Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.4 LAccepted-Finance | ₹5.4 L | 1 | Accepted-Finance accepted |
| 2 | 2₹5.8 L+₹33,277.18 (6.11%)Accepted-Finance 2 3 AMIT VIJAY APT CHSL KASTURBA CROSS ROAD NEAR BHANU PARK KANDIVALI WEST MUMBAI 400 067 | MUMBAI | MUMBAI | MAHARASHTRA | 400067 | ₹5.8 L+₹33,277.18 (6.11%) | 2 | Accepted-Finance accepted |
| 3 | 3₹8.9 L+₹3.4 L (63.1%)Accepted-Finance | ₹8.9 L+₹3.4 L (63.1%) | 3 | Accepted-Finance accepted |
| 4 | 4₹9.2 L+₹3.8 L (69.2%)Accepted-Finance | ₹9.2 L+₹3.8 L (69.2%) | 4 | Accepted-Finance accepted |
| 5 | 5₹9.4 L+₹3.9 L (71.9%)Accepted-Finance | ₹9.4 L+₹3.9 L (71.9%) | 5 | Accepted-Finance accepted |
Tender Value
₹10.7 L
EMD Value
₹21,388
Closing Date
30 Apr 2024, 12:00 pmClosed
K. CAMBRIDGE KANNA
NABARD Kerala RO, Punnen Road, Statue, Thiruvanantapuram 695001
Tender for Engaging Consultant and Conducting Structural Audit of NABARD Staff Quarters Building, Thiruvananthapuram-695012.
2024_NABA_803466_1
NB/KERALA/DPSP/134/SQ50/23-24
Open Tender
Consultancy
Item Rate
60 days
NABARD STAFF QUARTERS THIRUVANANTHAPURAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹21,388
Yes
1 Jul 2024
9 Apr 2024
2 May 2024
9 Apr 2024
30 Apr 2024
9 Apr 2024
9 Apr 2024 - 11 Apr 2024
Rebound Hammer Test
Conducting the rebound hammer test with required instruments/ equipment by preparing the surface of RCC structural members such as beams, columns, slabs etc. by chipping the plastered surface/ finishing/ cladding to expose the concrete, smoothening the area using carborundum stone all in terms of relevant IS code : 13311-1992(Part 2) or as directed. The quoted rate shall be inclusive of cost of all tool & tackles, restoration of the test area/spots after conduct of test with matching paint, associated sundry work etc. (contractor shall visit the site for inspection before quote).
UPV ( Ultrasonic Pulse Velocity ) Test
Conducting the UPV test with required instruments/equipment by preparing the surface of RCC structural members such as beams, columns, slabs etc. by chipping the plastered surface/ finishing/ cladding to expose the concrete, smoothening the area using carborundum stone all in terms of relevant IS code : 516 ( Part 5, Section 1 ) or as directed. The quoted rate shall be inclusive of cost of all tool & tackles, restoration of the test area/spots after conduct of test with matching paint, associated sundry work etc.. (contractor shall visit the site for inspection before quote).
Carbonation Depth Test
Preparing the surface of RCC structural member such as beams, columns, slabs, water tank walls & slab etc. by chipping the plastered surface/ finishing/ cladding to expose the concrete, cutting etc. as per relevant code, and conducting carbonation test at various depth as directed by consultant using phenolphthalein of specified concentration to assess depth of carbonation. The ratio of Carbonation depth to cover depth is also to be measured to check the intensity of carbonation attack on steel bar. The quoted rate shall be inclusive of cost of all tool & tackles, restoration of the test area/spots after conduct of test with matching paint, associated sundry work etc. (contractor shall visit the site for inspection before quote).
Half Cell Potential Test for corrosion mapping
Cover Meter Test
Measuring the exact concrete cover and steel reinforcement using the alternating magnetic fields. The test result should indicate required cover thickness and estimated size of the bar if the depth of the cover is known. The test result should also indicate quality of the cover. Cover tests are to be done in accordance with the IS 1199 and IS 516
Preparation of BoQ
Preparing the bill of quantity, tender document and CAD drawing (which shows distressed areas) for the proposed structural rehabilitation work to be undertaken
Periodical Visits
Periodical visit during execution of the proposed structural rehabilitation works (10 visits) a.Before starting the structural repair works – 2 visits b. During the structural repair works – 5 visits. c. After completion of the structural repair works – 3 visits
Visual Inspection
Visual inspection regarding the structural assessment of the buildings and the proposed structural rehabilitation to be undertaken
Assessment after structural rehabilitation work
Conditional assessment after the completion of the proposed structural rehabilitation work buy undertaking 1/3 the NDT test indicated in the original testing.
B.J.MEHTA ARCHITECTURAL & STRUCTURAL CONSULTANTS PVT. LTD.
Vijna Consulting Engineers Pvt Ltd
Stanchion Designs Pvt. Ltd.
Avon Consulting Engineers
SUSHUMNA CONSULTANCY SERVICES LLP
S P BAGWE CONSULTANTS PVT LTD.
Bureau Veritas (India) Pvt. Ltd
MANUPAMA TECHNOLOGIES PRIVATE LIMITED
Advice Consultants
Capstone Consultants Private Limited
KBP Civil Engineering Servises
IRCLASS Systems and Solutions Private Limited
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .