Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹326.6 CrAccepted-AOC | ₹326.6 Cr Quoted ₹219.6 Cr | L-1 | Accepted-AOC Work has been awarded to L-1 bidder, accepted by TC and duly approved. |
| 2 | L-2₹222.8 CrRejected-Finance | ₹222.8 Cr | L-2 | Rejected-Finance Work has been awarded to L-1 bidder, accepted by TC and duly approved. |
Tender Value
₹242.4 Cr
EMD Value
₹50 L
Closing Date
2 Sept 2022, 5:00 pmClosed
GM(CMC),SECL
Office of the GM (CMC),SECL
Operation and Maintenance of Continuous Miner package of SECL for winning coal without blasting from the district in Jhilimili underground Mine of SECL.
2022_SECL_249467_1
SECL/BSP/CMC/ BKP/e-Tender/ 544 Date- 08.07.2022
Open Tender
Miscellaneous Services
1825 days
Jhilimili Underground Mine, Baikunthpur Area.
As per NIT
13 documents required · 13 mandatory
₹50 L
Yes
Office of the GM (CMC),SECL
21 Dec 2022
11 Jul 2022
5 Sept 2022
11 Jul 2022
2 Sept 2022
27 Jul 2022
11 Jul 2022 - 22 Aug 2022
22 Jul 2022
Amount
Item Description/ Heading
Operation & Maintenance of Continuous Miner package of SECL for winning coal without blasting from the district(s) in Jhilimili underground Mine of SECL inclusive of: i) Shifting the continuous miner package from Workshop of Hasdeo Area and satisfactorily commission the same at Jhilimili underground Mine. ii) Scientific study for obtaining DGMS permission for the introduction of Continuous Miner package in the above mine and strata monitoring as required by DGMS including supply of instruments. iii) To support the roof suitably based on scientific study in accordance with Coal Mines Regulation 2017, including supply of consumables. iv) Supply of maintenance spares & consumables of Continuous miner package during the contract period. During the contract period the successful bidder has to achieve Annual guaranteed production (AGP) as per targets fixed for respective Annual Production Periods (APP). The AGP during the 5 years (APPs) shall be: 1st to 5th Year – 0.5 MTY Total- 2.5 MT Period: 1825 days NOTE: 1. The rate to be quoted by the bidder shall be exclusive of GST 2. For evaluation of bid, the total of the Present Values (PV) of the cash outflow of each APP during the contract period will be considered. Present Value (PV) of the cash outflow of a particular year shall be calculated based on the rate quoted by the bidder against that APP and discounted by applying a discounting rate of @12%. The L-1 will be decided based on sum total of the Present Values (PV) of the cash outflow of each APP during the contract period. 3. The specific price quoted by bidder for a particular APP shall not be less than that of preceding APP
Total impact of GST for the purpose of CTC
JMS Mining Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid