6.1 Cr+₹49.0 L (8.75%) | L4 | Admitted-Finance |
| 5 | L5₹6.8 Cr+₹1.2 Cr (21.5%)Admitted-Finance | ₹6.8 Cr+₹1.2 Cr (21.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AKASH ENGINEERING SERVICES L1 | JAYANAND ENGINEERING PRIVATE LIMITED L2 | KRISHNA ENGINEERING WORKS L3 | S R Engineers Enterprise private Limited L4 | prabhat engineering works L5 | KRANTI SERVICE AND ENGINEERING WORKS L6 |
|---|---|---|---|---|---|---|---|---|---|
| 10.00FLY ASH SYSTEM 1st YEAR | |||||||||
| 10.00 | Vac Pp/ Blwr (>20NM3) 04W Chks | 300 | NO | - | - | - | - | - | - |
| 10.00 | MHV (<>) 08W CHKS | 700 | NO | - | - | - | - | - | - |
| 10.00 | Ash Silo (<=1000MT) 04W Chks | 700 | NO | - | - | - | - | - | - |
| 10.00 | Vac Pp/ Blwr(>20NM3)-OH | 48 | NO | - | - | - | - | - | - |
| 10.00 | Vac Pp/ Blwr (>20NM3) Repl | 8 | NO | - | - | - | - | - | - |
| 10.00 | MHV (<>) Repl | 40 | NO | - | - | - | - | - | - |
| 10.00 | MHV (<>) Attend Defect | 1,200 | NO | - | - | - | - | - | - |
| 10.00 | ACI Ash Line (COUPLING) Repl | 1,500 | NO | - | - | - | - | - | - |
| 10.00 | Bag Filters(<>)-Repl | 70 | NO | - | - | - | - | - | - |
Tender Value
₹4.8 Cr
EMD Value
₹10 L
Closing Date
24 Jun 2020, 4:00 pmClosed
RESHU SINGHMANAGER (CONTRACTS)
SSC-WR-II, Office-Sipat - 495555
LONG TERM MAINTENANCE CONTRACT (PM, BD, OH, RCM) FOR ASH HANDLING PLANTSTG-I (2X800 MW), NTPC LARA
2020_NTPC_37008_1
NTPC/SSC - WR-II(Sipat)/9900203032
Open Tender
Serv - Others
Service
730 days
SSC-WR-II, Office-Sipat - 495555
As per tender documents
8 documents required · 8 mandatory
₹3,375
Yes
NTPC Limited
₹10 L
Yes
17 Sept 2020
10 Jun 2020
26 Jun 2020
10 Jun 2020
24 Jun 2020
10 Jun 2020
10 Jun 2020 - 18 Jun 2020
FLY ASH SYSTEM 1st YEAR
Vac Pp/ Blwr (>20NM3) 04W Chks
MHV (<>) 08W CHKS
Ash Silo (<=1000MT) 04W Chks
Vac Pp/ Blwr(>20NM3)-OH
Vac Pp/ Blwr (>20NM3) Repl
MHV (<>) Repl
MHV (<>) Attend Defect
ACI Ash Line (COUPLING) Repl
Bag Filters(<>)-Repl
Ash Silo (BAG FILTER) Cleaning
ACI Ash Line (Dia>6"-12") VAC.CHECKING
PIPE CPLG (DIA>6"-12") Attend Defect
ACI Ash Line(Dia>6"-12")-Attend Defect
ACI Ash Line (Dia>6"-12") Instal/Remove
ACI Ash Line (Dia>12") Laying
ACI Ash Line (Dia>6"-12") ROTATION
ACI Ash Line (Dia>6"-12") Choking Remova
Fluidising Pads(<>)-Repl
Ash Valves(Dia<=6")-Repl
Ash Valves(Dia<=6")-Attend Defect
Ash Valves(Dia>6"-12")-Repl
Ash Valves(Dia>6"-12")-Attend Defect
DS/DE System (<>) Repair
Bunker/Hopper (<>) Choking Removal
Silo Vent Fan(<>)-OH
Rotary Feeder(<>)-OH
Dustconditioner(<>)-OH
Surge/Settling Tank(<>)-OH
Gear Boxes (<>) OH
STRAINER/FILTER (<>) Cleaning
Ash Slurry P/P (Dia>12") Serv
Ash Slurry P/P (Dia>12") OH
Screw Comp (>20NM3) SERVICING
Air Drying Unit (<>) Serv
Screw Comp (INTER/AFTER COOLER) Cleaning
Screw Comp (SCREW ELEMENT) ATTEND BREAKD
SILO U/L SPOUT (<>) OH
Expansion Joints(<>)-Repl
Buffer Hopper (<>) 01W CHKS
Buffer Hopper(<>)-04W Chks
BOTTOM ASH 1st YEAR
BA Hopper (>210MW#) 04W Chks
Flushing App (<>) 12W Chks
MISC WORKS (<>) Choking Removal
BA Hopper (SEAL TROUGH) Choking Removal
BA Hopper (>210MW#) Cleaning
Misc Works (<>) Cleaning
C/Grinder(>210MW#)-Attend Defect
Hydro Ejector (<>) Choking Removal
MS Ash Line (Dia>6"-12") Choking Removal
CB Ash Pipe(Dia>6"-12")-Repl
CB Ash Line(Dia>6"-12")-Attend Defect
C/Grinder (>210MW#) Serv
C/Grinder (>210MW#) RPL-BRG
C/Grinder (GLAND) Repl
Gear Boxes (<>) Repl
Gear Boxes (<>) OH
Fluid Cplg (<>) Repl
Fluid Cplg (<>) OH
C/G F.Cplg/G.Box (<>) ALIGNING
BAH Gate(>210MW#)-Attend Defect
Hydraulic Actuators (<>) Repl
Hydraulic Actuators (<>) Serv
BAH Gate (>210MW#) Repl
BA Hopper (REFRACTORY) Repair
Provideservice SECURITY SUPERVISOR
Deployment of Skilled
Deployment of Semi skilled
Deployment of Unskilled
PUMPS, VALVES, PIPES 1st YEAR
Ash Slurry P/P(Dia>6"-12")-04W Chks
LP Water Pump(Dia>6"-12")-04W Chks
Elec Hoists (>05-10MT) 12W Chks
Ash Slurry P/P (Dia>12") RPL-BRG
Ash Slurry P/P (Dia>6"-12") OH
Ash Slurry P/P (Dia>6"-12") ATTEND BREAK
Fluid Cplg (PST) ATTEND BREAKDOWN
Fluid Cplg (<>) Repl
OIL PP (<>) Repair
Fluid Cplg (OIL COOLER) Cleaning
Gear Boxes (<>) Repair
Gear Boxes (<>) Repl
Ash Slurry P/P (Dia>6"-12") ALIGNING
Ash Slurry P/P (BELT) Repl
Pulley/Cplg(Dia>12")-Repl
Pit/ Sump(<Ash>)-Cleaning
PLUG V/V (<>) ATTEND BREAKDOWN
LP Water Pump (Dia>12") RPL-BRG
LP Water Pump(Dia>12")-OH
LP Water Pump (Dia<=6") Repl
LP Water Pump(Dia<=6")-OH
SEALWATER PP (<>) RPL-BRG
SEALWATER PP (<>) OH
LP Water Pump (Dia>12") ALIGNING
Ash Slurry P/P (Dia<=6") OH
Pit/ Sump () Cleaning
MS Ash Line (Dia<=6") Choking Removal
FLANGE (GASKET) Repl
FLANGE (<>) Repl
Submersible Pumps(<>)-Attend Defect
MATL (OIL) TOP UP
Misc Works (<>) Painting
Misc Works (<>) Letter Writing
Ash Valves(Dia<=6")-Repl
Ash Valves(Dia>6"-12")-Repl
Ash Valves(Dia>12")-Repl
Bends/Laterals (Dia<=6") Fabrication
Bends/Laterals (Dia>6"-12") Fabrication
Bends/Laterals (Dia>12") Fabrication
MS Ash Line (Dia<=6") CUTTING
MS Ash Line (Dia>6"-12") Repl
MS Ash Line (Dia>12") Repl
Structures (<>) Fabrication
Misc Works (<>) CUTTING
Misc Works (<>) WELDING
SCAFFOLDING (5-10M) Erection
Elec Hoists (>03-05MT) ATTEND BREAKDOWN
Elec Hoists(>03-05MT)-Serv
Air Receiver Tanks (<>) INSPECTION
Misc Works (<>) Attend Defect
MATL (SCRAP) DISPOSAL
ASH DYKE 1st YEAR
FLANGE (GASKET) ADJUSTMENT
MS Ash Line (DISCH PT) SHIFTING
MS Ash Line (Dia>12") ROTATION
MS Ash Line (Dia>12") Choking Removal
MS Piping (Dia<=6") Laying
MS Piping (Dia>6"-12") Laying
MS Piping (Dia>12") Repl
Bends/Laterals(Dia>12")-Repl
Bends/Laterals (Dia>12") Fabrication
Misc Works (<>) WELDING
MATL (ASH) Hndlg&Stacking
MATL (ASH) TRANSPORTATION
MS Ash Line (SPOOL) Repl
Structures (GRILL) Erection
LP Water Pump(Dia>12")-04W Chks
LP Water Pump(Dia>12")-Attend Defect
LP Water Pump(Dia>12")-OH
LP Water Pump (Dia>12") ALIGNING
LP Water Pump (GLAND) Repl
EXIGENCIES FOR ASH HAND. SYSTEM 1st YEAR
Deployment of Skilled
Deployment of Semi skilled
Deployment of Unskilled
FLY ASH SYSTEM 2nd YEAR
Vac Pp/ Blwr (>20NM3) 04W Chks
MHV (<>) 08W CHKS
Ash Silo (<=1000MT) 04W Chks
Vac Pp/ Blwr(>20NM3)-OH
Vac Pp/ Blwr (>20NM3) Repl
MHV (<>) Repl
MHV (<>) Attend Defect
ACI Ash Line (COUPLING) Repl
Bag Filters(<>)-Repl
Ash Silo (BAG FILTER) Cleaning
ACI Ash Line (Dia>6"-12") VAC.CHECKING
PIPE CPLG (DIA>6"-12") Attend Defect
ACI Ash Line(Dia>6"-12")-Attend Defect
ACI Ash Line (Dia>6"-12") Instal/Remove
ACI Ash Line (Dia>12") Laying
ACI Ash Line (Dia>6"-12") ROTATION
ACI Ash Line (Dia>6"-12") Choking Remova
Fluidising Pads(<>)-Repl
Ash Valves(Dia<=6")-Repl
Ash Valves(Dia<=6")-Attend Defect
Ash Valves(Dia>6"-12")-Repl
Ash Valves(Dia>6"-12")-Attend Defect
DS/DE System (<>) Repair
Bunker/Hopper (<>) Choking Removal
Silo Vent Fan(<>)-OH
Rotary Feeder(<>)-OH
Dustconditioner(<>)-OH
Surge/Settling Tank(<>)-OH
Gear Boxes (<>) OH
STRAINER/FILTER (<>) Cleaning
Ash Slurry P/P (Dia>12") Serv
Ash Slurry P/P (Dia>12") OH
Screw Comp (>20NM3) SERVICING
Air Drying Unit (<>) Serv
Screw Comp (INTER/AFTER COOLER) Cleaning
Screw Comp (SCREW ELEMENT) ATTEND BREAKD
SILO U/L SPOUT (<>) OH
Expansion Joints(<>)-Repl
Buffer Hopper (<>) 01W CHKS
Buffer Hopper(<>)-04W Chks
BOTTOM ASH 2nd YEAR
BA Hopper (>210MW#) 04W Chks
Flushing App (<>) 12W Chks
MISC WORKS (<>) Choking Removal
BA Hopper (SEAL TROUGH) Choking Removal
BA Hopper (>210MW#) Cleaning
Misc Works (<>) Cleaning
C/Grinder(>210MW#)-Attend Defect
Hydro Ejector (<>) Choking Removal
MS Ash Line (Dia>6"-12") Choking Removal
CB Ash Pipe(Dia>6"-12")-Repl
CB Ash Line(Dia>6"-12")-Attend Defect
C/Grinder (>210MW#) Serv
C/Grinder (>210MW#) RPL-BRG
C/Grinder (GLAND) Repl
Gear Boxes (<>) Repl
Gear Boxes (<>) OH
Fluid Cplg (<>) Repl
Fluid Cplg (<>) OH
C/G F.Cplg/G.Box (<>) ALIGNING
BAH Gate(>210MW#)-Attend Defect
Hydraulic Actuators (<>) Repl
Hydraulic Actuators (<>) Serv
BAH Gate (>210MW#) Repl
BA Hopper (REFRACTORY) Repair
Provideservice SECURITY SUPERVISOR
Deployment of Skilled
Deployment of Semi skilled
Deployment of Unskilled
PUMPS, VALVES, PIPES 2nd YEAR
Ash Slurry P/P(Dia>6"-12")-04W Chks
LP Water Pump(Dia>6"-12")-04W Chks
Elec Hoists (>05-10MT) 12W Chks
Ash Slurry P/P (Dia>12") RPL-BRG
Ash Slurry P/P (Dia>6"-12") OH
Ash Slurry P/P (Dia>6"-12") ATTEND BREAK
Fluid Cplg (PST) ATTEND BREAKDOWN
Fluid Cplg (<>) Repl
OIL PP (<>) Repair
Fluid Cplg (OIL COOLER) Cleaning
Gear Boxes (<>) Repair
Gear Boxes (<>) Repl
Ash Slurry P/P (Dia>6"-12") ALIGNING
Ash Slurry P/P (BELT) Repl
Pulley/Cplg(Dia>12")-Repl
Pit/ Sump(<Ash>)-Cleaning
PLUG V/V (<>) ATTEND BREAKDOWN
LP Water Pump (Dia>12") RPL-BRG
LP Water Pump(Dia>12")-OH
LP Water Pump (Dia<=6") Repl
LP Water Pump(Dia<=6")-OH
SEALWATER PP (<>) RPL-BRG
SEALWATER PP (<>) OH
LP Water Pump (Dia>12") ALIGNING
Ash Slurry P/P (Dia<=6") OH
Pit/ Sump () Cleaning
MS Ash Line (Dia<=6") Choking Removal
FLANGE (GASKET) Repl
FLANGE (<>) Repl
Submersible Pumps(<>)-Attend Defect
MATL (OIL) TOP UP
Misc Works (<>) Painting
Misc Works (<>) Letter Writing
Ash Valves(Dia<=6")-Repl
Ash Valves(Dia>6"-12")-Repl
Ash Valves(Dia>12")-Repl
Bends/Laterals (Dia<=6") Fabrication
Bends/Laterals (Dia>6"-12") Fabrication
Bends/Laterals (Dia>12") Fabrication
MS Ash Line (Dia<=6") CUTTING
MS Ash Line (Dia>6"-12") Repl
MS Ash Line (Dia>12") Repl
Structures (<>) Fabrication
Misc Works (<>) CUTTING
Misc Works (<>) WELDING
SCAFFOLDING (5-10M) Erection
Elec Hoists (>03-05MT) ATTEND BREAKDOWN
Elec Hoists(>03-05MT)-Serv
Air Receiver Tanks (<>) INSPECTION
Misc Works (<>) Attend Defect
MATL (SCRAP) DISPOSAL
ASH DYKE 2nd YEAR
FLANGE (GASKET) ADJUSTMENT
MS Ash Line (DISCH PT) SHIFTING
MS Ash Line (Dia>12") ROTATION
MS Ash Line (Dia>12") Choking Removal
MS Piping (Dia<=6") Laying
MS Piping (Dia>6"-12") Laying
MS Piping (Dia>12") Repl
Bends/Laterals(Dia>12")-Repl
Bends/Laterals (Dia>12") Fabrication
Misc Works (<>) WELDING
MATL (ASH) Hndlg&Stacking
MATL (ASH) TRANSPORTATION
MS Ash Line (SPOOL) Repl
Structures (GRILL) Erection
LP Water Pump(Dia>12")-04W Chks
LP Water Pump(Dia>12")-Attend Defect
LP Water Pump(Dia>12")-OH
LP Water Pump (Dia>12") ALIGNING
LP Water Pump (GLAND) Repl
EXIGENCIES FOR ASH HAND. SYSTEM 2ndYEAR
Deployment of Skilled
Deployment of Semi skilled
Deployment of Unskilled
JAYANAND ENGINEERING PRIVATE LIMITED
KRISHNA ENGINEERING WORKS
S R Engineers Enterprise private Limited
prabhat engineering works
KRANTI SERVICE AND ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .