Loading…
Loading…
Tender Value
₹32.5 L
EMD Value
₹65,000
Closing Date
8 Jul 2026, 4:00 pmDue today
Executive Engineer I-FC Division Kargil
Executive Engineer I-FC Division Kargil
Construction of balance work of Percolation/Reservoir Tank at Talmando with P/bund by cement concrete
2026_PWD_19101_3
e-Tender 10 of 2026-27/INFC Kargil
Open Tender
Civil Works - Canal
120 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹330
Payable To Executive Engineer I-FC Division Kargil
₹65,000
22 Jun 2026
22 Jun 2026
9 Jul 2026
22 Jun 2026
8 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means over areas (exceeding 30cm in depth ,1.5m in weadth as well as 10 sqm on plan ) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m ,as directed by Engineer -in-charge | |||||
| 1.01 | All Kind of Soil 80% | 124.72 | Cum | 531.04 | ₹66,231.31 |
| 1.02 | Ordinary Rock 15% | 23.38 | Cum | 842.03 | ₹19,686.66 |
| 1.03 | Hard Rock (B.P) 05% | 7.79 | Cum | 1,987.92 | ₹15,485.9 |
| 2Earth work in excavation by manual means in foundation trench or drains (not exceeding 1.5m in weadth or 10 sqm on plan )including dressing of sides and ramming of bottoms ,lift upto 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 50m | |||||
| 2.01 | All Kind of soil 80% | 112.6 | Cum | 431.41 | ₹48,576.77 |
| 2.02 | Ordinary Rock 15% | 21.11 | Cum | 954.5 | ₹20,149.5 |
| 2.03 | Hard Rock (B.P) 05% | 7.03 | Cum | 1,947.27 | ₹13,689.31 |
| 3 | Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching using plum aggregate 20mm, volumetric batching using plum (size over 160mm, split nallah stone or quarry stone) @20% of gross volume upto plinth level excluding cost of form work and including curing complete.. | 390.56 | Cum | 5,330 | ₹20,81,684.8 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 173.2 | Cum | 168.98 | ₹29,267.34 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_45523.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid