Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹10.8 L
Closing Date
19 May 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
21 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tender value is including escalation of (-)15% (minus Fifteen percent ) on CPWD DSR rates. Tenderer should note this before quoting the rates.
The original Bank Guarantee (in lieu of Bid Security) should be delivered in person to the official nominated (i.e. OS/Tenders/Engg)/BZA Division) as indicated in the tender document before closing date for submission of bids (i.e. excluding the last date of submission of Bids).
All the instructions furnished in the Technical Compliance / Commercial Compliance / Custom / Undertakings / General Instructions are only indicative and not exhaustive. The tenderer shall read the GCC / Tender documents for complete details.
The tenderer shall thoroughly go through the entire tender document and strictly adhere to the instruction and directions given therein.
BZA Division -GDR-BZA & BZA - KI Section:- Proposed replacement of Girders with new girders which are exceeded their fatigue life of Br. Nos. 4 East & 787 A in SSE/Br/II/BZA section
E-10-Bridges-BZA-2026
E-10-Bridges-BZA-2026
Open
Works - General
12 Months
Krishna, Andhra Pradesh
₹0
₹10.8 L
19 May 2026
24 Apr 2026
5 May 2026
71 items across 9 schedules · ₹5,43,27,183.26 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Supplying, fabrication, assembling of all types of steel girders of specified spans with structural steel conforming to Quality "B0" Grade Designation E250 conforming to IS:2062, erection / slewing / end launching of steel girders with cranes or any other approved launching methods as per site conditions (not requiring traffic block) on sub-structure including provision of trolley refuges etc., complete as per approved Q A P and drawings conforming to IRS-B1-2001 and other relevant codes and specifications. Note: 1. Detailed fabrication and erection drawings & launching methodology will be prepared by the contractor and got approved from Railway. 2. The rate is all inclusive including launching in position, complete in all respect except cost of (i) Painting / Metalising; (ii) Bearings & (iii) HSFG bolts which shall be paid extra under relevant item. 3. The payment shall be made on the theoretical weight of main components and gusset plates only. 4. Payment Schedule: (i) Receipt of material at site: 40% (ii) Fabrication of girders: 20% (iii) Erection/Launching: 20% (iv) Completion in all respects: 20% | — | — | — | — | |
| 1 | Plate Girder/Semi Through Girder/Composite Girder (Steel Work) | MT | 241.00 | 1,42,444.59 | 3,43,29,146.19 |
| 2 | Extra for using steel conforming to Grade Designation E350 instead of Grade Designation E250 of Quality "B0" as per IS: 2062 | MT | 241.00 | 3,839.88 | 9,25,411.08 |
| 3 | Deduct for using steel conforming to Quality "BR" instead of Quality "B0" of Grade designation E250 as per IS:2062. | MT | 60.00 | -3,772.38 | -2,26,342.8 |
| Schedule total | ₹3,50,28,214.47 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1MasterDocument01Apr2026.pdf
ATTACHMENT
2MASTERDOCUMENT02DLP04Apr2026.pdf
ATTACHMENT
3SCHEDULES.pdf
ATTACHMENT
4Specialconditionsforregirderingwork.pdf
ATTACHMENT
5Genl.conditions.pdf
ATTACHMENT
6H-BeamsleepersfittingsSplConditions.pdf
ATTACHMENT
7Specificationofcontrolledconcrete.pdf
ATTACHMENT
8SteelspecialConditionscorrections12months.pdf
ATTACHMENT
9SpecialConditionsLAYINGHbeamsleepers.pdf
ATTACHMENT
10TRDsafetycondition.pdf
ATTACHMENT
11GalvanisationconditionsforH-beamsleeperfitting.pdf
ATTACHMENT
12SafetyPrecautionsatsite.pdf
ATTACHMENT
13RevisedApprovedBrandsandMakes-260220261_compressed.pdf
ATTACHMENT
14SteelprepaymentHQLr26052022.pdf
ATTACHMENT
ACS-11GCC-2022.pdf
ATTACHMENT
29.12.2025DefectLiabilityPeriodDLP04yearsmaintenanceperiodunderIRGCCandEPCContractsofBridge_ROB_RUBsworks..PDF
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .