Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 102 JASMINE PLOT N0 15 SECTOR 44 SEAWOODS WEST 400706 THANE MAHARASHTRA 400706 | THANE | MAHARASHTRA | 400706 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance 22 1 48 1 CHENGALARAOPETA BEACH ROAD VISAKHAPATNAM ANDHRA PRADESH 530001 | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
19 Feb 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-OS
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Routines on Propeller shafts, Rudders, Bow thruster and Kort nozzles of DCI DREDGE XVII
2024_HSL_94302_1
20 / 22021 / 075 / Propeller and Rudder / 2023-24
Open Limited
Miscellaneous Services
Service
20 days
HSL Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹525
Yes
HSL
₹20,000
Yes
26 Feb 2024
14 Feb 2024
19 Feb 2024
14 Feb 2024
19 Feb 2024
14 Feb 2024
Amount
Routines on Propeller shafts, rudders, bow thruster and kort nozzles. Detailed scope of work is attached here with along with Annexure-1 Contractor should be in a position to mobilise and start the work within 2 days. Contractor havifng valid experience in execution of similar works will only be considered. Required tools viz., load tested chain blocks, lifting belts, slings, measuring instruments (calibrated) are to be arranged by contractor. The contractor shall have to engage men on round the clock basis and also on sundays and holidays.
PROPELLERS: Controllable pitch propeller, CPP- (make-LIPS, type-86*F5/4, blades-4)*** All Spares DCI Supply.
Port and Stbd. propeller shaft drop to be taken and recorded (Before/After).Port and Stbd propeller blades tip clearance to be taken and recorded .Stern oil from both the Stern tube to be drained and new oil to be taken in (Ship supply).Required eye pads to be welded for withdrawal of shafts.
Propeller shafts (P & S) are to be decoupled using hydraulic power pack with suitable markings on sleeve/muff couplings , withdrawn completely for inspection. After DP/MP test on bearing areas and servicing, same to be fitted back in position including coupling, after inspection / survey. Propeller shaft Fwd & Aft Liners/bushes & shaft to be calibrated, renewed as required and seals is to be renewed (Liners, fwd & aft seal ship's supply). Necessary seals to be pressure tested .liners skimming / machining to be done. Satisfactory trials to be shown.NDT to be carried out by qualified level-3 technician in presence of IRS. NDT technician during class inspection to be arranged by the vendor along with necessary consumables like dp test kit,MP spray bottles etc.Calibrated tools to be used for all measurements.certificates to be produced. Required chain blocks,lifting belts,slings,hydraulic powerpack & jacks, of suitable capacities with load test certificates only to be used and the same are to be produced. *** All spares DCI supply.Skimming of chrome liners during renewal of liners is under vendor scope cost inclusive.
b) P&S existing Propeller blades to be removed from the Hub and fitted with reconditioned propeller blades with new 'O' rings (Ship supply). Tighten the holding bolts to required torque. After completion of repairs, satisfactory trials to be shown to ship staff (Seals/O-rings ship’s supply). .
c)Both P & S Propeller hubs to be dismantled, cleaned, inspected, overhauled and hub to be pressure tested. DP/MPI tested & polished and assembled back with new seals / O rings. Tighten the holding bolts to required torque 6000N-m. Non return valve in the hub to be opened and pressure tested.Calibrated tools to be used for torque tightening. Torque wrench/multiplier with calibration certificates must be arranged by vendor .Propeller blades to be cleaned , buffed, polished and one coat of varnish to be applied(varnish and other consumables are to be procured and supplied by vendor )
d)Oil Distribution (OD) box Make : LIPS, Ho0992/95), Type: VL 80-C/4C-3 i) Both Port & Stbd CPP Oil Distribution Box to be dismantled, inspected, thoroughly cleaned, completely overhauled and offered for survey including push pull rod. If any defects found during inspection, same to be rectified. After survey / inspection / overhauling all parts to be assembled and fitted back in position, linkages to be adjusted. (Spares - Ship supply). pitch indicator situated on engine room & propeller blades pitch position readings to be calibrated and to match the readings. (Spares – ship’s supply )/Short fall of spares required for overhauling maybe procured by vendor . *** Spares DCI Supply.
e)KORT NOZZLE: a) Port and Stbd. Kort nozzle drain plugs to be opened, flushed / cleaned with water, pressure tested after repairs, fish oil to be applied and plugs to be fitted back and cemented. During pressure testing, If any crack or dents are identified the same will be repaired by SRC-Steel dept ,re-pressure test to be carried out till no leaks are found/proving of pressure test.
RUDDER/STEERING:Free hanging Rudder (make-Bekker, type-NC-2900/415/K-1, oil filled)*** All Spares DCI Supply.
a) Port and Stbd.rudder bottom plug to be opened and checked for water. Plug to be fitted back after pressure testing and cemented after flushing rudder space with fish oil(fish oil supply is under contractors scope). If any crack or dents same will be repaired by SRC-Steel dept ,re pressure test to be carried out till no leaks are found/proving of pressure test. Port and Stbd.rudder drop and jumping clearances to be taken and recorded (Before/After).
b)Both P & S Rudder to be dismantled and un-shipped . After repairs to be fitted in place & securing nut tightened hydraulically(P&S). Rudder nut inspection door to be removed & re-welded on completion of work.
c)Rudder stock to be unshipped using external hydraulic power pack(to be arranged by contractor). Stock to be cleaned, inspected for any damages at bush and bearing area and to be calibrated. Stock tapper roller bearing to be checked and renewed if required. Bearing housing to be cleaned and inspected for any damages, same to be renewed if required. Tiller and tiller swivel bearings to be checked and renewed if required.Rudder stock neck bushes, liners and seals to be checked and renewed including machining, if required ( Bushes,liners, bearings and seals ship supply ). After completion of all repairs, satisfactory sea trials to be shown to SS and IRS.MPI and DP test to be carried out on rudder stock. Greasing passage to rudder bush to be ensured clearall consumables tools and tackles ,chain blocks of required capacities,fabrication of pullers,eye pads welding ,procurement of fish oil is under contractors scope.
d)Bedding of Rudder and Rudder stock (tiller side, rudder side) to be carried out, hydraullically inserted as per oem procedures, blue-matching to be checked for maximum contact area (80 %). Insitu grinding / polishing to be carried out on the contact surfaces (of rudder stock as well as housings of rudder & tiller) till satisfactory blue-matching & bedding is achieved to satisfaction of shipstaff and IRS
e)Steering Gear link bearings and pins to be inspected/calibrated.Necessry repairs on tiller arm pin holes and pins to be done as instructed by Ship staff / Supdt. (All spares Ship supply).Steering gear cylinders to be disconnected, dismantled, overhauled, seals to renew (ship supply), pressure tested and fitted in position.
BOW THRUSTERS:(make- Lips, type-FT 175)
a) Fwd. and Aft bow propeller to be cleaned, buffed and polished Fwd. and Aft bow propeller tip clearances between tunnel to be taken and recorded
b)Bow thruster gear box ( In- situ)To Overhaul by opening inspection cover , check the gears, bushes and bearings . Renew seals and fit back. Ensure no leaks of GB. Gear box LO NRVs to be overhauled/serviced. *** Spares DCI Supply.
c)Bow thruster gear box Overhaul :Bow thruster to be removed from ship and shifted to jetty using suitable lifting aids(certified).Bow thruster to be overhauled,check the gear, bushes and bearings.NDT test to be carried out on Gear wheels, shafts as required with Qualified technicain only, to be carried out in presence of IRS.Post completion of overhauling the same to be fitted in position using new gaskets.Spares for gear box overhaulling will be arranged by DCI.Consumbles like rubber joints, bolts and nuts, dp test kits are to be arranged by vendor .
SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD
SRI SRINIVASA ENGINEERING WORKS
RAO ELECTRICAL ENGINEERIONG WORKS
VOYAGER MARINE SERVICES INDIA PRIVATE LIMITED
NASS Engineering Services Pvt Ltd
prabhu engineering works
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Restricted Tender
This is a Open Limited tender. Documents are accessible only to bidders authorized by the issuing authority on the government portal.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .