Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 LAccepted-AOC H NO 19 6 243 1 NGO S COLONY SHIV NAGAR NORTH BIDAR 585401 | BIDAR | KARNATAKA | 585401 | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹25.6 L+₹3.0 L (13.3%)Rejected-Finance 0001D ATM HOUSE AIR FORCE NEENA THAPA GORAKHPUR UTTAR PRADESH 273008 UDYAM UP 32 0054752 | GORAKHPUR | UTTAR PRADESH | 273008 | L2 | Rejected-Finance Due to L2 |
Tender Value
₹24 L
EMD Value
₹48,000
Closing Date
4 Aug 2020, 6:00 pmClosed
GE (AF) Bidar
GE AF Bidar, Naubad road, Bidar, Karnataka 585401
OUTSOURCING OF SERVICES FOR MAINTENANCE AND OPERATION OF ELECTRIC SUPPLY INSTALLATIONS AND DG SETS AT MAFI SUB STATION 1 AND 2 AND HANGER NO 6 AT AFS BIDAR
2020_MES_354411_2
8222/E8
Open Tender
Manpower Supply
Item Rate
330 days
GE (AF) Bidar
As per NIT
7 documents required · 7 mandatory
₹500
GE (AF) Bidar
₹48,000
Yes
11 Aug 2020
13 Jul 2020
5 Aug 2020
13 Jul 2020
4 Aug 2020
21 Jul 2020
Amount
Maintenance and operation with One Skilled Elect/ FGM per shift of 8 hours each for three shifts per day on all days including Sundays & Holidays, for Indoor sub station complete with APFC Panel-01 No, Transformer 750 KVA - 01 No, HT VCB 630 Amps – 06 Nos, Voltage stabilizer 750 KVA - 01No, Isolation transformer 750 KVA, LT Panel board – 03 Nos all as directed and specified. (Location: NEW ATC MAFI Substation No 1) Shift Timings:- (i) First shift:- 0600 hrs to 1400 hrs. (ii) Second Shift:- 1400 hrs to 2200 hrs. (iii) Third shift:- 2200hrs to 0600 hrs.
Maintenance and operation with One Skilled Elect/FGM per shift of 8 hours each for three shifts per day on all days including Sundays & Holidays, for of Indoor sub station complete with APFC Panel-01 No, Transformer 200 KVA - 01 No, HT VCB 630 Amps – 06 Nos, Voltage stabilizer 200 KVA - 01 No, Isolation transformer 200 KVA 01 No, LT Panel board – 03 Nos & DG Set 200 KVA 01 No all as directed and specified. (Location: HQ Bldg MAFI Substation No 2). Shift Timings:- (i) First shift:- 0600 hrs to 1400 hrs. (ii) Second Shift:- 1400 hrs to 2200 hrs. (iii) Third shift:- 2200hrs to 0600 hrs.
Maintenance and operation with One Skilled FGM per shift of 8 hours each for three shifts per day on all days including Sundays & Holidays, for Sub station complete with APFC Panel-01 No, Transformer 750 KVA - 01 No, VCB 11 KV 630 Amps – 01 No, Voltage stabilizer 750 KVA - 01, Bore wells - 02 Nos, LT Panel board – 02 Nos, DG Set 1000 KVA - 01 No all as directed and specified. (Location: Hanger No. 6). Shift Timings:- (i) First shift:- 0600 hrs to 1400 hrs. (ii) Second Shift:- 1400 hrs to 2200 hrs. (iii) Third shift:- 2200hrs to 0600 hrs. Note for Sl item No 1 to 3 : (i) General cleanliness of power houses to be maintained. (ii) Monitor/Recording of following parameters i.e, HT voltage, Frequency, LT voltage, current of panels, Engine Temp, Oil & Pressure, RPM for DG Sets in Log sheets. (iii) Daily checking (Fuel, Oil, water, maintenance) of Gen Sets, Plants to be carried out in each shift. (iv) HT break down / Shut down register be maintained separately in Hanger No 6 power house. (v) Number of shifts in each installation will be as directed by Engineer-in-charge.
om sai enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .