Superintending Engineer (AM) Anjar
Conductor replacement with Hardware & SRI of 66KV Reladi Anjar Tower line (on 132KV Tower) under Bhuj AM Division under Anjar AM Circle (Work approved under R&M 2026-27)
341867
Anj/CMC/R&M/e-Tn-132/2026
Open
Electrical Works
Works
Kutch
14 documents required · 14 mandatory
₹1,180
GETCO TR CO ANJAR
₹28,799
3 Sept 2026
3 Sept 2026
3 Sept 2026
23 Sept 2026
3 Sept 2026
Sr. Particulars Code
1 Tender Notice
2 Integrity pact
3 Detail to be furnished by the tenderer
4 Qualification requirement QR
5 Safety clause
6 General commercial Conditions GCC
7 Terms & Conditions regarding Industrial Laws and Other
Related Matters.
8 General condition GTC
9 Specification for work
10 Appendices I to VIII and formats
11 Performa for Safety Bond, Safety cum indemnity bon, Contract
Note: 1. The detail drawings are available at the Asset Management Division, Bhujfor
reference on any working day. It is binding upon to Contractor and Presumed that the
same is read and gone through. (Even though if it is not attached with Tender Copy).
2. Utilization of CBUD(Call Before you Dig) before excavation/digging:
As per Government guide line before excavation/digging apply in CBUD application to protect the
underground assets of various departments. As per guide line before excavation/digging
mandatory to use the CBUD application
Seal and Signature of Contract Page 1 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Tender notice no. : Anj/CMC/R&M/e-Tn-132 /2026
Superintending Engineer, Asset Management Circle GETCO Anjar invites “On line Tenders” (e-
tendering) for the work of Conductor replacement with Hardware & SRI of 66KV Reladi Anjar
Tower line (on 132KV Tower) under Bhuj AM Division under Anjar AM Circle (Work
approved under R&M 2026-27) from registered contractors in appropriate class with GETCO
and who has executed similar nature of work successfully as mentioned in Qualification
requirement criteria given in the tender document. Bidders should fulfill all the qualification
criteria. Otherwise their bids will not be considered & price bid will not be opened. All the bidders
should have valid e-tender vender registration. Tender papers & specifications may be down loaded
from web site https://getco.nprocure.com(for view, download and online submission) and
GUVNL/GETCO websites www.getcogujarat.com(for view & download only).
All tender documents are to be uploaded (Notarized / self attested copies of original – as
specified in tender document) through on line only (which is mandatory) on (n) procure
The Superintending Engineer (TR)
Gujarat Energy Transmission Corporation Limited.,
Circle office GETCO – Anjar, Power house, Bhuj Road,
Anjar – 370110 District : Kutch, Gujarat
Sr. Name of Work Estimated Time Tender EMD amount Approp
No. Cost Rs. Limit Fee (include (1% of riate
18% estimated class
GST)(Non labour cost)
refundable) in Rs.
Conductor replacement
with Hardware & SRI of
66KV Reladi Anjar
Tower line (on 132KV (Labour cost 1000.00+
1. Tower) under Bhuj AM incl. 18% 180.00 28799/-
Division under Anjar GST) =1180.00
AM Circle (Work
approved under R&M
1 On line (E-tendering) tender/ offer submission last date up to 15.00 hours
only (This is mandatory)
2 Date of opening of technical bid– on line opening at 16:00 hrs. (if
3 After evaluation of
Tentative Date of on – line opening of Price bid technical bids
Seal and Signature of Contract Page 2 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
1. All the Appendices, forms, formats, declaration, undertaking, etc (To be submitted on bidder’s
letterhead), Tender acceptance letter (on bidder’s letterhead), price bid, tender documents specified in
the tender must be submitted through online on n-procure portal (mandatory) (All the documents to be
duly self attested by the bidder). For any differences or wrong entry bidder shall be sole responsible for
that documents.
2. Bidder has to upload scanned copies of original documents (Notarized / self attested copies of original –
as specified in tender document) online in PDF form on n-procure portal and no physical documents to
be submitted by the bidder
3. Bidder has to submit Tender fee, EMD Otherwise the offer will not be considered and no any further
communication in the matter will be entertained.
4. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF form) remain
legible (readable) and should not be password protected.
5. In case of short submission of documents with bid and / or clarification if any required from the bidder,
the required details / documents may be asked from the bidder in physical form.
6. Suitable payment options (from any of below mentioned) can be selected for Tender fees and EMD by
a) Payment can be done by RTGS/NEFT.
In case of payment through RTGS/NEFT the scan copy of payment has to be uploaded online with the
Tender documents on n-procure portal and the bidder has to mail following details:
Sr. No. Required Details
1. Name, Postal Address with Pin code, Contact No. & E-mail address of the bidder
2. Bidder GST No.
3. Tender No. with due date
4. Mode of Transfer
5. Ref. ID with Bank Details
7. Payment against (Tender Fee / EMD)
Mail To: [email protected]
and cc To: [email protected]; [email protected]
NOTE: Bidder has to provide all above details on the same date of payment so that receipt can be
GETCO Beneficiary Bank Details are as under:
1. Name of Account Holder GETCO
3. Name of Bank BANK OF BARODA, NAYA ANJAR BRANCH
5. Address of Bank NAYA ANJAR BRANCH
6. IFSC Code BARB0DBNAYA (Fifth digit numerical zero)
7. PAN No. AABCG4029R
8. TAN No. RKTG00928E
9. GST No. 24AABCG4029R2ZC
7. No Tender fee, EMD t shall be accepted in case of receipt after due date and time as specified in
the tender document, any reasons and the Corporation shall not assume any responsibility for
late receipt of the same.
8. Tender without EMD and tender fee shall be rejected.
Seal and Signature of Contract Page 3 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
9. Bidders are requested to remain in touch with the n-procure portal for any
amendment/corrigendum or extension of due date etc
10. The GETCO reserves the right to award the work to one or more bidders, considering their technical and
financial capacity OR to reject any or all tenders or accept any tender without assigning any reason
Any technical questions, information and clarification that may be required pertaining to this enquiry should be
referred to: The Superintending Engineer (TR), Gujarat Energy Transmission Corporation Limited., Circle
GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer (TR)
Transmission Circle office
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe” website.
Note:In case bidder needs any difficulty in accessing / submission of on line bid / clarification or if training
required for participating in online tender, they can contact the following office:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 ( Gujarat )
Phone No. 079-26857315 / 316 / 317, Fax: 079-26857321 / 40007533, Email: [email protected]
Seal and Signature of Contract Page 4 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Seal and Signature of Contract Page 5 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Qualifying Criteria Table:
Sr. Qualifying Requirements
1. Registration :The bidder shall be strictly a GETCO register contractor of any class
2. Technical Criteria:
1. Length of transmission line on tower/ H frame to be tenderize -
The bidder should have erected transmission lines including stringing of
conductor and earth wire of 66 kV and above class lines on tower/H-frame
for line length Minimum 50 RKM line cumulatively in last 3 financial
The bidder should have carried out similar nature of work like
stringing/restringing/earth wire replacement work of 66KV & above
class lines on tower/H-frame for line length Minimum 50 RKM line
cumulatively in last 3 financial years.
( Copy of W.O including Schedule-B + Work completion certificate/3A form
duly signed by concern authority )
Experience of sub-order shall not be considered.
3. Financial Criteria:
The bidder shall submit the Bank solvency of the amount which is 20% of the
total estimated cost of tender.
Qualification requirement:
Note:- Only provide following documents with technical bid on nprocure in chronological manner (Sr.
No. sequence) only
1. GST Tax Registration No. date / issuing authority. GST No. must be online active
2. Details of Partners/Directors of the Firm/Company. Partnership deed or self affidavit on Rs.
300/- stamp paper for proprietorship as the case may be.
3. Form G for registration of partnership firm & Certificate of incorporation for company
registration (if applicable)
4. Copy of power of attorney or signing authority on bidder’s letterhead as the case may be.
5. PF registration along with proof of last challan etc. PF No. must be online active
6. The Bidder should have to submit copy of PAN card.
7. Financial capability (Copy of self attested IT returns of Last three financial years and
self attested audited balance sheets & profit / loss statements of last three financial
8. Payment of Tender fee and EMD.
Tender Fee plus GST & EMD should be paid only by on line payment mode(RTGS
9. Latest Bank Solvency of the amount which is 20% of the total estimated cost of the tender
of schedule bank.
10. Experience Certificate of work carried out (Submit Work Order with Form-3A) as above
11. Tender (Tech. bid & price bid) shall be received online only.
Seal and Signature of Contract Page 6 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
12. Registration class approved GETCO: -
13. Electrical contractor license copy.
14. Any other documents required for particular and specific work.
Note: Above technical criteria is for technical scrutiny after opening the technical bid. However the GETCO
reserves the right to award the work to one or more bidders, considering their technical and financial
capacity OR to reject any or all tenders or accept any tender without assigning any reason thereof.
I have read the terms & conditions of contract and abide by the same in all respect.
Seal and Signature of Contract
Seal and Signature of Contract Page 7 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
1. The Scope of the proposal shall be on the basis of a single Bidder’s responsibility for a particular line
completely covering Conductor replacement with Hardware & SRI of 66KV Reladi Anjar Tower
line (on 132KV Tower) under Bhuj AM Division under Anjar AM Circle (Work approved
under R&M 2026-27) on /Tower specified under the accompanying Technical Specifications. It will
include among others as specified therein the following. a) Detailed Engineering. b) Insurance,
Dismantling, Stringing, earth wire replacement of line and tower location.
2 No deviation whatsoever to certain conditions of the bidding documents permitted by the Owner and
therefore, the Bidders are advised that while making Bid Proposals and quoting prices these conditions
may appropriately be taken into consideration.
3 Bids not covering the above-cited entire scope of works may be treated as incomplete and will be rejected.
4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, Technical Data Sheets
and specified elsewhere. The Qualifying Data should be filled in the required schedule of Bid Proposal
5 This specification covers the detailing like Dismantling, Stringing, & commissioning, strengthening and
handing over in ready condition to GETCO complete including fixing of accessories on line.
6 The above work shall be done as per GETCO’s approved drawing/layout.
7 Necessary field quality plan of GETCO shall be implemented and necessary documentation shall
also be maintained as per GETCO’s norms and instruction of EIC. If required field quality plan
shall be available at field offices.
8 During the above subjected work on subjected lines all safety norms & safety check list shall be
followed. Necessary check list will be available at our field office.
9 Successful bidder has to appoint skilled well experienced site Engineer to maintained site
register & FQP as per ISO.
10 All work should be done accordingly to ISO & FQP and all require documents including Filled
FQP, testing results etc. should be submitted while handing over the completed work.
11 The quantity mentioned in price bid is tentative and may vary in actual work order.
The scope shall include Dismantling of conductor / earthwire, re-stringing of conductor / earthwire on
Towers / including, laying, jointing, tensioning, clamping with accessories, jumpering & sister wire, earth
bond etc. with required tree cutting.
Seal and Signature of Contract Page 8 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
1. The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of
applicable laws pertaining to the safety of workmen, employees, plant and equipment as may be
prescribed from time to time without any demur, protest or contest or reservations. In case of any
discrepancy between statutory requirement and GETCO Safety Rules referred above, the latter shall
be binding on the Contractor unless the statutory provisions are more stringent.
1. In case if any safety related fatal Elect. / Mech. accident occurred to any employee of
agency or outsider due to negligence or non-compliance of GETCO safety norms then in
addition to the compensation and liability as per statutory requirement, contractor /
agency shall be penalized as under:
Sr. No Amount of Contract in Rs. Penalty amount per person
Rs.5000/- plus APPLICABLE
TAXES (IF ANY) as applicable
Rs.25000/- plus APPLICABLE
2 Above1 Lac to 10 Lacs
TAXES (IF ANY) as applicable
Rs.100,000/- plus APPLICABLE
3 10 to 100 Lacs
TAXES (IF ANY) as applicable
1.0 % plus APPLICABLE TAXES
(IF ANY) as applicable
1. The contractor shall inform concerned Ex. Engineer Const/TR in writing within
hours of fatal/Non-fatal accident occurred to human being.
2. The GETCO investigating officer findings in to accident shall be final and binding to the
contractor /Agency.
3. Safety Requirement:
i) Kick off Meeting exclusively for safety shall be done in each contract in presence of contractor’s
site in charge and supervisor. Safety document shall be handed over and vital safety norms and
key points of safety related to project shall be explained and recorded for commitment by
erection contractor. Such records are mandatory for clearing first erection bill.
ii) During site visit by GETCO official of Executive Engineer and above rank, the following checks
during execution of work shall be covered.
I. Safety equipment available and utilize.
(b) Safety belt.
(c) Safety shoes.
(d) Live line Voltage detector
II. Safety procedure adopted.
(a) Permit to work
(b) Earthing at the place of work.
(c) Adequate supervision.
III. T & P physical Check. (Healthiness and Quality)
Seal and Signature of Contract Page 9 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
(b) Wire rope and sling.
(c) Earthing rod
IV. If above-mentioned safety requirements found violated in any of the above three
conditions shall attract penalty of Rs.1000/- plus APPLICABLE TAXES (IF ANY) as
applicable per occasion. (Max.Rs.3000/--for violation of three conditions)
V. During subsequent visit, if violation is found, then double penalty plus
APPLICABLE TAXES (IF ANY) as applicable shall be deducted from the bill of the
Contractor/Agency.
4. The contractor will have to give indemnity bond & safety cum indemnity on stamp paper of Rs.
300/- to GETCO against any possible claim of compensation for damage to contractor’s equipment
or staff or any of third parties during the execution of work.
WORK & SAFETY REGULATIONS
1. The contractor shall ensure proper safety of all the workmen, materials, equipment & plant &
belonging to him or to GETCO or to others, working at the site. The contractor shall also be
responsible for provision of all safety notices and safety equipment required both by the relevant
legislations and Engineer, as he may deem necessary.
2. Contractor has to provide ISI marked ELCB / MCB having sufficient capacity of standard make at
point of supply.
3. All equipment used in construction and erection by contractor shall meet Indian/International
Standards and where such standards do not exist, the contractor shall ensure these to be absolutely
safe. All equipment shall be strictly operated and maintained by the contractor in accordance with
manufacturer’s operation manual and safety instructions and as per guidelines/ rules of GETCO in
4. Periodical examinations and all tests for all lifting/ hoisting equipment & tackles shall be carried –
out in accordance with the relevant provisions of Factories Act 1948, Indian Electricity Act 1910 and
associated Laws/Rules in force from time to time. A register of such examinations and tests shall be
properly maintained by the contractor and will be promptly produces as and when desired by
Engineer or by the person authorized.
5. The contractor shall provide suitable safety equipment of prescribed standard to all employees and
workmen according to the need.
6. The contractor shall provide safe working conditions to all workmen and employees at the site
including safe means of access, railings, stairs, ladders, scaffoldings etc. the scaffoldings shall be
erected under the control and supervision of an experienced and competent person. The contractor
only shall use good and standard quality of material.
7. The contractor shall not interfere or disturb electric fuses, wiring and other electrical equipment
belonging to the owner / other contractors under any circumstances, whatsoever, unless expressly
permitted in writing to handle such fuses, wiring or electrical equipment.
8. Before the contractor connects any electrical appliances to any plug or socket belonging to the other
contractor or owner, he shall:
a. Satisfy the Engineer that the appliance is in good working condition;
b. Inform the Engineer of the max. current rating & voltage of the appliances;
c. Obtain permission of the Engineer detailing the sockets to which the appliances may be
9. The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug
b. The appliance is fitted with a suitable cable having two earth conductors, ones of which shall
be an earthed metal sheath surrounding the cores.
Seal and Signature of Contract Page 10 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
10. No electric cable in use by the contractor/ Owner will be disturbed without prior permission. No
weight of any description will be imposed on any cable and no ladder or similar equipment will rest
against or attached to it.
11. No repair work shall be carried out on any live equipment. The equipment must be declared safe by
the Engineer and a permit to work shall be issued by the Engineer before any repair work is carried
out by the contractor. While working on electric lines/ equipment, whether live or dead, suitable
type and sufficiently quantity of tools will have to he provided by the contractor to electricians/
workmen/ officers.
12. In case any accident occurs during the construction/ erection or other associated activities
undertaken by the contractor thereby causing any minor or major fatal injury to his employees due
to any reason, whatsoever, it shall be the responsibility of the contractor provide medical facility /
treatment & to promptly inform the same to the Engineer in prescribed form and to also to all the
authorities envisaged under the applicable laws.
13. The Engineer shall have the right at his sole discretion to stop the work, if in his opinion the work is
being carried out in such a way that it may cause accidents and endanger the safety of the persons
and/or property and/or equipment. In such cases, the contractor shall be informed in writing about
the nature of hazards and possible injury/ accident and he shall comply to remove shortcomings
promptly. The contractor after stopping the specific work can, if felt necessary, appeal against the
order of stoppage of work to the Engineer within 3 days of such stoppage of work and decision of
the Engineer in this respect shall be conclusive and binding on the contractor.
14. The contractor shall not be entitled for any damages/ compensation for stoppage of work due to
safety reasons and the period of such stoppage of work will not be taken as an extension of time for
completion of work and will not be the ground for waiver of levy of liquidated damages.
15. it is mandatory for the contractor to observe during the execution of the works, requirements of
safety rules which would generally include but not limited to following;
a. Each employee shall be provided with initial indoctrination regarding safety by the
contractor, so as to enable him to conduct his work in a safe manner.
b. No employee shall be given a new assignment of work unfamiliar to him without proper
introduction as to the hazards incident thereto, both himself & his fellow employees.
c. Employee must not leave naked fires unattended, smoking shall not be permitted around
fire prone areas and adequate firefighting equipment shall be provided at crucial location.
d. There shall be a suitable arrangement at every work site for rendering prompt and sufficient
first aid to the injured.
e. Requirements of ventilation in underwater working to licensed and experienced divers, use of
gumboots for working in slushy or in inundated conditions are essential requirements to be
16. The contractor shall follow and comply with all GETCO safety Rules, relevant provisions of
applicable laws pertaining to the safety of workmen, employees, plant and equipment as may be
prescribed from time to time without any demur, protest or contest or reservations. In case of any
discrepancy between statutory requirement and GETCO safety rules referred above the latter shall
be binding on the contractor unless the statutory provisions are more stringent.
a. Fatal injury or accident Rs. 1,00,000/- per These are applicable
Causing death person plus APPLICABLE TAXES (IF ANY) as applicable
b. Major injuries or accident causing Rs. 20,000/- injury to any
25% or more permanent disablement per person person,
To workmen or employees plus APPLICABLE TAXES (IF ANY) as applicable
Seal and Signature of Contract Page 11 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Permanent disablement shall have same meaning as indicated in workmen’s compensation Act. The
compensation mentioned above shall be in addition to the compensation payable to the workmen/
employees under the relevant provisions of the laws as applicable from time to time. In case the
owner is made to pay such compensation then the contractor is liable to reimburse the owner such
amount in addition to the compensation indicated above.
OUR ENDEVOUR - Safety a habit
To create environment where Business Confidence is built through Best Business Practices and is fostered in an
atmosphere of trust and respect between providers of goods and services and their users for the ultimate benefit of
society a the nation, safety guidelines are agreed upon by the agency as under.
Safety is our prime concern and zero accident is our goal. In order to prevent the accident, while execution of
works in indoor and outdoor systems of GETCO, the following guideline and preventive measures are identified.
Indoor safety precaution Outdoor safety precaution
The method of work required T&P and Man power The method of work required T&P and Man
should be discussed between GETCO supervisor, power should be discussed between GETCO
contractor’s supervisor and gang leaders. supervisor, contractor’s supervisor and gang
Prior to execution of work a joint survey Must be Prior to execution of work a joint survey
conducted by GETCO supervisor and contractor’s mustbeconductedbyGETCOsupervisor,contract
supervisor for risk assessment. or’ssupervisorandDISCOMlinemaninordertoide
• Clearly identify the work location, to ntifythefollowing:
distinguish between the equipment that is a. HT/LT line or tap line crossing under
dead and other equipment/part that may Each span of line of the work.
be live. b. Isolation point of each line
• Disconnect equipment from supply. crossing.
• Protect against other live parts. c. Each line crossing & isolation point
under each span must be discussed and
• Take special precautions when close to
noted in maintenance register with
bare conductors/ Busbar.
Seal and Signature of Contract Page 12 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Following safety guidelines are mandatory Contractor’s supervisor and GETCO
For all contractors operating in GETCO premises for Supervisor must ensure all isolations physically
Electrical, non-electrical & civil works. with adequate earthing technically prior to give
1. The contractors must provide advance planning of clearance to gang leader for taking up job.
work to concerned in-charge of substation in
writing. While execution of stringing work, the identified
2. Before starting any work whether switchyard, line crossing must be isolated /de-energized and
“permit to allow to work” must be taken from control written clearance should be obtained from
room in-charge. concerned DISCOM supervisor.
3. Utilizing Electrical / non-electrical equipments, The isolation of Tap line must be physically
safety rules must be implemented. seen and verified by Contractor and GETCO
4. If the work is to be carried out on Sunday or public supervisor.
holiday, the necessary permission must be taken in At D.O. fuse junction contractors person should
advance, requesting in writing. be posted to ensure that no person restore
5. Unwanted person including children of labours will D.O. supply while work is under execution
not be allowed at working site/ in the switchyard and Contractor’s supervisor must ensure that
in the prohibited area. concern officer take LCP for EHV line and
6. Any electrical work or electrical connections to power line crossing.
equipment for any other work must be carried out by
electrician/wiremen with adequate size of
wire through MCB as per I.E. Rule.
- Live penal area / bus bar must be isolated and
sealed / bifurcated with red colour tape for visible
- Display Board must hang on LCP panel.
- Transformer must be switched off
whenever and wherever contractor and line workers are not
satisfied with isolation, earthing or any equipment
performance of GETCO, it will be pointed out and work
shall begin only after resolution. Contractor shall not take
up job in absence of GETCO authorized person. All wire
temporary connection & material whenever erection activity
has any connection and disconnection work of bus bar,
All workers / labour of contractor & supervisors must use All workers / labour of contractor & supervisors must
personal protective equipment (PPE) during the work like use personal protective equipment (PPE) during the
gloves, safety belt, Safety shoes, Helmet, earthing rods, work like gloves, safety belt, Safety shoes, Helmet,
etc, duly approved by GETCO. earthing rods, Live line detector etc, duly approved
The local earthing must be done at the place of work The local earthing must be done at the place of work
before execution of any work. before execution of any work.
11kVbreakerinpanel must be switched off and racked out Circuit breaker opening is not an isolation and
only after ensuring no voltage in breaker and without door isolator on either side must be opened. No work
opening. during rains and cloudy weather condition.
Seal and Signature of Contract Page 13 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Transmission line activities.
1) Used of Voltage detector to
2) Earthing at three point, local, left &
right side of bus bar / string bus.
3) Match line colour code with colour of
Local earthing of electrical equipments like filter M/c,
welding machine, testing kits etc. is must.
Crane shall only be used for material handling and
erection. Working platform shall only be used for
work in switchyard.
GENERAL COMMERCIAL CONDITIONS
The Gujarat Energy Transmission Corporation Ltd., Anjar hereinafter called ‘GETCO’/ ‘OWNER’
intends to receive bids for Conductor replacement with Hardware & SRI of 66KV Reladi Anjar
Tower line (on 132KV Tower) under Bhuj AM Division under Anjar AM Circle (Work
approved under R&M 2026-27) detailed in the accompanying specifications in accordance with
Terms and Conditions herein. The bids shall be prepared and furnished as per these instructions.
1. The validity of tender is 180 days from the date of opening of technical bid
2. Earnest Money Deposit :
A. Bidders are requested to pay an earnest money deposit (1% of estimated labour cost)
by ON LINE PAYMENT MODE (RTGS/NEFT) ONLY for the amount as specified in the
tender notice. Payment of EMD in form of Cheque or any other form shall not be
B. The EMD shall be submitted along with submission of Technical bid only.
C. Tenders no accompanied by EMD shall be rejected.
D. If during the tender validity period, i.e. 180 days, the tenderer withdraws his tender, the
EMD shall be forfeited and the tenderer may be disqualified from tendering for future
works of GETCO.
E. The EMD will be returned promptly to the unsuccessful tenderer. The EMD will be
returned to the successful tenderer after he furnishes the Security Deposit for
performance and duly enters into the contract. If he fails to furnish the SD or to execute
the contract for the work offered to him, his EMD shall be forfeited and the tenderer
may be disqualified from tendering for further works for GETCO.
3. All commercial terms and conditions except rates shall be indicated in the technical &
commercial bid only.
4. The tenderers shall specifically note that the Tenders are invited on percentage basis only.
5. The tenderers will ensure submission of the Tenders duly filled in before the due date and
Seal and Signature of Contract Page 14 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
1. Security deposit: -
The contractor will have to pay the Security Deposit at 5% of the order value by demand draft / in
the name of ‘GUJARAT ENERGY TRANSMISSION CORPORATION LTD/ PAYABLE AT ANJAR, A/c.
name of bidder’ upon placement of the LOI within 15 days. Alternatively you may pay the entire S.D.
in the form of B.G. in case S.D value is more than Rs. one lakh as per approved format of the GETCO
issued by only Nationalized/Scheduled Bank as per List attached herewith. The security deposit will
be refunded only after the completion of guarantee period of 1 year of work done or finalization of
final bill whichever is later.
(A) Guarantees issued by following Banks will be accepted as SD on payment basis.
1. All National Banks.
(B) Guarantees issued by following Banks will be accepted as SD for the period up to March
The validity cut-off date in GR is with respect to date of issue of Bank Guarantee irrespective
of date of termination of Bank Guarantee.
2. AU Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Dhanlaxmi Bank
9. Equitas Small Finance Bank
10. FEDERAL Bank
16. IndusInd Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
23. South Indian Bank
24. Standard Chartered Bank
25. Tamilnadu Mercantile Bank
26. Ujjivan Small Finance Bank
28. Ahmedabad Mercantile Co-op. Bank
29. Nutan Nagarik Sahakari Bank Ltd.
30. Rajkot Nagarik Sahakari Bank Ltd.
31. Saraswat Co-operative Bank Ltd.
Seal and Signature of Contract Page 15 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
32. SBPP Co-operative Bank Ltd.
33. SVC Co-operative Bank LTD.
34. The Cosmo Co-op Bank Ltd.
35. The Gujarat State Co-operative Bank
36. The Surat District Co-operative Bank
37. The Surat People’s Co-op. Bank Ltd.
38. The Baroda Central Co-operative Bank
39. The Panchmahal District Co-operative Bank
40. The Kalupur Commercial Co-op. Bank
41. The Rajkot Commercial Co-operative Bank
42. The Banaskantha Mercanttile Co-op. Bank
43. Gujarat Gramin Bank
Bank Guarantee of other than above mentioned banks towards EMD, Performance
Bank Guarantee for Supply, Erection & Warranty will not be acceptable
No interest will be allowed on amount of Security deposit.
The Security Deposit- total shall be kept deposited up to completion of GUARANTEE PERIOD OR
finalization of final bill whichever is later
The same shall be return on receipt of N.O.C. by the concerned AM division for billing & payment.
This security deposit is for the performance of contract and the same is liable to be forfeited by the in
event of non-fulfillment of the term and conditions of this contract by the contractor.
Corporate Guarantees are not admissible.
2. Contract Period :- The time allowed for completion the work is 03 (Three) months from the date
of the commencement of the work, failing which penalty ½% per week or part thereof plus
applicable taxes (if any)on delayed portion of work and / or supply value subject to ceiling of
10% of the total contract value will be imposed.
3. The time limit for the work may be reduced and contractor should make all his efforts to complete
the work within stipulated time limit as may be given by the Engineer in charge depending upon
emergency of work, GETCO reserves the right to reduce the time limit without giving any notice.
4. TAXES AND DUTIES
1. GOODS AND SERVICE TAX (CST): CST and cess as applicable shall be payable/
receivable as mentioned in clause no.33 of GCC supra
2. The prices quoted shall be all inclusive of freight, transportation, loading, —unloading stacking at
site of materials supplied by Contractor as well as owner supplied item if any.
3. No extra payment toward any type of templates and erection tools /materials will be made.
4. Statutory Variations:
Any statutory increase or decrease in the taxes and duties including GST and Cess as applicable or
in the event of introduction of new tax]cess or cessation of existing tax/cess subsequent to
suppliers offer if it takes place within the original contractual delivery date will be to COMPANY's
account subject to the claim being supported by documentary evidence. However, if any decrease
takes place after the contractual delivery date, the advantage will have to be passed on to
Seal and Signature of Contract Page 16 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Statutory Variation clause will not be applicable in case of Supplier / Contractor has opted for
Composition Scheme under CST.
Goods and Service Tax (GST):
1. The F.O.R. Destination prices are excluding GST at the rate of 9% CGST plus 9% SGST or 18%
IGST, under the GST Law or as applicable to Works Contract Services from time to time which will
be paid extra on a given taxable goods and/or services within the original contractual delivery period.
The amount and % of CST and Cess should clearly be indicated separately. GST/Cess means all
applicable Tax/Cess under GST Laws. (GST Laws means IGST Act, GST(Compensation to the State
for Loss of Revenue) Act, CGST Act, UTGST Act and SGSCT Act,2017 and all related ancillary
2. You shall have to submit a C.A Certificate & duly authorized Signatory of successful bidder,
certifying that you have not claimed Refund of any applicable GST and Cess, charged to
COMPANY or shall not claim any such Refund, on a future date, from the concerned Authorities
and if, any Refund, in respect of such GST and Cess, is claimed by you, it will be immediately
passed on to the COMPANY, without COMPANY making any specific Claim, for the same, either
from the Department or from you.
3 The offers having price INCLUSIVE OF CST is likely to be rejected if the rate of CST is not
mentioned clearly.
4 Contractor should charge GST in Invoice at the rate as agreed to / mentioned in acceptance of tender
only and any deviation in the same shall not be accepted. Further, any additional liability of GST
(later on due to wrong mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.) over and
above as charged in the invoice shall be borne by the Contractor. However, any refund received by
the contractor on account of GST charged from the company; such refund shall have to be passed on
to the company, along with interest if any. Such refund along with interest needs to be passed on
suo-moto by the supplier / contractor.
5 Further, the Company has a right to recover the amount of CST along with penal interest at the rate
of 15% per annum or any other amount charged by CST Dept. whichever is higher if GST charged is
not paid / short paid to the government or fail to upload the details or uploads inaccurate particulars
on GSTIN portal by the Contractor within the stipulated time limit.
6 In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision of
GETCO's statutory variation clause shall apply.
7 INPUT TAX CREDIT BENEFIT In the event of any statutory increase in the rate of Input Tax
Credit and / or due to inclusion of any other additional item of their inputs / input services under the
ambit of the Input Tax Credit provisions under the CST Act, subsequent to the date of submission of
the offer, the same should be passed on to COMPANY and you should inform such changes to
COMPANY from time to time.
8 CST, other taxes and other levies and duties including custom duty solely in respect of the
transaction between the owner and the contractor under this contract, if any, shall be included in the
bid price. These shall also be indicated separately wherever applicable as mentioned in the Tender.
9 As regards the income Tax, surcharge on income tax and any other corporate tax, including GST if
any the owner shall not bear any tax liability whatsoever. The bidder shall be liable and responsible
for payment of such taxes as attracted under the provisions of the law.
10 Notwithstanding the tax liabilities as per the sub-clause 35.9 above, the owner shall have the right to
make deduction at source from the amounts payable to the contractor in respect of Income Tax (on
the cost of items of supply included in the works contract) as may be mandatory in terms of the law.
The owner shall not bear any liability in this regard but shall issue necessary certificate in respect of
such deduction made.
Seal and Signature of Contract Page 17 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
1 1 Whenever concessional rate of GST is indicated by the bidders; it shall be confirmed
whether any increase in the rates that becomes applicable during the performance of the
contract would be absorbed by the supplier. Bidder shall note that in case of absence of such
confirmation; the tenders will be evaluated taking into account the maximum rate of GST
12 In case any tax or duty is newly introduced by the Government applicable for this contract with
effect from the next day of the date submission of the bid and if the contractor is required to pay
additional tax or duty, then the owner shall reimburse the contractor the additional tax or duty so
paid by the contractor against submission by the contractor of documentary evidence to the
satisfaction of the owner. This provision will not be applicable to transaction between the contractor
and his sub-suppliers, sub-contractors for raw materials etc and will be applicable only to the direct
transactions between the contractors and owner. Besides the said statutory variation, no other
statutory variation shall be payable by the owner.
13 The owner's liability for all taxes and duties including CST under the contract shall be limited to
those indicated by the Bidder in the Bid Proposal Sheets, subject to the statutory variations and
variations as per Clause No. 35.4.
14 If the cost to the Contractor during the performance of the 'Contract' shall be increased or reduced by
reasons of the making, passing or promulgation of any law after the date of submission of bid or by
any order, regulation or bye-law having the force of law, the amount of such increase or reduction
shall be added to or deducted from the "Contract Price" as the case may be for direct transactions
between contactor & owner. It is the Bidders responsibility to furnish details of taxes, duties, levies
etc. applicable as on the date of submission of the bid.
15 No claim for any increase towards the statutory variation regarding enhancement of existing tax or
duty or introduction of a new tax or duty applicable shall be entertained by the Owner during the
extended period of contract, if any, provided the extension of the contract is required by causes
attributable to the contractor. However, the decrease in any taxes/duties shall be passed on to
16 The provision of statutory variation regarding enhancement of existing tax or duty or introduction
of a new tax or duty will be applicable only to the direct transaction between the contractor and the
17 Before quoting, the bidder may ascertain from the concerned tax authorities of Government for the
applicability of Entry Tax, GST etc. in respect of this work and include the same in the quoted price.
No separate claim in this regard will be entertained by the Owner, as it is the responsibility of the
Bidder to pay all these taxes.
18 Final bill shall be passed & paid only if contractor has duly discharged its GST liability
related to the contract and submit C.A. certificate and under taking.
Income-tax at source at the prevailing rate will be deducted from bills in accordance with the
provision of Income-Tax Laws and to that effect a certificate will be issued to you.
As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply, erection items for
supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey projects
and civil works.
Seal and Signature of Contract Page 18 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Contractor shall get registered under Welfare Cess Act before commencement of work. Office
of the Factory Inspector is authorized at present as a registering authority.
GETCO shall pay the welfare cess by way of reimbursing to contractors on production of
documentary evidence of payment.
The contracts for which supply or part supply of material are in the scope of GETCO, then
contractors shall deposit welfare cess on estimated cost of supplied items to GETCO on
progressive basis of utilization. As this part of welfare cess is on GETCO account, the same
shall be reimbursed to the contractor on receipt of request letter along with documentary
evidence of payment. For calculation of welfare cess on supply part, valuation as per MR shall
be taken and informed to the contractor for payment. This will be over and above the A/T value.
The modality of payment/ reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor/ bidder will get them registered under Welfare Cess Act and
submit the documentary evidence to the concern office.
Before release of payment of first R.A.Bill, the contractor has to submit the documentary
evidence of registration. Only thereafter, the bill will be processed for payment.
Before release of payment of subsequent R.A.Bills, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A.Bill.
Before release of payment of Final Bill, the contractor has to submit the documentary evidence
of payment of welfare cess of previous R.A.Bill as well as of this final bill.
If the R.A.Bill happens to be first and final bill, then before release of payment, contractor has
to submit documentary evidence of registration under Welfare Cess Act and evidence of
payment of welfare cess.
The welfare cess shall be reimbursed to the contractor on submission of copy of documentary
evidence of payment by observing due formalities.
5. STATUTORY VARIATION:
Any statutory increase or decrease in the taxes and duties including GST and Cess as
applicable or in the event of introduction of new tax/cess or cessation of existing tax/cess
subsequent to suppliers offer, if it takes place within the original contractual delivery date will
be to GETCO’s account subject to the claim being supported by documentary evidence.
However, if any decrease takes place after the contractual delivery date, the advantage will
have to be passed on to GETCO.
Statutory Variation clause will not be applicable in case of Supplier /Contractor has opted for
Composition Scheme under GST.
13. The contractor will have to give indemnity bond on Non-judicial Stamp paper of value Rs. 300/-to
GETCO for material as per attached format. The cost of stamp paper will be born by the contractor.
14. Also the successful bidder will have to execute Agreement on stamp paper of value Rs.300/- at our
Circle office Anjar before commencement of works as per GETCO’s prescribed Performa. The cost of
stamp paper will be born by the contractor.
15. The contractor will have to give safety cum indemnity on Non-judicial Stamp paper of value Rs. 300/-
to GETCO against any possible claim of compensation for damage to contractor’s staff or any of third
party during the execution of work. The cost of stamp paper will be born by the contractor.
Seal and Signature of Contract Page 19 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
16. Guarantee: - It is the responsibility of the contractor to handover the complete work free of all
defects. If within a period of One (1) year from the date of handing over the work it is noticed that
any defects occurs due to bad workmanship, it is the duty of the contractor to rectify / replace the
same at his own cost. If within seven days from the date of receipt of such notice, the contractor does
not take up the work, same will be carried out at his risk and cost.
18. 10% retention money will be deducted from each R.A. Bills against material issued to contractor.
19. 10% amount of bill will be retained from each RA bill for the work executed after the scheduled date
of completion and on finalization of time limit extension by competent authority; this amount will be
released after deducting amount towards the time limit penalty if any.
20. As regard damage the materials, equipment and worker of the contractor, he himself will be
responsible. If there is any compensation to be paid in respect of “WORKMAN” compensation act of
any other statutory provisions, the same will have to be paid by the contractor direct. If he thinks fit
he may take necessary insurance cover, at his cost.
21. The quantum of the work as mentioned in estimate/ schedule –‘B’ is tentative and it can be varied or
differed as per site condition. The payment shall be made only on actual work executed or order
quantity, whichever is less.
22. The tenderer will be abided by and fulfill all the terms and provisions of the “Tender & Contract” for
works as applicable and incase of any default there to the GETCO shall forfeit the S.D. or any other
action as may be decided by Superintending Engineer (TR), GETCO, Anjar.
23. The cost of damages, if any will be recovered from the Contractor’s bill. The assessment of which will
be done by field Engineer at his sole discretion and his decision shall be binding to the contractor and
shall be considered as final and unchallengeable.
24. GETCO shall deduct the Income-Tax and other taxes as per prevailing rules from each and every bill.
25. No part rate or reduced rate shall be allowed in final bill.
26. The contractor has to follow all labour laws, safety rules and regulations. The GETCO does not take
any responsibility in case of accident or injury to the workers. The safety/ security of men, materials
and equipments shall be sole responsibility of the contractor.
27. The compliances of all Central/ State Govt. rules, safety and insurance rules etc. and that of local
body, is a must condition for the agency.
28. The Gujarat Energy Transmission Corporation Limited does not bind itself to accept the lowest or
any tender. GETCO reserves the right to reject any or all tender without signing any reasons
29. The erection work should be commenced immediately from the date of receipt of instructions from
office and should be completed within thereafter.
30. The tender includes all minor accessories and items of work which are not have been specifically
mentioned in the specification schedule etc. but are essential for completion of work. The contractor
will not be eligible for any extra payment in respect of such minor accessories and items of work.
31. Tenderer will be qualified only who have submitted all the required documents as mentioned in
32. No higher rate or revised rate will be applicable for the work, if work is held up/ closed due to
whatever so reasons.
33. GETCO will not pay any idle charge for any site conditions or any circumstances.
34. In case of any dispute/ doubt, the decision of Superintending Engineer (TR), GETCO, Anjar. shall be
unchallengeable, final and binding to the contractor.
35. The contractor has to remain in close day to day contact with Engineer in charge of work i.e.DE S/s
/Line concern who will issue detailed instruction for the commencement of the work.
36. Contractor will abide by and fulfill all the terms and conditions and general terms and condition of
the contract for works available in the office.
37. All other general terms and conditions as prevailing in the GETCO shall be applicable to the contract.
Seal and Signature of Contract Page 20 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
38. The contractor will have to complete entire job as per directive and instruction of Engineer in charge.
If he fails to do so entire work will be carried out at contractor’s risk and cost.
39. The contractor must engage sufficient knowledgeable persons round the clock, exclusively for oil
filter machine provided by GETCO for oil filtration work. No loss of oil should occur and in case if
occurs; its cost will be recovered from contractor’s bill. The contractor has to apply sufficient nos. of
cycles for oil filtration works as decided by the Engineer in charge.
40. The tender shall be issued to only the experienced contractor who has completed such job of similar
nature and magnitude satisfactorily in time. However, filling of on line tender, does not qualifies the
tenderer to offer the bid.
41. Tender offer without payment of EMD required certificate, documents, Etc. required for execution of
job will be out rightly rejected without assigning any reason thereof and decision of Superintending
Engineer (TR), GETCO, Anjar will be final and unchallengeable.
42. The Contractor will be governed by The GETCO’s general conditions of works contract. The Booklet
will be available in the concerned office in any working days. In the event of placing order, the
contractor will have to sign this booklet along with other document and agreement. All the usual
terms and conditions of the GETCO, through the same might have not been mentioned in this
specification or contractor booklet will applicable to this contract, and the decision of the
Superintending Engineer shall be binding on the contractor.
43. After completion of the work, all the surplus materials issued by the GETCO shall be returned by you
to the respective center of the GETCO as per instruction of Engineer in charge at your cost.
44. Specification in any items mentioned in tender are subject to change without any prior notice and
binding to the contractor.
45. If the work is required to be carried out during fix outage then the contractor has to deploy adequate
man power, material, tools etc. well in advance and has to complete the entire work during this
specific outage period only, failing to which GETCO shall be at liberally to deduct the amount of
revenue loss due to prolong outage.
46. If required by GETCO you shall have to provide free to and fro traveling facility to our Junior
Engineer or Technical staff for the work.
47. The contractor shall not refuse to execute the work order at any time and it will be his sole
responsibility to execute and complete this work as per the instruction of Engineer in charge.
48. For shortages of any materials issued by the GETCO for the work, recovery shall be made from you,
on the basis of prices of the materials (prevailing on the date of settlement of materials account) plus
15% supervision charges.
49. No subcontractor, Power of Attorney shall be allowed without prior approval of competent authority.
50. All the materials issued by GETCO shall be transported to the work site on same day and to be
preserved in safe custody failing to which GETCO shall initiate legal action if required. Similarly as
per instruction of Engineer in charge, you have to credit the material at GETCO store without any loss
of time failing to which GETCO shall initiate legal action if required.
51. No tools, tackles, manpower, crane facilities etc. will be provided by the GETCO.
52. The contractor has to submit the list of tools, tackles, equipments with him along with his tender
offer. The tender without this list and other required documents (as mentioned above herein the
tender) should be rejected out rightly.
53. The bidder shall specifically note that GETCO will not pay any extra amount towards any type of
claim except for the description indicated in Schedule – ‘B’. The party has to carry out all other/
additional required activities/ works as directed by Engineer in charge which is not mentioned in
Schedule but required to be completed as per site condition and for this work no extra payment shall
be made by GETCO.
Seal and Signature of Contract Page 21 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
a) The interpretation of specifications doubts etc.:- In case of any doubts about what is
mentioned in specification or schedule or elsewhere, the tenderer should get all doubts
cleared from the Department in writing and in advance of filling in the Tender. In case of
difference of opinion about interpretation of specification etc the decision of
Superintending Engineer, Transmission Circle, GETCO, and Anjar l will be final and shall be
binding to the contractor.
b) Accounts of Materials issued:- The contractor shall have to maintain accurate day to day
and item wise account of use of issued materials which shall be got checked from time to
time by the representative of the GETCO. The contractor will be responsible for custody and
preserving the issued materials till the work is handed over by the contractor after
c) The contractor has to maintain site register, covering all the daily details of material receipt
and utilization, progress of work etc. This register shall be checked and signed by Engineer
in charge and Executive Engineer during the site visit. Any bill without site register shall not
55. The contractor shall be responsible for breakages, losses and theft of material during transit
or erection after the materials issued from the stores till the completion of work and is
taken over by the GETCO.
56. The contractor will be responsible for the loss, distribution of deterioration of the materials,
stores or articles supplied to him by the GETCO, even if such a loss distribution or
deterioration has occurred under any circumstances whatsoever beyond his control as if
the materials, stores or articles so supplied were his property.
57. The contractor shall co-operate with the GETCO in recording measurement etc. as
expeditiously as possible and he shall fulfill all the requirements which are necessary to
finalize the accounts on the basis of its records and pay him such amount as if found due to
him together with the amount of security deposit. If any remaining payable to him after
deduction there from the amount due by him to the GETCO. The GETCO shall not entertain
further claim from thereafter.
58. The competent authority can delete any item in schedule of the tender, if he feels that the
rate quoted by the contractor for that item is abnormally high when compared to the
estimated rates.
59. Delivery of Material: - All material/ equipment required for this work as per schedule shall
be delivered at any store centers of GETCO jurisdiction and contractor has to take delivery
from these stores or at his own cost only.
60. You will ensure that completion of erection work i.e. all works connected with substation
having been completed correctly as per Indian Electricity Rules & procedure. Any extra cost
involved due to incompleteness of work or bad workmanship found out Subsequently shall
be set right forth with by you at your own cost.
61. Billing and Payment Terms
(a) The contractor shall have to submit the RA bill of order to the concerned Deputy
Engineer of sub-division of concerned division for payment once in a month period.
(b) 90% payment of amount claimed covering various activities such as excavation,
foundation, erection, earthing, stringing of bus bar and earth wire including
insulator hoisting works against R.A. bills duly certified by EIC within 60 days from
the date of R.A. bill.
Seal and Signature of Contract Page 22 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
(c) Balance 10% of erection value shall be paid within 60 days against completion of
work only after settlement of material account statement of items supplied, used,
erected and successful commissioning of Sub-Station line the same amount will be
release in final bill only and payment will be made only after passing of final bill.
(d) If net payable amount is more than Rs 5.0 Lacs, payment will be released from circle
office/corporate office.
(e) The payment will be released within 60 days. However, in case of any delay due to
any eventuality no interest charges shall be paid.
(f) All the bills in accordance with the above clauses must be submitted with the
following information:
1) Item wise work done during billing period.
2) Item wise cumulative work done.
3) Account for material consumed and balance stock.
4) For non-submission or part submission of above information, an
additional 5% amount of the respective RA bill shall be withheld and shall
only be released at the time of final bill.
(g) Any outstanding recoveries of GETCO for any other than this transaction or
anywhere done in GETCO can be recovered from this contractor’s/ supplier’s
payment which is authentically approved by competent authority.
62. PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
The Contractor shall be responsible for any damage resulting from his operations. He shall also be
responsible for protection of all persons including members of public and employees of the Owner
and the employees of other Contractors and Sub-Contractors and all public and private property.
63. Quantities given in the Schedule of erection in price Bid are to be executed by the
contractor at the rates accepted by the Board in the A/T. In case of any deviation in tower
quantity / type of tower / length of line, excavation / concreting resulting into an increase
in which event the field officer shall obtain prior approval of the Head Office and excess
quantity shall be paid only at the accepted rate of the A / T. No any Excess work / amount to
be executed without prior approval of competent authority.
64. The erection work beyond contractual ceiling amount shall be done only after approval
from the GETCO authority.
65. CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of the
Contract. Any written order or instruction of the Engineer or his duly authorized representative
shall be communicated to the said authorized resident representative of the Contractor and the
representative shall be available at a stated address for this purpose.
66. CO-OPERATION WITH OTHER CONTRACTORS
Contractor shall co-operate with all other Contractors or tradesmen of the Owner, who may
be performing other works on behalf of the Owner and the workmen who may be employed
by the Owner and doing work in the vicinity of the Works under the Contract. The
Contractor shall also so arrange to perform his work as to minimize, to the maximum extent
possible, interference with the work of other Contractors and their workmen. Any injury or
Seal and Signature of Contract Page 23 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
damage that may be sustained by the employees of the other Contractors and the Owner,
due to the Contractor’s work shall promptly be made good at the Contractor’s own expense.
67. PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over by
the Engineer. No claim will be entertained by the Owner or by the Engineer for any damage or loss
to the Contractor’s works and the Contractor shall be responsible for complete restoration of the
damaged works to original conditions to comply with the specification and drawings.
SPECIAL COMMERCIAL CONDITION FOR TENDERER
1. TAKING DELIVARY AND INSURANCE:-
1.1 The contractor has keep line materials in safe custody and transport to the respective sites
and will be responsible for any damages to or loss of all materials at any stage during
transportation or erection or taking over of the line by GETCO.
1.2 The Contractor has to open site store and ensure for safe custody of all the stored materials
at his own cost.
1.3 The Contractor shall have total responsibility for the entire materials stored loose, semi
assembled and/or erected by him at site in his custody. The Contractor shall make suitable
security arrangements is at own cost to ensure the protection of all materials, equipments
and works from theft, fire pilferage and any other damages and loss, it shall be the
responsibility of the contractor to arrange for security till the works are finally taken over
by the Corporation.
2. STORAGE-CUM-ERECTION-INSURANCE:-
2.1 The contractor shall take suitable storage-cum-erection insurance cover at his cost to the extent of
100% cost of sub-station/line materials, which are required to complete the sub-station /line. Bidder
shall have to take the comprehensive Marine cum Erection (MCE) insurance policy against any loss,
damage, theft, pilferage, fire etc. for the complete period of storage, fire etc. for the complete period of
storage, erection and commissioning up to the time of taking cover of the sub-station/line by GETCO.
The contractor shall deal directly and pursue the claim with the Insurance Company and shall be
responsible in regard to maintenance of all insurance coverage as well as for settlement of claim. The
proof of insurance policy taken by the successful contractor shall be furnished/submitted to Engineer-
in-charge of GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance policy. The
risk shall be covered for lifting of materials from store to final handing over to GETCO. Further
in absence of the above insurance policy, R.A. bill payment will be withheld.
a. In the event of any damage, theft, loss, pilferage, fire etc, Contractor will be
responsible to lodge, pursue and settle all the claims with the insurance company for
all items, materials and the corporation shall be kept informed about it. Contractor
shall replace the lost/damaged materials/items promptly irrespective of the
settlement of the claims by underwriter and ensure that the work progress is as per
agreed schedule. The loss, if any, such replacement will have to be borne by the
contractor and GETCO will not entertain any claim/representation in this regard.
Seal and Signature of Contract Page 24 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
However it will be contractor’s responsibility to insure the entire project till the line
/ sub-station or any other project / works is taken over by the GETCO.
b. The estimated cost of line material for insurance is Rs. 2.22 Crores OR as per
instruction of EIC
3.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to
the Works and obligatory in terms of law to protect his interest and interests of the Owner against
all perils detailed herein. The form and the limit of such insurance as defined herein together with
the under-writer in each case shall be acceptable to the Owner. However, irrespective of such
acceptance, the responsibility to maintain adequate insurance coverage at all time during the period
of Contract shall be of Contractor alone. The Contractor’s failure in this regard shall not relieve him
of any of his contractual responsibilities and obligations. The insurance covers to be taken by the
Contractor shall be in the joint name of the Owner and the Contractor. The Contractor shall,
however, be authorized to deal directly with Insurance Company or Companies and shall be
responsible in regard to maintenance of all insurance covers. Further the insurance should be in
freely convertible currency.
3.2 Any loss or damage to the material during handling, transportation, storage, erection, and all
activities to be performed till the successful completion of commissioning of the line shall be to the
account of the Contractor. The Contractor shall be responsible for preference of all claims and make
good the damages or loss by way of repairs and/or replacement of the equipment, damaged or lost.
The transfer of title shall not in any way relieve the Contractor of the above responsibilities during
the period of Contract. The Contractor shall provide the Owner with copy of all insurance policies
and documents taken out by him in pursuance of the Contract. Such copies of documents shall be
submitted to the Owner immediately after such insurance coverage. The Contractor shall also
inform the Owner in writing at least sixty (60) days in advance regarding the expiry/cancellation
and/or change in any of such documents and ensure revalidation, renewal etc., as may be necessary
3.3 The perils required to be covered under the insurance shall include, but not be limited to fire and
allied risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage
in transit, theft, pilferage, riot and strikes and malicious damages, civil commotion, weather
conditions, accidents of all kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including delivery of goods
and other costs till the equipment is delivered at Site. The insurance policies to be taken should be
on replacement value basis and/or incorporating escalation clause. Notwithstanding the extent of
insurance cover and the amount of claim available from the underwriters, the Contractor shall be
liable to make good the full replacement/rectification value of all equipment/materials and to
ensure their availability as per project requirements.
3.4 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the Workmen’s
Compensation Act, 1948 (Government of India). This policy shall also cover the Contractor against
claims for injury, disability, disease or death of his or his SubContractor’s employee, which for any
reason are not covered under the Workmen’s Compensation Act, 1948. The liabilities shall not be
Workmen’s Compensation : As per statutory Provisions
Employee’s liability : As per statutory Provisions
3.5 Comprehensive General Liability Insurance
Seal and Signature of Contract Page 25 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
The insurance shall protect the Contractor against all claims arising from injuries, disabilities,
disease or death of members of public or damage to property of others, due to any act of omission
on the part of the Contractor, his agents, his employees, his representatives and Sub-Contractors or
from riots, strikes and civil commotion.
3.6 The hazards to be covered will pertain to all the works and areas where the Contractor, his agents
and his employees have to perform work pursuant to the Contract.
3.7 The above are only illustrative list of insurance covers normally required and it will be the
responsibility of the Contractors to maintain all necessary insurance coverage to the extent both in
time and amount to take care of all his liabilities either direct or indirect, in pursuance of the
STORAGE-CUM-ERECTION INSURANCE:- The contractor shall take suitable storage-cum- erection
insurance cover at his cost to the extent of 100 % cost of S/S materials, which are required to
complete the work. Bidder shall have to take the comprehensive Marine cum erection (MCE)
insurance policy against any loss, damage, theft, pilferage, fire etc. for the complete period of
storage, erection and commissioning up to the time of taking over of the work by GETCO. However,
if the work is not completed within the stipulated time limit as mentioned into work order, the MCE
shall be extended by the contractor up to the work completion and taking over of the line or S/S by
GETCO. Moreover, the charge for extension of insurance shall be borne by contractor if the delay is
attributed to the contractor. The charge for extension of insurance shall be reimbursed by GETCO to
the contractor on production of proof for extension of MCE if the delay is attributed on the part of
The Contractor shall deal directly and pursue the claim with the Insurance Company and shall be
responsible in regard to maintenance of all insurance coverage as well as for settlement of claim.
The proof of insurance policy taken by the successful Contractor shall be furnished/submitted to
Engineer-In-Charge of GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance policy. The risk
shall be covered for lifting of materials from store to final handing over to GETCO. Further, in
absence of the above insurance policy, R.A. Bill payment will be withheld.
The contractor shall take suitable storage cum erection insurance cover for the entire project
including all materials, which are required to complete the line, at his own cost. Such insurance will
cover against destruction, loss by theft, damage in transit during erection, or otherwise or by fire,
flood under exposure to the weather or through riot, civil commotion, for the full value thereof, until
takeover of line.
However, it will be contractor’s responsibility to Insure entire project till the line is taken over
The approximate amount of the material required for erection to complete the scope
of work whose insurance is Rs. 2.22 crores OR as per instruction of EIC.
The contractor shall take suitable storage cum erection insurance cover for the entire project
including all materials, which are required to complete the line, at his own cost. Such insurance will
cover against destruction, loss by theft, damage in transit during erection, or otherwise or by fire,
Seal and Signature of Contract Page 26 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
flood under exposure to the weather or through riot, civil commotion, for the full value thereof, until
takeover of line.
However, it will be contractor’s responsibility to Insure entire project till the line is taken over by
The successful contractor shall be Informed the value for which he has to avail the storage cum
erection insurance.
3.4 PENALTY FOR DELAY:-
1. The bidder should note that the completion time allowed for carrying out the work should be strictly
observed. Any delay that may take place in supply and erection beyond contractual cutoff date stated
as per stipulated delivery period shall be subject to the penalty ½% per week or part thereof
plus plus applicable taxes (if any) as applicable on delayed portion of work and / or supply
value subject to ceiling of 10% of the total contract value plus APPLICABLE TAXES (IF ANY) as
applicable will be imposed.
2. In event of failure of the Contractor to pay the amount of Penalty as demanded, the Owner
shall be entitled to deduct the amount of Penalty for delay from the amounts payable to the
Contractors under any bills raised under this contract or any other contract with the GUVNL
and its Subsidiary Companies i.e. GETCO, GUVNL, GSECL, MGVCL, DGVCL, PGVCL UGVCL. It is
permissible for the Owner to adjust the amount of Penalty of delay against any Bank
Guarantee furnished by the Contractor under this contract or any other contract with
GUVNL and/or its subsidiary companies.
3. The parties agree that delay in completion of contract will result into loss of revenue and
consequently loss of profit to the owner, however, the amount of loss of revenue on account
of delay in commissioning the works cannot be calculated accurately at this stage the parties,
therefore, agree the penalty stipulated above is a genuine are estimate of the loss/damage
which will be suffered on account of delay and/or breach on the part of the contractor and
the said amount will be payable by the contractor on demand.
4. If it is found that the work is unsatisfactory or not progressing as per the program / BARCHART /
Target period, any action taken by the GETCO, as may be deemed fit, to see that work is completed as
required by the GETCO, would be at the risk and cost of the contractor..
5. Any delay causing extension of outages shall be contractor’s responsibility and appropriate amount
(in term of Rupees) as decided by Ex. Engineer (AM), GETCO, Division Office Bhuj shall be
recovered from Contractor’s bill as a penalty.
Taxes and Duties:
3.5.1 As regards the income Tax, surcharge on income tax and any other corporate tax,
Excluding GST and excluding welfare cess at prevailing rate the owner shall not bear any tax
liability whatsoever. The bidder shall be liable and responsible for payment of such taxes as
attracted under the provisions of the law.
3.5.2 Notwithstanding the tax liabilities as per the sub-clause14.1 above the owner shall have
the right to make deduction at source from the amounts payable to the contractor in respect of
Seal and Signature of Contract Page 27 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Income Tax (on the cost of items of supply included in the works contract) as may be
mandatory in terms of the law. The owner shall not bear any liability in this regard but shall
issue necessary certificate in respect of such deduction made.
3.5.3 In case any tax or duty is newly introduced by the Government applicable for this
contract with effect from the next day of the date submission of the bid and if the
contractor is required to pay additional tax or duty, then the owner shall reimburse the
contractor the additional tax or duty so paid by the contractor against submission by the
contractor of documentary evidence to the satisfaction of the owner. This provision will not
be applicable to transaction between the contractor and his sub-contractors. Besides the said
statutory variation, no other statutory variation shall be payable by the owner.
3.5.4 The owner’s liability for all taxes and duties under the contract shall be limited to those
indicated by the Bidder in the Sign & Seal of Contractor Page 8 Bid Proposal Sheets, subject to
the statutory variations and variations as per Clause No. 14.3. If the cost to the Contractor
during the performance of the ‘Contract’ shall be increased or reduced by reasons of the
making, passing or promulgation of any law after the date of submission of bid or by any order,
regulation or bye-law having the force of law the amount of such increase or reduction shall
be added to or deducted from the “Contract Price” as the case may be for direct transactions
between contactor & owner, and not for bought out items. It is the Bidders responsibility to
furnish details of taxes, duties, levies etc. applicable as on the date of submission of the bid.
3.5.5 No claim for any increase towards the statutory variation regarding enhancement of
existing tax or duty or introduction of a new tax or duty applicable shall be entertained by
the Owner during the extended period of contract, if any, provided the extension of the
contract is required by causes attributable to the contractor.
35.6 The provision of statutory variation regarding enhancement of existing tax or duty or
introduction of a new tax or duty will be applicable only to the direct transaction between the
contractor and the owner.
3.5.7 Before quoting, the bidder may ascertain from the concerned tax authorities of
Government of Gujarat the applicability of Work Contract Tax. Entry Tax, GST etc. in respect
of this work and include the same in the quoted price. No separate claim in this regard will
be entertained by the Owner, as it is the responsibility of the Bidder to pay all these taxes.
“Supplier contractor should charge GST in Invoice at the rate as agreed to / mentioned in
acceptance of tender only and any deviation in the same shall not be accepted. Further , any
additional liability of GST (later on due to wrong mentioning of GST rate, mis-interpretation of
HSN/SAC Code etc.) over and above as charged in the invoice shall be borne by the supplier
/Contractor. However ,any refund received by the supplier / contractor on account of GST Charged
from the company ; such refund shall have to be passed on to the company , along with interest
needs to be passed on suo-moto by the supplier contractor.
Further the Company has a right to recover the amount of GST along with penal interest at the of
15% per annum if GST charged is not paid /short paid to the government or fail to upload the
Seal and Signature of Contract Page 28 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
details or uploads inaccurate particular on GSTIN portal by the Supplier /Contractor within the
stipulated time limit.
In case, GOVT. revise the rate of GST rate /code during the tenure of the contract the provision of
statutory variation clause shall apply.”
"RIGHTS OF THE OWNER:
Whenever any claim or claims for payment of a sum of money arises out of or under the
contract against the Contractor, the Owner shall be entitled to withhold and also have a lien
to retain such sum or sums in whole or in port from the security, If any, deposited by the
Contractor and for the purpose aforesaid, the Owner shall be entitled to encash and
withhold the amount of Performance Bank Guarantee or other security, if any, furnished as
the case may be. The Owner shall also have a lien over the same pending finalization or
adjudication of any such claim. In the event Of the security is insufficient to cover the
claimed amount or amounts, the Owner shall be entitled to withhold and have lien to retain
to the extent of the such claimed amount or amounts referred to above, from any sum or
sums found payable or which at any time thereafter may become payable to the Contractor
under the same contract or any other contract with the Owner or GUVNL or its subsidiary
companies pending finalization or adjudication of any such claim.
Line in respect of Claims in other Contracts:
a) Any sum of money due and payable, to the Contractor (Including the security deposit)
the contract may be withheld or retained by way of lien by the Owner against any of its
claim in respect of payment of a sum of money arising out of or under any other contract
made by the Contractor with the Owner or GUVNI or any of its subsidiary companies.
b) It is on agreed that the sum of money so withheld or retained under this clause by the
Owner will be kept withheld or retained as such by the Owner till its claim arising out of
the same contract or any other contract is either mutually settled or determined by the
arbitrator or competent court, as the case may be, and the Contractor shall have no claim
for interest or damages whatsoever on this account or on any other ground in respect of
any sum of money withheld or retained under this clause and as may be duly notified to the
This is put up herewith for perusal and approval so that above stated enabling clauses may
be incorporated in the terms and conditions of Tender / Contracts by our Procurement
Department. Project Department, Transmission Department, R&M Department and Civil
Seal and Signature of Contract Page 29 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
department. Further, we may ask CE (Project) to instruct the field offices for incorporating
the above clauses in field tenders.
TERMS & CONDITIONS REGARDING INDUSTRIALLAWS AND OTHER RELATED MATTERS
1) Wages to be paid at time of payment etc. by the contractor.
a. The contractor shall pay minimum prevailing rates per day or as may be specified hereafter
or rates fixed under the minimum wages Act. Whichever is higher. The wages or very
contract labour employed by him under this contact shall be paid by him before the expiry
of 7th day of the month in respective of which the wages are payable ( i.e. wages of a month
have to be paid by him in the first week of the next month). The payment shall be disbursed
in the presence of management representative during the working hours in factory
premises and the contractor shall get the entries certified in the register of wages by the
representative of the GETCO. Any default will result in cancellation of contract forthwith or
also the contractor shall be paid punishable to the extent of Rs.100/- fine per each day.
b. The contractor shall give his telephone number and address to the GETCO so that in case of
labour troubles etc. the contractor can be contacted. The contractor shall arrange to have
his office outside the factory premises and the contractor shall keep himself present
throughout the working hours.
(A) Person below the age of 18 years shall not be employed for the work.
(B) No. female worker shall be employed in the night shift between 7 p.m. to 6 a.m.
(C) Contractor shall maintain a valid labor license under the contract labour (Regulation and Abolition)
Act for employing necessary manpower to be required by him. In the absence of such license the
contract shall be liable to be terminated without assigning any reason thereof.
(D) The contractor shall at his own expenses comply with all labour laws and keep the GETCO
indemnified in respective thereof. Some of the major liabilities under various labour and industrial
laws which the contractor shall comply with areas under :-
(i) Payment of contribution by way of employer’s contribution towards provident fund, family
pension scheme, Deposit linked insurance scheme, Administrative charge etc. at the rates make
applicable from time to time by Government of Gujarat/Government of India or other statutory
(ii) Payment of deposit in respect of each contract labour at the rate as per admissible with the
office of commissioner of Labour as per the contract Labour (Regulation and abolition Act.).
(iii)License fee as prescribed under the contract labour (Regulation and abolition Act) and rules
framed there under depending upon the number of workmen employed by the contractor.
(iv) Paid leave facility and wages as per the provision of the factories Act at the rate of one day for
every 20 days of working.
(v) Identify cards as prescribed under the factories Act with photo at fixe there to the same
identification. Liabilities as per industrial Disputes Act any payment to the contractor’s
employees arising out of any claim or disputes under the industrial Disputes Act, 1947 or any
other labour laws.
(vi) Payment of compensation in case accidental inquiry.
(vii) Maternity leave as per the provisions of the maternity Benefit Act. The above are some of the
major liabilities of the contractor in addition to other liabilities. Prescribed under the various
Seal and Signature of Contract Page 30 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
labour laws in force from time to time from statutory authorities like State Government/
Government of India which the contractor shall have to comply with.
3) Provident fund & Family pension Scheme:-
The contractor shall submit along with his bill (month wise) a statement regarding deduction
against employees provident fund and family pension scheme in respective of each concerned
employee, provident fund and family pension scheme at the rate at admissible ( or at the rate
made applicable by the Government from time to time ) of the wages. The contractor’s
contribution and his workers contribution towards provident fund and family pension scheme
shall be deposited by the contractor with concern regional Provident Fund Commissioner office.
4) Deposit Linked Insurance Scheme :-
The contractor shall have to deposit ½ % of the wage in respect of employees who is a member
of the Provident Fund as the contribution to the deposit.
Linked insurance Scheme with concern Regional Provident Fund Commissioner office.
(5) Administrative Charges:-
Administrative charges for maintaining provident fund A/C shall be deposited by the contractor
with concern Regional Provident Fund Commissioner office at the rates applicable.
(6) Paid Leave Facility:-
Paid leave facility at the rate of one day for every twenty days worked by the contract labour
shall be provided by the contractor to his workers. He shall maintain leave Records/leave cards
for individual labourer which shall be duly verified and approved/certified by the authorized
officer of the GETCO.
(7) Workmen’s compensation fund & Employer’s Liability Insurance:-
The contractor shall cover all his employees under workmen’s compensation fund and under the
liability insurance. Insurance shall be affected for the entire contractor’s employee engaged in the
performance of this contract. If any of the work is subject the contractor shall require the sub-
contractor to provide workmen’s compensation and employer’s liability insurance for the latter’s
employees unless such employees are covered under the contractor’s insurance.
(8) The contractor shall employ adequate number of experienced staff at site for dial supervision and
for maintenance of various register and records required under the law and contract No.
payment for supervision shall be admissible.
(9) Contractor to Identify the GETCO:-
The contractor shall indemnify the GETCO and every member officer and employees of the
GETCO also, engineering in charge and his staff against all actions, proceeding, claims demands,
costs and expenses which may be made against the GETCO or Government for or in respective of
formance of his obligation under the contract documents. The GETCO shall not liable for or in
respective of or in consequence of any accident or injury to any workman or other person in the
employment of the contractor or his sub-contractor and the contractor shall indemnify and keep
indemnified the GETCO against all such damage and compensation and against all claims,
demands, proceedings costs, charges and expenses whatever in respective thereof in relation
(10) The GETCO reserves the right to terminate this rate contract at any time during its tendency
without giving notice of termination or any reasons thereof.
(11) The GETCO will be entitled to deduct directly from the bills, to be paid to the contractor any sum
or payable by you and which sum/sums the GETCO is required to pay as principal employer on
account of your default in respect of all liabilities referred to in above clauses.
Seal and Signature of Contract Page 31 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
CONFIRMATION OF DETAILS OF BIDDER
Bidders are required to furnish following information specifying YES / NO
1) Whether the Bid is on percentage basis as called for. Yes / No
2) Whether rebate furnished is in percentage basis as called for. Yes / No
3) Whether the Bid is submitted by RPAD. Yes / No
4) Whether all pages of Bid Specifications are sealed and signed by the Bidder. Yes / No
5) a) Whether the Bidder is registered with for erection Yes / No
b) In case of “Yes”, please furnish following details:
i) Registration Letter No. & date.
ii) Class of Registration
c) Whether Bidder is having PF Code No. Yes / No
6) a) Whether EMD paid. ( BY ONLINE PAYMENT MODE RTGS/NEFT ) Yes / No
b) In case “Yes”, furnish details
7) Whether following documents as specified are submitted.
a) Human Resources detail. Yes / No
b) Availability of tools, equipment’s etc. Yes / No
c) Details of orders executed / on hand Yes / No
d) Financial capability. Yes / No
e) Experience as specified. Yes / No
f) Latest Income-tax certificate Yes / No
g) Company's Articles Of Association Yes / No
h) Details Of Partners / Directors Yes / No
i) B.R./P.A. Authorizing Person Yes / No
j) Power of Attorney of Consortium Members Yes / No.
Signature of Authorized Representative of
Name of tendering
Seal and Signature of Contract Page 32 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
GENERAL TECHNICAL CONDITION:_
1. The erection work should be carried out according to the specification and as per
instructions and programmed laid out by the Engineer in-charge of the work.
2. The contractor should employee as Supervisor with sufficient qualification and experience who can
supervise the execution of work throughout. He should always be present on the site.
3. Cutting, bending, welding, brazing, wherever necessary is to be done by the contractor.
4. The contractor has to carry out all the works in accordance with revised and latest provision under
I.E. Rules Act made there under and as per instruction of Engineer in charge.
5. Contractor has to co-ordinate E.I.C. for planning of outage and work schedule thereof, so as to
complete all the planned work in outage. Contractor has to deploy adequate manpower accordingly.
6. In addition to the general of the construction particular, attention shall be paid to the final finish and
every effort shall be made to have the entire work contented with standard of workmanship by the
7. Electricity Rules: -All the works shall be carried out in accordance with latest rules under Electricity
8. Testing: - Complete installation shall be put to the necessary test as required and shall be got
approved by Government Electrical Inspector.
9. CONTRACTOR’S MATERIALS BROUGHT TO SITE
a) The Contractor shall bring to Site all materials, including construction equipment, tools
and tackles for the purpose of the works under intimation to the Engineer. All such
goods shall, from the time of their being brought vest in the Owner, but may be used for
the purpose of the works only and shall not on any account be removed or taken away by
the Contractor without the written permission of the Engineer. The Contractor shall
nevertheless be solely liable and responsible for any loss or destruction thereof and
damage thereto.
b) After the completion of the Works, the Contractor shall remove from the Site under the
direction of the Engineer the materials such as construction equipment, erection tools
and tackles, scaffolding etc. with the written permission of the Engineer.
10. FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and other Contract
Documents and any other supplementary data complete with all the latest revisions thereto. The
Contractor shall also maintain in addition the continuous record of all changes to the above Contract
Documents, drawings, specifications, and supplementary data, etc. effected at the field and on
completion of his total assignment under the Contract shall incorporate all such changes on the
drawings and other Engineering data to indicate as installed conditions of the equipment furnished
and erected under the Contract. Such drawings and Engineering data shall be submitted to the
Engineer in required number of copies.
11. Contractor shall purchase all brought out items as per schedule-B with taking prior approval
from Executive Engineer (AM), GETCO, Division Office, Bhuj. Any item without approval
shall not be permitted and GETCO shall not be responsible for accept such items.
12. DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of
his employees and workmen at Site. The Engineer shall be at liberty to object to the
Seal and Signature of Contract Page 33 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
presence of any representative or employee of the Contractor at the Site, if in the opinion of
the Engineer such employee has misconduct himself or is incompetent or negligent or
otherwise undesirable and then the Contractor shall remove such a person objected to and
provide in his place a competent replacement.
13. CONTRACTOR’S FIELD OPERATION
1 The Contractor shall keep the Engineer informed in advance regarding his field
activity plans and schedules for carrying-out each part of the works. Any review of
such plan or schedule or method of work by the Engineer shall not relieve the
Contractor of any of his responsibilities towards the field activities. Such reviews
shall also not be considered as an assumption of any risk or liability by the Engineer
or the Owner or any of his representatives and no claim of the Contractor will be
entertained because of the failure or inefficiency of any such plan or schedule or
method of work reviewed. The Contractor shall be solely responsible for the safety,
adequacy and efficiency of plant and equipment and his erection methods.
2 The Contractor shall have the complete responsibility for the conditions of the Work-site
including the safety of all persons employed by him or his Sub–Contractor and all the
properties under his custody during the performance of the work. This requirement shall
apply continuously till the completion of the Contract and shall not be limited to normal
14. PROGRESS REPORT
The Contractor shall furnish three (3) copies each to the Engineer of progress including if
any, photographs of the work done at Site. The monthly progress report detailing-out the
progress achieved on all erection activities shall highlight comparison to the schedules. The
report shall also indicate the reasons for the variance between the scheduled and actual
progress and the action proposed for corrective measures, wherever necessary.
15. MAN-POWER REPORT
The Contractor shall submit to the Engineer, on the first day of every month, a man hours
schedule for the month, detailing the man hours scheduled for the month, skill-wise and
16. Contract Quality assurance:
The Bidder shall include in his proposal the Quality Assurance Programme containing the overall
quality management and procedures which he proposes to follow in the performance of the Works
during various phases. At the time of Award of Contract, the detailed Quality Assurance Programme
to be followed for the execution of the Contract will be mutually discussed and agreed and such
agreed Programme shall form a part of the Contract.
Seal and Signature of Contract Page 34 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
SPECIAL TECHNICAL CONDITION:_
i. All work is to be carried out as per the manual of OEM (Original equipment manufacturer),
FQP, approved drawing, specification and instruction of E.I.C.
ii. All erection work includes erection insurance to be arranged by the contractor at his cost.
iii. All the required tools and tackles like compression jointing machine for conductor, earth
wire, cutting machine, welding set, drill machine, etc are to be arranged by the contractor at
iv. All the work related to the transmission line like detailed survey, check survey, tower/DP
foundations, material testing, tower/DP erection, stringing, final testing, etc. should be
carried out as per GETCO'S standard FQP for transmission line.
v. Successful bidder has to appoint site engineer to maintain site register and FQP as per ISO
vi. All work should be done according to ISO & FQP and all require documents including filled
FQP, testing results, etc should be submitted while handing over the line
vii. While calculating the weight of stub-setting, the weight of stub, cleat & templates shall also
be added in stub weight.
viii. The rates are with supply of cement by the contractor.
ix. Red oxide & zinc rich paint shall be applied after tack welding of nuts.
x. The rate indicated includes taking delivery of all stringing material Board's stock at
destination keeping them in safe custody and transporting the same to erection site
xi. Contractor has to ensure safe shifting dragging erection of all equipments to comply with
labour laws I.E. rules etc.
xii. Earthing pit activities should be done in such a way in presence of GETCO supervisor that
final earthing pit resistance should be record as per standard. All expenditure like sufficient
watering to maintain earth resistance up to the mark should be born by contractor.
xiii. Contractor has to make arrangement for skill labours for assisting to commissioning
engineer as an when require as per instruction of Engineer in charge.
xiv. After completion of project successful bidder has to submit all the records like Final as build
check survey, profile, clearance, foundation register, soil classification record, stringing
chart, material inventory sheet etc in hard and soft copy for handing over the project.
xv. All items / materials shall be installed / erected in accordance with specified manuals
/technical guide lines of the manufacturer and as per instruction of EIC.
xvi. Successful bidder has to appoint site engineer to maintain site register and FQP as per ISO.
xvii. All work should be done according to ISO & FQP and all require documents including filled
FQP, testing results, etc should be submitted while handing over the project.
xviii. Contractor has to submit the planning bar chart before starting the work in kickoff meeting.
xix. Contractor has to complete all the work related to this title in stipulated outage period as
per instruction of EIC
xx. Material from store shall not be issued until contractor will submit proof for taking storage
cum erection insurance policy for particular project.
Contractor Signature with stamp
Seal and Signature of Contract Page 35 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
GENERAL CONDITIONS OF CONTRACT
(C) GENERALTERMS &CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor as per the
Contract Agreement signed by the parties, including all attachments and appendices thereto and all
documents incorporated by reference therein.
1.2 ‘Owner’ shall mean the Gujarat Energy Transmission Corporation Ltd, Vadodara or any of its group
companies i.e GUVNL, GSECL, MGVCL, DGVCL, PGVCL, UGVCL and shall include its legal
representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the Works
and shall include such successful Bidder’s legal representatives, successors and permitted assigns.
1.4 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from time to
time for the purpose of the Contract.
1.5 The terms ‘Stores’ and ‘Materials’ shall mean and include equipment, stores and materials to be
issued to the Contractor under the Contract.
1.6 ‘Works’ shall mean and include taking delivery of line materials labour and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation including all
transportation, handling, unloading and storage at the Site as defined in the Contract.
1.7 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the Contract
and such other schedules and drawings as may be mutually agreed upon.
1.8 Site’ shall mean and include the land and other places on, into or through which the works and the
related facilities are to be erected or installed and any adjacent land, paths, street or reservoir which
may be allocated or used by the Owner or Contractor in the performance of the Contract.
1.9 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in his
bid with additions and/or deletions as may be agreed and incorporated in the Letter of
Award and the contract agreement for the entire scope of the works.
1.10 The term “Erection portion” of the contract price shall mean the value of field activities of
the works including erection, testing, and putting into satisfactory operation including
successful completion of performance and guarantee test to be performed at site by the
contractor including cost of insurances.
1.11 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated by the time to
inspect the equipment; stores or Works under the Contract and/or the duly authorized
representative of the Owner.
Seal and Signature of Contract Page 36 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
1.12 ‘Notice of Award of Contract’/’Letter of Award’/’Telex of Award’ shall mean the official notice issued
by the Owner notifying the Contractor that his bid has been accepted.
1.13 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.14 Date of Contract’ shall mean the date on which letter of commencement of work issued by the
respective sub division deputy engineer.
1.15 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly defined
shall mean calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.16 Writing’ shall include any manuscript, type written or printed statement, under or over signature
and/or seal as the case may be.
1.17 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’, ‘Requested’, ‘As
Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’, ‘Permitted’, or words and
phrases of like importance are used the approval, judgment, direction etc. is understood to be a
function of the Owner/Engineer.
1.18 Test on completion shall mean such tests as prescribed in the Contract to be performed by the
Contractor before the work is taken over by the Owner.
1.19 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to
determine and demonstrate capacity, efficiency, and operating characteristics as specified in the
Contract Documents.
1.20 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of the Works
performed under the Contract, after successful commissioning/completion of Performance and
Guarantee Tests, as specified in the accompanying Technical Specifications or otherwise agreed in
1.21 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man- ship which
cannot be detected during inspection, testing etc, based on the technology available for carrying out
1.22 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any:
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
Seal and Signature of Contract Page 37 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the subject
matter of the Contract.
1.23 Words imparting the singular only shall also include the plural and vice –versa where the context so
1.24 Words imparting ‘Person’ shall include firms, companies, corporations and associations or bodies of
individuals, whether incorporated or not.
1.25 Terms and expressions not herein defined shall have the same meaning as are assigned to them in
the Indian Sale of Goods Act (1930), failing that in the Indian Contract Act (1872) and failing that in
the General Clauses Act (1897) including amendments thereof, if any.
1.26 In addition to the above the following definitions shall also apply.
a) ‘All equipment and materials’ to be supplied shall also mean ‘Goods’.
b) ‘Constructed’ shall also mean ‘erected and installed’.
c) ‘Contract Performance Guarantee’ shall also mean ‘Contract Performance Security’.
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not superseded by provisions in
other parts of the Contract.
The works carried out under this Contract shall conform to the all statutory regulation and
provisions the acts, mentioned in the Technical Specifications, and, when no regulations or standard
is mentioned, to the authoritative regulations or standards/ Act, appropriate to the works and such
stipulations shall be the latest issued by the concerned institution.
4.0 LANGUAGE AND MEASURES
All documents pertaining to the Contract including specifications, schedules, notices,
correspondences, operating and maintenance instructions, drawings or any other writing shall be
Seal and Signature of Contract Page 38 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
written in English language. The Metric System of measurement shall be used exclusively in the
5.0 CONTRACT DOCUMENTS
5.1 The term Contract Documents shall mean and include the following which shall be deemed to form
an integral part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to Bidders,
General Terms and Conditions of Contract and all other documents included under Volume- I
and the Special Conditions of Contract.
b) Specifications of the erection of the equipments and other technical services to be provided
under the Contract as brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of
clarifications thereto between the Contractor and the Owner prior to the Award of Contract
except to the extent of repugnancy.
d) All the materials, literature, data and information of any sort given by the Contractor along
with his bid, subject to the approval of the Owner /Consultant.
e) Letter of Award and any agreed variations of the conditions of the documents and special
terms and conditions of Contract, if any.
5.2 In the event of any conflict between the above mentioned documents the matter shall be referred to
the Engineer whose decision shall be considered as final and binding upon the parties.
6.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
6.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract, or any
provision thereof, or any specification, plan, drawing, pattern, sample or information furnished by
or on behalf of the Owner in connection therewith, to any person other than a person employed by
the Contractor in the performance of the Contract. Disclosure to any such employed person shall be
made in confidence and shall extend only so far as may be necessary for the purpose of such
6.2 The Contractor shall not, without the Owner’s prior written consent, make use of any document or
information enumerated in various Contract documents except for the purpose of performing the
6.3 The Contractor shall not communicate or us in advertising, publicity, sales releases or in any other
medium, photographs or other reproduction of the Works under this Contract, or descriptions of the
site, dimensions, quantity, quality or other information, concerning the works unless prior written
permission has been obtained from the Owner.
6.4 Any document, other than the Contract itself, enumerated in various Contract documents shall
remain the property of the Owner and shall be returned (in all copies) to the Owner on completion
of the Contractor’s performance under the Contract if so required by the Owner.
Seal and Signature of Contract Page 39 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
7.0 CONSTRUCTION OF THE CONTRACT
7.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered into
will be treated as a single Contract.
Award shall be placed on the successful Bidder as follows:
For providing services like inland transportation, insurance for delivery at site, unloading, storage,
handling at site, installation, testing and commissioning including performance testing in respect of
all the equipment material equipment/materials given by the owner after observing standard store
procedures for transport from owner’s stores, insurance, unloading storage handling at site
installation testing & commissioning.
7.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor for
executing, then the Contractor shall at the time of taking delivery of the equipment/dispatch
documents be required to execute an Indemnity Bond in favor of the Owner in the form acceptable
to the SE(AM) GETCO Anjar for keeping the equipment in safe custody and to utilize the same
exclusively for the purpose of the said Contract. Samples of Performa for the Indemnity Bond will be
furnished during award of Contract.
7.3 The Contract shall in all respects be construed and governed according to Indian Laws.
7.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into
various components only for the convenience of payment under the Contract(s) and for the
measurement of deviations or modifications under the Contract(s).
8.0 JURISDICTION OF CONTRACT
8.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of Vadodara shall
have exclusive jurisdiction in all matters arising under this Contract.
9.0 EXECUTION OF CONTRACT:
9.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy of the final
agreement to the Contractor for his scrutiny and approval.
9.2 The Agreement, unless otherwise agreed to, shall be signed within 10 days of the acceptance of the
Letter of Award, at the office the Owner at Anjar on a date and time to be mutually agreed. The
Contractor shall provide for signing of the Contract, Performance Guarantee, appropriate power of
attorney and other requisite materials. In case the Contract is to be signed beyond the stipulated
time, the Bid Guarantee submitted with the Proposal will have to be extended accordingly.
9.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided with
one signed original and the rest will be retained by the Owner.
9.4 The Contractor shall provide free of cost to the Owner all the Engineering data, drawings, and
descriptive materials submitted with the bid, to form a part of the Contract immediately after issue
of Letter of Award
Seal and Signature of Contract Page 40 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
9.5 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the Owner with
copies of agreement within fifteen (15) days after the signing of the Contractor.
10.0 ENFORCEMENT OF TERMS
10.1 The failure of either party to enforce at any time any of the provisions of this Contract or any rights in
respect thereto or to exercise any option therein provided, shall in no way be construed to be a
waiver of such provisions, rights or options or in any way to affect the validity of the Contract. The
exercise by either party of any of its rights herein shall not preclude or prejudice either party from
exercising the same or any other right it may have under the Contract.
11.0 COMPLETION OF CONTRACT
11.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract shall be
deemed to have been completed on the expiry of the guarantee period as provided for under the
clause entitled ‘Guarantee’ in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
12.0 TIME – THE ESSENCE OF CONTRACT
12.1 The time and the date of completion of the Contract as stipulated in the Contract by the Owner
without or with modifications, if any, and so incorporated in the Letter of Award, shall be deemed to
be the essence of the Contract. The Contractor shall so organize his resources and perform his work
as to complete it not later than the date agreed to.
12.2 The Contractor shall submit a detailed bar chart within the time frame agreed consisting of
adequate number of activities covering various key phases of the work such as field erection
activities within five (5) days of the date of Notification of Award. This network shall also indicate
the interface facilities to be provided by the Owner and the dates by which such facilities are
needed. The Contractor shall discuss the network so submitted with the Owner and the agreed
network shall form part of the Contract documents. During the performance of the Contract, if in the
opinion of the Engineer, proper progress is not maintained, suitable changes shall be made in the
Contractor’s operations to ensure proper progress without any cost implication to the Owner. The
interface facilities to be provided by the Owner in accordance with the agreed network shall also be
reviewed while reviewing the progress of the Contractor.
12.3 Based on the above agreed network/bar chart fortnightly reports shall be submitted by the
Contractor as directed by the Engineer.
12.4 Subsequent to the finalization of the network, the Contractor shall make available to the Engineer a
detailed program in line with the agreed Contract network.
Such program shall be reviewed, updated and submitted to the Engineer every month thereafter.
12.5 The above bar charts/ program shall be compatible with the Owner’s computer environment and
furnished to the Owner on such media as may be desired by the Owner.
13.0 EFFECTIVENESS OF CONTRACT
Seal and Signature of Contract Page 41 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
The Contract shall be considered as having come into force from the date of the commencement
given by the respective construction sub division unless otherwise provided in the notification of
14.0 PENALTY FOR DELAY
14.1 If the Contractor fails to successfully complete the work within the time fixed under the Contract,
the Contractor shall pay to the Owner as penalty a sum specified for each specified period of delay.
The details of such penalty are brought out in the accompanying Special Conditions of Contract
a. The total amount of penalty for delay under the Contract will be ½ % per week on delayed work
a. The total amount of penalty for delay under the Contract will be ½ % per week on delayed work
amount subject to a maximum of 10% of the Contract prices detailed in the Special Conditions
of Contract (SCC).
15.1 In the event of any emergency where in the judgment of the Engineer, delay would cause serious
loss or damages, repairs or adjustment may be made by the Engineer or a third party chosen by the
Engineer without advance notice to the Contractor and the cost of such work shall be paid by the
Contractor. In the event such action is taken by the Engineer, the Contractor will be notified
promptly and he shall assist wherever possible in making necessary corrections. This shall not
relieve the Contractor of his liabilities under the terms and conditions of the Contract.
15.3 If it becomes necessary for the Contractor to rectify or renew any defective portions of the works
the provision of this clause shall apply to portion of the works so rectified or corrected until the
expiry of six (6) months from the date of such rectification or correction. If any defects are not
rectified within a reasonable time, the Engineer may proceed to do the work at the Contractor’s risk
and cost but without prejudice to any other rights which the Owner may have against the Contractor
in respect of such defects.
15.4 The rectification or correction of the work will be carried out free of cost by the Contractor. If any
rectification or correction is carried out on his behalf at the site, the Contractor shall bear the cost of
such rectification or correction.
15.5 The acceptance of the works by the Engineer shall in no way relieve the Contractor of his obligations
under this clause.
15.6 At the end of the guarantee period, the Contractor’s liability ceases except for latent defects. For
latent defects, the Contractor’s liability as mentioned in Clause Nos. 15.1 through 15.5 above, shall
remain till the end of 6 months from the date of completion of guarantee period.
16.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed against
the Owner or the Contractor in pursuance of the Contract. In addition to this the Contractor shall be
responsible for payment of all Indian duties, levies and taxes lawfully assessed against the
Contractor for his personal income & property only.
Seal and Signature of Contract Page 42 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
18.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the Owner,
for the failure, omission or neglect on the part of the Contractor to perform any acts, matters,
covenants or things under the Contract, or for damage or injury caused by the alleged omission or
negligence on the part of the Contractor, his agents, representatives or his Sub-Contractors, or in
connection with any claim based on lawful demands of Sub-Contractors, workmen, suppliers or
employees, the Contractor shall in all such cases indemnify and keep the Owner, and the Engineer
and/or his representative, harmless from all losses, damages, expenses or decrees arising of such
20.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the
Contractor from all his liabilities under the Contract. Such final payment shall be made only at the
end of the Guarantee/Warranty period or after finalization of material account and final bill and till
such time as the Contractual liabilities and responsibilities of the Contractor, shall prevail. All other
payments made under the Contract shall be treated as on-account payments.
21.0 ENGINEER’S DECISION
21.1 In respect of all matters which are left to the decision of the Engineer including the granting or with-
holding of the certificates, the Engineer shall, if required to do so by the Contractor, give in writing a
decision thereon.
21.2 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance with the
meaning and intent of the Contract, the Contractor may file with the Engineer, within fifteen (15)
days after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the
Engineer’s decision and the decision shall become final and binding.
21.3 The Engineer’s decision and the filing of the written objection thereto shall be a condition precedent
to the right to request arbitration. It is the intent of the Agreement that there shall be no delay in
the execution of the works and the decision of the Engineer as rendered shall be promptly observed.
22.0 POWER TO VARY OR OMIT WORK
22.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter
referred to as ‘variation’) under the Contract as detailed in the Contract Documents, shall be made
by the Contractor except as directed in writing by the Engineer, but the Engineer shall have full
powers subject to the provisions hereinafter contained, from time to time during the execution of
the Contract, by notice in writing to instruct the Contractor to make such variation without
prejudice to the Contract. The Contractor shall carry out such variation and be bound by the same
conditions as far as applicable as though the said variations occurred in the Contract Documents. If
any suggested variations would, in the opinion of the Contractor, if carried out, prevent him from
fulfilling any of his obligations or guarantees under the Contract, he shall notify the Engineer thereof
in writing and the Engineer shall decide forthwith whether or not, the same shall be carried out and
if the Engineer confirms his instructions, the Contractor’s obligations and guarantees shall be
modified to such an extent as may be mutually agreed. Any agreed difference in cost occasioned by
any such variation shall be added to or deducted from the Contract Price as the case may be.
Seal and Signature of Contract Page 43 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
22.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be given to the
Contractor to enable him to work his arrangement accordingly, and in cases where goods or
materials are already prepared or any design, drawings or pattern made or work done as per the
contract requires to be altered, a reasonable and agreed sum in respect thereof shall be paid to the
22.3 In any case in which the Contractor has received instructions from the Engineer as to the
requirement of carrying out the alterations or additional or substituted work which either then or
later on, will in the opinion of the Contractor, involve a claim for additional payment, the Contractor
shall immediately and in no case later than thirty (30) days, after receipt of the instructions
aforesaid and before carrying out the instructions, advise the Engineer to that effect. But the
Engineer shall not become liable for payment of any charges in respect of any such variations,
unless the instructions for the performance of the same shall be confirmed in writing by the
22.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in
writing, so to the extent of any change in the price, before the Contractor proceeds with the change.
22.5 In all the above cases, in the event of a disagreement as to the reasonableness of the said sum, the
decision of the Engineer shall prevail.
22.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power to
instruct the Contractor, in writing, during the execution of the Contract to vary the quantities of the
items or groups of items in accordance with the provisions of clause entitled ‘Change of Quantity’ in
section GCC of this Volume-I. The Contractor shall carry out such variations and be bound by the
same conditions as though the said variations occurred in the Contract Documents. However, the
Contract Price shall be adjusted at the rates and the prices provided for the original quantities in the
23.0 ASSIGNMENT AND SUB-LE TTING OF CONTRACT:
No subletting of contract is allowed. Contractor should carry out work on his own under his or his
authorized supervisor and by labours employed by him.
24.0 CHANGE OF QUANTITY
24.1 During the execution of the Contract, the Owner reserves the right to increase or decrease the
quantities of items under the Contract but without any change in unit price or other terms &
conditions. Such variations unless otherwise specified in the accompanying Special Conditions of
Contract and/or Technical Specifications, shall not be subjected to any limitation for the individual
items but the total variations in all such items under the Contract shall be limited to a percentage of
the Contract price as specified in the Special Conditions of Contract.
24.2 The Contract price shall accordingly be adjusted based on the unit rates available in the Contract for
the change in quantities as above. The base unit rates, as identified in the Contract shall however
remain constant during the currency of the Contract, except as provided for in Clause 33.0 below. In
case the unit rates are not available for the change in quantity, the same shall be subjected to mutual
Seal and Signature of Contract Page 44 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
26.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting
Engineers and freely exchange with them such technical information as is necessary to obtain the
most efficient and economical design and to avoid unnecessary duplication of efforts. The Engineer
shall be provided with three copies of all correspondence addressed by the Contractor to other
Contractors and Consulting Engineers of the Owner in respect of such exchange of technical
information, wherever needed.
27.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or agents
nor any order by the Owner or the Engineer for payment of money or any payment for or
acceptance of, the whole or any part of the Works by the Owner or the Engineer, nor any extension
of time, nor any possession taken by the Engineer shall operate as a waiver of any provision of the
Contract, or of any power herein reserved to the Owner or any right to damages herein provided
nor shall any waiver of any breach in the Contract be held to be a waiver of any other or subsequent
28.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE CONTRACTOR.
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner, nor any
extension of time for execution of the Works granted by the Engineer shall affect or prejudice the
rights of the Owner against the Contractor or relieve the Contractor of his obligation for the due
performance of the Contract, or be interpreted as approval of the Works done or of the equipment
furnished and no certificate shall create liability for the Owner to pay for alterations, amendments,
variations or additional works not ordered, in writing , by the Engineer or discharge the liability of
the Contractor for the payment of damages whether due, ascertained, or certified or not or any sum
against the payment of which he is bound to indemnify the Owner, nor shall any such certificate nor
the acceptance by him of any sum paid on account or otherwise affect or prejudice the rights of the
Owner against the Contractor.
29.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at his own
cost submit periodic progress reports as may be reasonably required by the Engineer with such
materials as, charts, net-works, photographs, test certificates, etc. Such progress reports shall be in
the form and size as may be required by the Engineer.
30.0 TAKING OVER
Upon successful completion of work of erection of tower line by the Contractor, the Engineer shall
issue to the Contractor a completion Certificate as a proof of the final acceptance of the erected line.
Such certificate shall not unreasonably be withheld nor will the Engineer delay the issuance thereof
on account of minor omissions or defects which do not affect the commercial operation and/or
cause any serious risk to the erected line. Such certificate shall not relieve the Contractor of any of
his obligations which otherwise survive, by the terms and conditions of the Contract after issue of
such certificate.
C. CONTRACT SECURITY AND PAYMENTS
31.0 SECURITY DEPOSIT
The Contractor shall furnish SECURITY DEPOSIT for the proper fulfillment of the Contract within
fifteen (15) days of “LETTER OF INTENT”.
Seal and Signature of Contract Page 45 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
32.1 The payment to the Contractor for the performance of the works under the Contract will be made by
the Owner as per the guidelines and conditions specified herein. All payments made during the
Contract shall be on account payments only. The final payment will be made on completion of all
Works and on fulfillment by the Contractor of all his liabilities under the Contract.
32.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
Payment terms will be as prescribed in the special conditions of contract and on fulfillment of
conditions specified thereof.
33.1 Application for Payment
33.2 The Contractor shall submit application for the payment in the prescribed proforma of the Owner.
Performa for application for payment will be as prescribed.
34.1 Each such application shall state the amount claimed and shall set forth in detail, in the order of the
Payment Schedule, particulars of the Works including the Works executed at Site and of the
equipment shipped/brought on to the site pursuant to the Contract upto the date mentioned in the
application and for the period covered since the last preceding certificate, if any.
34.2 Every interim payment certificate shall certify the Contract value of the Works executed upto the
date mentioned in the application for the payment certificate, provided that no sum shall be
included in any interim payment certificate in respect of the works that, according to the decision of
the Engineer, does not comply with the Contract.
34.3 Mode of Payment
34.4 Payment due on completion of work shall be made by the Owner through Owner’s Bank or directly
to the Contractor as per the payment schedule.
34.5.1 All payments under the Contract shall be made as stipulated in the Special Conditions of Contract
after signing the Contract Agreement.
Progressive payments linked with erection shall only be made after the issue of certificates by the
Engineer, one for the quantum of work completed and the other for the successful completion of
quality check points involved in the quantum of work billed.
35.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses which the Owner may have paid, for which under the Contract the
Contractor is liable, or any other retention award will be claimed by the Owner. All such claims shall
be billed by the Owner to the Contractor regularly as and when they fall due. Such bills shall be
supported by appropriate and certified vouchers or explanations, to enable the Contractor to
properly identify such claims. Such claims shall be paid by the Contractor within thirty (30) days of
the receipt of the corresponding bills and if not paid by the Contractor within the said period, the
Seal and Signature of Contract Page 46 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Owner may then deduct the amount, from any monies due or becoming due by him to the
Contractor under the Contract or may be recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
37.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to
the Works and obligatory in terms of law to protect his interest and interests of the Owner against
all perils detailed herein. The form and the limit of such insurance as defined herein together with
the under-writer in each case shall be acceptable to the Owner. However, irrespective of such
acceptance, the responsibility to maintain adequate insurance coverage at all time during the period
of Contract shall be of Contractor alone. The Contractor’s failure in this regard shall not relieve him
of any of his contractual responsibilities and obligations. The insurance covers to be taken by the
Contractor shall be in the joint name of the Owner and the Contractor. The Contractor shall,
however, be authorized to deal directly with Insurance Company or Companies and shall be
responsible in regard to maintenance of all insurance covers. Further the insurance should be in
freely convertible currency.
37.2 Any loss or damage to the material during handling, transportation, storage, erection, and all
activities to be performed till the successful completion of commissioning of the line shall be to the
account of the Contractor. The Contractor shall be responsible for preference of all claims and make
good the damages or loss by way of repairs and/or replacement of the equipment, damaged or lost.
The transfer of title shall not in any way relieve the Contractor of the above responsibilities during
the period of Contract. The Contractor shall provide the Owner with copy of all insurance policies
and documents taken out by him in pursuance of the Contract. Such copies of documents shall be
submitted to the Owner immediately after such insurance coverage. The Contractor shall also
inform the Owner in writing at least sixty (60) days in advance regarding the expiry/cancellation
and/or change in any of such documents and ensure revalidation, renewal etc., as may be necessary
37.3 The perils required to be covered under the insurance shall include, but not be limited to fire and
allied risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage
in transit, theft, pilferage, riot and strikes and malicious damages, civil commotion, weather
conditions, accidents of all kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including delivery of goods
and other costs till the equipment is delivered at Site. The insurance policies to be taken should be
on replacement value basis and/or incorporating escalation clause. Notwithstanding the extent of
insurance cover and the amount of claim available from the underwriters, the Contractor shall be
liable to make good the full replacement/rectification value of all equipment/materials and to
ensure their availability as per project requirements.
37.4 All costs on account of insurance liabilities covered under the Contract will be on Contractor’s
account and will be included in Contract Price, However, the Owner may from time to time, during
the pendency of the Contract, ask the Contractor in writing to limit the insurance coverage, risks and
in such a case, the parties to the Contract will agree for a mutual settlement, for reduction in
Contract price to the extent of reduced premium amount. The Contractor, while arranging the
insurance shall ensure to obtain all discounts on premium which may be available for higher volume
or for reason of financing arrangement of the project.
Seal and Signature of Contract Page 47 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
37.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional
insurance requirements for the portion of the works to be performed at the Site.
37.6 Special Conditions of Contract details out the various insurance liabilities.
38.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the
successful completion of commissioning as defined elsewhere in the Bid document.
39.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
39.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the Owner
or his authorized agents, then the Contractor shall be given due extension of time for the completion
of the Works, to the extent such omission on the part of the Owner has caused delay in the
Contractor’s performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer shall
39.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation if
such delays have resulted in any increase in cost. The Owner shall examine the justification for such
a request for claim and if satisfied, the extent of compensation shall be mutually agreed depending
upon the circumstances at the time of such an occurrence.
40.0 DEMURRAGE, WHARFAGE, ETC.
All demurrage, warfare and other expenses incurred due to delayed clearance of the material or any
other reason shall be to the account of the Contractor.
41.0 FORCE MAJEURE
41.1 Force majeure is herein defined as anycausewhich is beyond the control of the Contractor or the
Owner as the case may be, which they could not foresee or with a reasonable amount of diligence
could not have foreseen and which substantially affects the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and epidemics;
b. Acts of any Government, domestic or foreign, including but not limited to war, declared or
undeclared, priorities, guarantees, and embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the
other in writing of such causes.
41.2 The Contractor or the Owner shall not be liable for delays in performing his obligations resulting from
any force majeure cause as referred to and/or defined above:
The date of completion will, subject to hereinafter provided, be extended by a reasonable time even
though such cause may occur after Contractor’s performance of obligation has been delayed due to
Seal and Signature of Contract Page 48 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
42.0 SUSPENSION OF WORK
42.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part of the
Works without invalidating the provisions of the Contract. Orders for suspension or reinstatement
of the Works will be issued by the Engineer to the Contractor in writing. The time for completion of
the works will be extended for a period equal to duration of the suspension.
42.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension of
the works will be paid by the Owner, provided such costs are substantiated to the satisfaction of the
Engineer. The Owner shall not be responsible for any liabilities if suspension or delay is due to
some default on the part of the Contractor or his Sub-Contractor.
43.0 CONTRACTOR`S DEFAULT
43.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall refuse
or neglect to comply with any reasonable order given to him, in writing by the Engineer in
connection with the works or shall contravene the provisions of the Contract, the Owner may give
notice in writing to the Contractor to make good the failure, neglect or contravention complained of.
Should the Contractor fail to comply with the notice within thirty (30) days from the date of serving
the notice, then and in such case the Owner shall be at liberty to employ other workmen and
forthwith execute such part of the works as the Contractor may have neglected to do or if the Owner
shall think fit, without prejudice to any other right he may have under the Contract to take the work
wholly or in part out of the Contractor’s hands and re-contract with any other person or persons to
complete the works or any part thereof and in that event the Owner shall have free use of all
Contractor’s equipment that may have been at the time on the Site in connection with the works
without being responsible to the Contractor for fair wear and tear thereof and to the exclusion of
any right of the Contractor over the same, If the sum that the contractor is entitled to be paid plus
the costs incurred by the Owner in completing the works, exceeds the Contract Price or the entire
works if entire works have been completed or the price for part of the work if part of the works
have been completed, the Contractor shall be liable for such excess.
If such excess is greater than the sums due to the Contractor, the Contractor shall pay the balance to
the Owner and if such excess is less than the sums due to the Contractor, Owner shall pay the
balance to the Contractor. For facilitating such payment, Owner shall pay the balance to the
contractor. For facilitating such payment, Owner shall encash the Bank Guarantees of Contactor
available with Owner/s and retain such other payment due to the Contractor under the Contract in
question or any other Contract that the Owner/s may have with the Contractor. Such payment of
excess amount shall be independent of the liquidated damages for delay which the Contractor shall
have to pay if the completion of works is delayed.
43.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his liability to
pay liquidated damages for delay in completion of Works as defined in Clause 14.0 of this Section.
43.3 Such action by the Owner as aforesaid the termination of the Contract under this clause shall not
entitle the Contractor to reduce the value of the Contract Performance Guarantee nor the time
thereof. The Contract Performance Guarantee shall be valid for the full value and for the full period
of the Contract including guarantee period.
Seal and Signature of Contract Page 49 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
44.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
44.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons other
than those mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in such an event
give fifteen (15) days notice in writing to the Contractor of his decision to do so.
44.2 The Contractor upon receipt of such notice shall discontinue the work on the date and to the extent
specified in the notice, make all reasonable efforts to obtain cancellation of all orders and Contracts
to the extent they are related to the work terminated and terms satisfactory to the Owner, stop all
further sub-contracting or purchasing activity related to the work terminated, and assist Owner in
maintenance, protection, and disposition of the works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and
reasonable, dictated by the circumstances prevalent at the time of termination.
44.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies
and if the Contractor is a partnership concern and one of the partners dies then unless the Owner is
satisfied that the legal representatives of the individual Contractor or of the proprietor of the
propriety concern and in the case of partnership, the surviving partners, are capable of carrying out
and completing the Contract the Owner shall be entitled to cancel the Contract as to its incomplete
part without being in any way liable to payment of any compensation to the estate of deceased
Contractor and/or to the surviving partners of the Contractor’s firm on account of the cancellation
of the Contract. The decision of the Owner that the legal representatives of the deceased Contractor
or surviving partners of the Contractor’s firm cannot carry out and complete the Contract shall be
final and binding on the parties. In the event of such cancellation the Owner shall not hold the estate
of the deceased Contractor and/or the surviving partners of the estate of the deceased Contractor
and/or the surviving partners of the Contractor’s firm liable to damages for not completing the
45.0 FRUSTRATION OF CONTRACT
45.1 In the event of frustration of the Contract because of supervening impossibility in terms of Section
56 of the Indian Contract Act, parties shall be absolved of their responsibility to perform the balance
portion of the Contract, subject to provisions contained in sub-clause 45.3 below.
45.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except for
reason of willful or flagrant breach by the Owner) and/or Contractor then the works under the
Contract shall be suspended.
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing to
the Contractor in accordance with the terms of the Contract within three months of the event, the
parties hereto shall be relieved from carrying out further obligations under the Contract treating it
as frustration of the Contract.
45.3 In the event referred to in sub-clauses 45.1 & 45.2 above the parties shall mutually discuss to arrive
at reasonable settlement on all issues including amounts due to either party for the work already
done on quantum merit_ basis which shall be determined by mutual agreement between the parties.
Seal and Signature of Contract Page 50 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
46.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the
Contractor or his partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any one
on his or their behalf in relation to the obtaining or to the execution of this or any other Contract
with the Owner, shall in addition to any criminal liability which it may incur, subject the Contractor
to the cancellation of this and all other Contracts and also to payment of any loss or damage to the
Owner resulting from any cancellation. The Owner shall then be entitled to deduct the amount so
payable from any monies otherwise due to Contractor under the Contract.
E. RESOLUTION OF DISPUTES
47.0 SETTLEMENT OF DISPUTES
47.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to the extent
possible, be settled amicably between the parties.
47.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the
Contractor, arising out of the Contract for the performance of the Works whether during the
progress of the Works or after its completion or whether before or after the termination,
abandonment or breach of the Contract, it shall, in the first place, be referred to and settled by the
Engineer, who, within a period of thirty (30) days after being requested by either party to do so,
shall give written notice of his decision to the Owner and the Contractor.
47.3 Save as hereinafter provided, such decision in respect of every matters so referred shall be final and
binding upon the parties until the completion of the Works and shall forthwith be given effect to by
the Contractor who shall proceed with the Works with all due diligence, whether he or the Owner
requires arbitration as hereinafter provided or not.
47.4 If after the Engineer has given written notice of his decision to the parties, no claim to arbitration
has been communicated to him by either party within thirty (30) days from the receipt of such
notice, the said decision shall become final and binding on the parties.
47.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days after
being requested as aforesaid, or in the event of either the Owner or the Contractor being dissatisfied
with any such decision, or within thirty (30) days after the expiry of the first mentioned period of
thirty days, as the case may be, either party may require that the matters in dispute be referred to
arbitration as hereinafter provided.
48.0 Arbitration Clause
FOR WORKS CONTRACTS & COMPOSITE CONTRACTS
(1) Amicable Settlement
Any dispute, difference, controversy or claim between the Parties arising out of or relating to
this contract with reference to the construction, interpretation, breach, termination or
validity thereof (hereinafter referred as "the Dispute") shall, upon the written request of either
Party be referred to the authorized representatives of the Disputing Parties for resolution. The
authorized representatives shall promptly meet and attempt to negotiate in good faith a
resolution of the Dispute within thirty days of the service of the request.
Seal and Signature of Contract Page 51 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
(2) Arbitration
If the parties fail to amicably resolve the disputes or differences or contrary claims as
indicated herewith in sub clause (1) of Clause, arising under or in connection with the
present works contracts, whether pertaining to works contracts alone or works and
procurement both, the same shall be referred to arbitration under the Gujarat Public Works
Contracts Disputes Arbitration Tribunal Act, 1 992."
49.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every two months, a statement covering payments claimed
and the payments received vis-a-vis the works executed, for reconciliation of accounts with the
Owner. The Contractor shall also prepare and submit a detailed account of Owner Issue materials
received and utilized by him for reconciliation purpose in a format to be discussed & finalized with
the Owner before the award of Contract.
50.0 RELATIONSHIP WITH EMPLOYEE
Every bidder at the time of submission of bid give an declaration as under
If in any bidder company / firm the interest (i.e. shareholding in company and share in partnership firm)
of any employee of the tendering company or his/her relative as defined in section 2(77) of company’s act
2013 in 10% or more the tendering company will not deal with such company or firm at all
Tenderer therefore must specifically disclose this fact in his technical bid. Non disclosure of such fact
would immediately disqualify the tenderer for further dealing with the tendering company.
51.0 CONFLICT OF INTEREST AMONG BIDDERS/AGENTS
As approved by GUVNL B R No. 95 121 20/1951 dt 12.3.2023 to incorporate clause regarding “ Conflict of
interest “ in tender of works.
A bidder shall not have conflict of interest with other bidders for particular quoted item. Such conflict of
interest can lead to anti-competitive practice to the detriment of procuring entity’s interests. The bidder
found to have conflict of interest shall be disqualified. Bidder may be considered to have a conflict of
interest with one or more parties in bidding process for particular quoted item if, only on base of context
covered in earlier instruction will remain unaltered.
Every bidder should at the time of submission of bid give a declaration that bidder shall not have conflict
of interest with other bidders for particular quoted item as above.
Date: Superintending Engineer (AM)
(Signature of Contractor) GETCO,C.O., Anjar
Seal and Signature of Contract Page 52 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
GENERAL CONDITION
A. GENERAL TERMS :-
1. The Gujarat Energy Transmission Corporation Limited does not bind itself to accept the lowest or any
tender. The Superintending Engineer (AM), Anjar reserves the right to reject any or all tender
without signing any reasons whatsoever and decision of the The Superintending Engineer (AM),
Anjar will be final and unchallengeable.
2. In case of any dispute / doubt, the decision of The Superintending Engineer (AM), Anjar shall be
unchallengeable, final and binding to the Contractor.
3. Tender offer without payment of E.M.D/Tender Fee, required Certificate, Documents, bar chart list of
Tools, Tackles, Equipments, blank tender etc. required for execution of job will be out rightly rejected.
The tenderer should furnish details of past experience of such job of similar nature completed by him
satisfactorily within the time limit in GETCO without this certificate offer shall be rejected out rightly.
4. The competent authority can delete any items in schedule of the tender, if he feels that the rate quoted
by contractor act. That item is abnormally high completed to the estimated rates. Specification in any
items mentioned in tender are subject to change without any prior notice and binding to the
B. GENERAL TERMS FOR CONTRACTOR :-
1. The erection work should be carried out according to the specification and as per Instructions &
programmed laid out by the DE / Executive Engineer-in-charge of the work. Contractor has to co-
ordinate E.I.C. of planning of outage & work schedule thereof, so as to complete all the planned work in
outage. Contractor has to deploy adequate manpower accordingly.
2. The contractor should appoint supervisor with sufficient qualification and experience who could
supervise the execution of work throughout. He should always be present on the site as far as possible.
Qualification & experience certificate of deputed supervisor to be submitted to GETCO.
3. The dismantling/erection work should be commenced immediately from the date of receipt of
instructions from office and should be completed within thereafter. Prior intimation in writing for
starting the job will be given by GETCO for the work.
4. The contractor shall see the line route before quoting the rates.
5. The Contractor has to follow all IE rules, Insurance rules, GETCO rules labours laws, safety rules and
regulations at his risk & cost. The GETCO does not take any responsibility in case of accident or injury
to the workers. The safety / security of men, materials & equipments shall be sole responsibility of the
contractor. Contractor will abide by and fulfill all the terms and conditions and general terms and
condition of the contract for works available in the office. All other general terms and conditions as
prevailing in the GETCO shall be applicable to this contract. The contractor will be governed by the
GETCO’s general conditions of works contract. The Booklet will be available in the concerned office in
any working days. In the event of placing order, the contractor will have to sign this booklet along with
other documents and agreement. All the usual terms and conditions of the GETCO, though the same
might have not been mentioned in this specification or contractor booklet will applicable to this
contract, and the decision of the Executive Engineer (AM), Bhuj shall be binding on the contractor.
6. The bidder shall have the experience of erection line should be as mentioned in Technical/Commercial
7. The tenderer should quote for complete erection work, testing and commissioning of line as indicated
in the Schedule “B” and as per terms and conditions.
8. It will be bidder sole responsibility for erection of complete line in all respect, accordance with latest
rules under Electricity Act and approved by Electrical Inspector.
9. Above terms and conditions are part and partial of tender and will be observed
10. The Contractors has to engage required strength of skilled persons for Transportation, Loading &
unloading work and proper Supervisor to avoid complication & unnecessary delay to complete work
Seal and Signature of Contract Page 53 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
timely. The Contractor will be totally responsible for labour claims arising out of the labour employed
11. The detailed drawings of equipments can be seen from concern GETCO office during any working day
and the equipments which are to be erected can also be seen physically at Anjar store during any
working day and time.
12. Contractor has to ensure safe shifting and erection of all accessories / equipments as per standard
13. The Contractor has to arrange for minor fabrication (if required) at free cost. The tender includes all
minor accessories and items of work which may not have been specifically mentioned in the
specification schedule etc. but are essential for completion of work. The contractor will not be eligible
for any extra payment in respect of such minor accessories and items of work.
14. The contractor has to co-ordinate & co-operate fully with Engineer-in-Charge and commissioning
Engineer of the supplier for erection of all equipments / structure / accessories, etc., and any other
items which are not conveniently included in the specification but requires for completing the job.
15. The Contractor has to remain in contact in close days with Engineer in charge of work who in turn shall
issue detailed instruction for the commencement of the work.
16. The Contractor will be solely and responsible for any accident / damage either to equipments or any
human being during the time of execution of work.
17. Either you or your authorized person should contact our concern S/Dn as well Div. office, Bhuj daily, for
the availability of equipments required for this work, failing to which this work order shall be
terminated without giving any notice.
18. The Contractor will have to give indemnity bond to GETCO against any possible claim of compensation
for damage to contractor’s equipments or staff or any of third party during the execution of work.
19. The Contractor will have to complete entire job as per directive and instruction of Engineer in charge. If
he fails to do so entire work will be carried out at Contractor’s risk and cost.
20. The contractor has the experience of survey work and produces the list of survey instrument and bio-
data of Supervisor / Surveyor / Engineer / Technician to be engaged for the job.
21. If the work is required to be carried out during specified outage then the contractor has to deploy
adequate man power, material, tools etc. well advance and has to complete the entire work during this
specific outage period only, failing to which GETCO shall be at liberally to deduct the amount of revenue
loss due to prolong outage. Contractor has to co-ordinate E.I.C. of planning of outage & work schedule
thereof, so as to complete all the planned work in outage.
22. If required by GETCO you shall have to provide free to & for traveling facility to our field Engineer or
Surveyor for the work.
23. The Contractor shall not refuse to execute the work order at any time and it will be his sole
responsibility to execute and complete this work as per the instruction of Engineer - in - charge.
24. The tender shall invariably furnish a monthly average erection capacity (in km. and rating) along with
list of available machinery, tools and tackles etc. for erection of line.
25. The tenderer shall not submit offer for erection or foundation work.
26. No subcontractor, Power of Attorney shall be allowed.
27. Any excess work done beyond specification and drawing shall be at Contractor’s risk and cost.
28. During the stringing work of line if any EHT / 11KV / L.T. line comes on the way the Contractor has to
dismantle, restringing, kept on original position etc. work to be carried out. No any charges will be paid
extra for this work. Further work to be carried out in co-ordination with concern DISCOM personnel for
proper identification of feeder / LT line as well as you have to strictly observed all the safety rules of
29. The bidder shall specifically note that GETCO will not pay any extra amount to wards any type of claim
except for the description indicated in Schedule “B’. The party has to carry out all other / additional
required activities / work as directed by Engineer in charge which is not mentioned in Schedule but
Seal and Signature of Contract Page 54 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
required to be completed as per the site condition and for this work no extra Payment shall be made by
30. In addition to the general of the construction particular attention shall be paid to the final finish and
every effort shall be made to have the entire work contented wish standard of workmanship by the
31. No any idling / gang mobilization charge will be paid by GETCO in any circumstances.
32. No part rate or reduces rate shall be allowed in final bill.
33. The interpretation of specification doubts etc: - In case of any doubts about what is mentioned in
specification or schedule or elsewhere, the tenderer should get all doubts cleared from the Department
in writing and in advance of filling in the tender. In case of difference of opinion about interpretation of
specification etc. the decision of Ex. Engineer (AM). Bhuj/ SE(AM), Anjar will be final and shall be
binding to the contractor to the tenderer.
34. Power supply should be arranged by contractor at his own cost. For that temporary connection to be
obtain by contractor from PGVCL for the said work.
F. SIGNING AGREEMENT:- The Contractor will have to sign an agreement as per GETCO’s rules in the
prescribed form of the GETCO. The cost Rs. 300/- of the Stamp Paper will have to be borne by the
G. PENALTY FOR DELAY:
1. If it is found that the work is unsatisfactory or not progressing as per the program / BARCHART /
Target period, any action taken by the GETCO, as may be deemed fit, to see that work is completed as
required by the GETCO, would be at the risk and cost of the contractor. If the work is not completed
within time limit penalty of 1/2 % of the delayed work per week will be levied, Maximum 10% of order
value unless time quotation as granted for valid reasons by the competent authority.
2. Any delay causing extension of outages shall be contractor’s responsibility and appropriate amount (in
term of Rupees) as decided by Ex. Engineer (Const)/(TR) shall be recovered from Contractor’s bill as a
H. GUARANTEE: - It is the responsibility of the contractor to handover the complete work free of all
defects. If within a period of one year from the date of handing over the work it is noticed that any
defects occurs due to bad workmanship. It is the duty of the contractor to rectify / replace the same at
his own cost. If within seven days from the date of receipt of such notice, the contractor does not take
up the work, same will be carried out at his risk and cost.
I. WORKING DAYS: In case, it is not possible for the contractor to continue, the work either due to heavy
rains or other reasonable causes, such facts should be immediate reasons to the notice of the Executive
Engineer in writing. If the reasons for stopping the work are genuine, the Engineer may ask the
contractor in writing to stop work be cases (for such stoppage) are overcome and the Engineer will ask
the Contractor to start the work again in written, the period of such stoppage will not be considered as
a part of working month moreover the contractor cannot claim compensation for such work. Contractor
will not allow to work after working hours except in special case, if any.
J. TERMS OF PAYMENT:
1. Normally, one R.A. Bills will be paid every month, however, looking to the progress of the work it will
be reviewed mutually and 90% of the cost of work done will be paid to the Contractor on his
presentation of R.A. Bill giving the material account thereof. Remaining 10% Payment will be made
after the entire work is completed satisfactorily in all respect. The payment will be made through
Account Payee Cheque. The Bill should be submitted to EE(AM) Bhuj. Final bill will be prepared by
Concern Executive Engineer (AM) within about fortnight from the date of completion of the work by
the Contractor.
2. The GETCO will be untitled to deduct directly from the bills to be paid to the contractor any sum or
sums payable by you and which sum/sums the GETCO is required to pay as principle employers on
account of your default in respect of all liabilities referred to in above clauses.
Seal and Signature of Contract Page 55 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
3. In case of any farmer's objection / ROW, contractor has to mobilize his all efforts to clear the objection
in consultation with GETCO authority. No extra Charge will be paid for such effort.
4. The contactor shall co-operative with the GETCO in recording measurement etc. as expeditiously as
possible and he shall fulfill all the requirement which are necessary to finalizes the accounts on the
basic of its records and pay him such amounts as if found due to him, together with the amount of
security deposit if any remaining payable to him after deduction there from the amount due by him to
the GETCO. The GETCO shall not entertain further claim from thereafter.
5. THE GETCO shall deduct the Income - Tax & Taxes as per prevailing rules from each and every bill.
6. All the bills for erection, separately for each line should be presented with the following information on
(i) 90% bills for erection should be serially numbered giving the work done under each item up to
period of billing, work done for which the claim is made in the bill and up to date work so for done.
Items in erection bill should correspond to items mentioned in schedule of A/T.
(ii) Balance payment bills should be prepared at the end of the job for each line section under the
jurisdiction of the concerned Deputy Engineer which should give the complete information of work
carried out, total payment due, actual payment received up to date and the balance amount claimed, It
should also accompany a statement of reconciled material account tower wise and line wise.
7. 10% retention money will be deducted from each R.A. bill.
8. No higher rate or revised rate will be applicable for the work, if work is held-up / closed due to
whatever so reasons.
9. R.A. Bill shall be paid if GETCO satisfy with the output of works otherwise only final bill shall be paid.
10. The cost of damages, if any will be recovered from the Contractor’s bill. The assessment of which will be
done by field Engineer at his sole discretion and his decision shall be binding to the contractor and shall
be considered as final and unchallengeable.
11. The contractor shall co-operate with the GETCO in recording measurement etc. as expeditiously as
possible and he shall fulfill all the requirements which are necessary to finalize the accounts on the
basis of its records and pay him such amount as if found due to him together with the amount of
security deposit. If any remaining payable to him after deduction there from the amount due by him to
12. The contractor will not be eligible for any extra payment in respect of minor accessories and items of
K. AVAILABILITY OF MATERIALS AND IDLE LABOUR CHARGE: Materials are readily available and
arrangement made to procure the rest. However, the Contractor should be carrying out the work as and
when the materials are received. No idle labour charges will be bourned by the GETCO in case such
occasion of idle labour arises, due to want of any materials. However, this idle period will be counted
for the period of assessing the time limit for completion of work as mentioned in the work order.
Contractor has to collect the material as and when available and should be keeping in his safe custody.
L. PROGRESS OF WORK & REPORTING :
1. Contractor has to submit their working schedule along with tender to complete the line in view of time
limit given in tender Bar chart is also to be submitted.
2. PROGRESS REPORT: Fortnightly progress reports in DUPLICATE shall be regularly submitted to the
Executive Engineer (AM) Bhuj and the concern Engineer-in-charge with a copy to SE, (AM) Anjar.
Bar chart duly signed by contractor shall be submitted at the time of commencement of work.
M. MATERIAL, DELIARY & HANDLING :
1. All material / equipment required for this work as per schedule shall be delivered at any store center of
Anjar jurisdiction & contractor has to take delivery from these stores at his own cost only.
2. The contractor shall be responsible for breakages, losses & thefts of material during transit or erection
after the materials are issued from stores will, the completed work is taken over by the GETCO.
3. The contractor will be responsible for loss, distribution or deterioration of the materials, stores or
articles supplied to him by the GETCO, even if such a less distribution of deterioration has occurred
Seal and Signature of Contract Page 56 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
under any circumstances whatsoever beyond his control as if the materials, stores or articles so
supplied were his property.
4. STORAGE-CUM-INSURANCE:- The contractor shall take suitable storage-cum-erection insurance
cover at his cost to the extent of 100% cost of s/s or line materials, which are required to complete the
s/s or line. Contractor shall have to take Marine cum Erection (MCE) insurance policy against any loss,
damage, theft, pilferage, fire etc. for the complete period of storage, erection and commissioning up to
the time of taking over of the transmission line or S/S by the Board. The contractor shall deal directly
and pursue the claim with the insurance company and shall be responsible in regard to maintenance of
all insurance coverage as well as for settlement of claim. The proof of insurance policy taken by the
successful contractor shall be furnished to Engineer-In-Charge.
No material shall be issued to bidder/erection agency in absence of such insurance policy. The risk shall be
covered for lifting of material from store to final handling over to GETCO. Further In absence of the
above insurance policy, R. A. Bill payment will be with held.
5. RETURN OF EMPTY CONDUCTOR DRUMS: The empty wooden drum of earth wire and conductor as
well as insulator crates will not be required to be returned back by the contractor to the GETCO stores.
6. ACCOUNTING OF GETCO MATERIALS: - The contractor will be fully answerable and responsible for all
the material issued to him for the work by the GETCO for any theft, loss of pilferage and shall have to
furnish account for the same after completion of the work and before preparation of final bill, If the loss
referred to above is not made good before final bill as per rules of the GETCO. Contractor has to
maintain Site Register Material Account Register regularly.
7. The structure & equipment required for line erection work shall be delivered at central store by GETCO
at free of cost and it must be shifted to site without damaging the equipment must be kept in position as
per instruction of In charge Engineer and Manufacturer’s manual. The M.S. Girder required for line
erection work will be provided at one end of the line by GETCO. The trip of Girder should be of
minimum 20 Girders.
8. The Contract has to shift the material at site with packing case and it should open carefully without
damaging the equipment. The packing case must be returned to the store in good condition and stacked
as directed by Engineer-in-charge.
9. The equipments must be cleaned, washed if required before erection. The initial testing wherever
required should be carried out first with the help of Engineer-in-charge before erection, such as
measuring continuity test or any other test found necessary.
10. THE GUJARAT ENERGY TRANSMISSION CORPORATION LTD. shall supply Steel Section required, for
earth mesh / structure / G.I. / M.S. strip for earthings the equipments structures with nut and bolts,
power cable, control cable, L.T. cable, Clamps connectors and C.I. Plate for small pit etc. at free of cost
subject to condition mentioned in schedule-B.
11. Wooden charcoal, salt, black cotton soil, G.I. pipe, G.I. strip, G.I. wire, nut & bolts lugs etc. required for
earthing shall be procured by the contractor as per specification given is Schedule B.
12. Contractor will fully and solely responsible for any shortage, damage, leakages to the equipments or
any it’s accessories that may occur during transportation dragging, draining of oil, erection work etc.
13. In case of non - availability of some items / materials you will have to collect the same from other
nearly store center for which you shall be paid as per GETCO’s rules and S.O.R. rate.
14. After completion of the work, all the surplus materials issued by the GETCO shall be returned by you to
the respective center of the GETCO as per instruction of Engineer in charge at your cost.
15. For shortages of any materials issued by the GETCO for the work, recovery shall be made from you, on
the basis or prices of the materials (prevailing the date of settlement of materials Account) plus 15%
supervision charges.
16. All the materials issued by GETCO shall be transported to the work site on same day and to be
preserved in safe custody failing to which GETCO shall initiate Police actions, similarly as per
Seal and Signature of Contract Page 57 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
instruction of Engineer-in-charge, you have to credit the material at GETCO store without any loss of
time failing to which GETCO shall initiate Police action.
17. Accounts of Materials issued :- The contractor shall have to maintain accurate day to day and item
wise account of use of issued materials which shall be got checked from time to time by the
representative of the GETCO. The contractor will be responsible for custody and preserving the issued
materials till the work is handover by the Contractor after completion.
18. The contractor has to maintain site Register, covering all the daily details of Material receipt &
utilization, progress of work etc. This register shall be checked and signed by Engineer in charge,
Executive Engineer (AM), Bhuj & SE (AM), Anjar during the site visit. Any bill without site register
shall not be passed. The GETCO shall not entertain further claim from thereafter.
1. No tools, tackles, manpower, crane facilities etc. will be provided by the GETCO.
2. No special tools and tackles such as compression joint machine, jointing dies, come along clamps,
dynamo meter etc. shall be given by GETCO.
3. Erection tools required during construction of lines shall be arranged by the contractor at his own cost.
Adjustable stub templates will however be supplied by the GETCO which shall be returned by the
contractor in Good condition on completion of the works.
4. Contractor will have to make his own arrangement for all tools, tackles, wire ropes etc. for the work.
5. The contractor has to submit the list of tools, tackles, equipments with him along with his tender offer.
The tender without this list and other required documents (as mentioned above herein the tender)
should be rejected out rightly.
O. ELECTRICITY RULES : All works shall be carried out in accordance with the revised and latest
providing under Indian Electricity Act and Rules made the rounder.
P. WASTAGE: You shall make every effort to minimize the breakage/Looses and wastage of line
materials, etc. supplied “Free of cost “by the GETCO for erection of line.
The ceiling for wastages permitted is as under :-
i) Conductor and Earth wire. : For jumpering/sag/sister wire: 0.5%
: For credit length up to 30 Mtr.: 0.5%
: For credit in pieces as good conductor from 30 Mtr. to 100 Mtr:
ii) Insulators. : 0.25%
iii) Bolts & Nuts : NIL (No extra Bolts/Nuts will be supplied).
v) Hardware & Accessories. : NIL.
Q. INSPECTION BY GETCO REPRESENTATIVES:
The Engineer-in-charge, higher authority of GETCO or his representatives will be free to visit the
contractor’s work, their stores site and erection sites and also verify the GETCO’s materials in the
custody of the contractor as and when required.
R. FORCE MAJURE :-
1. Force majored is defined as “Any cause which is beyond control of contractor or the GETCO as the case
may be, natural phenomena like floods, draught, - earthquake, epidemics etc. acts of any Government
Authorize domestic or foreign including but not limited to war, declare or undeclared, priorities
quarantine, embargoes Licensing control or production or distribution restrictions accidents like Fire,
Explosions, Break-Downs etc.”.
2. All legal complication or disputes are subject to Anjar jurisdiction only.
3. As the case may be, which they could not foresee or with a reasonable amount of diligence could not
have foreseen and which substantially affects the performance of the contract such as:
4. Natural phenomena including but not limited to floods, droughts, earthquakes and epidemics;
5. Acts of any Government, domestic or foreign including but not limited to war, declared or undeclared,
priorities, guarantees and embargoes.
Seal and Signature of Contract Page 58 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
6. Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the other
in writing of such causes.
7. The contractor or the owner shall not be liable for delays in performing his obligations resulting from
any force majeure cause as referred to and/or defined above.
S. QUANTITY OF WORK : The quantities of various items of erection indicated in Schedule-B are
tentative, final quantities shall be determined after completion of the details route surveys. The
contractor has to carry out the work according to quantities as determined at site for which the rates
quoted in the Tender shall be valid. The department reserves the rights for revising or omitting any of
the quantities. The quantities actually executed by the contractor will be calculated at the rate given in
the contract schedule of the rates. The payment shall be made only on actual work executed or order
quantity whichever is less.
T. TAKING DELIVERY AND INSURANCE:
1. As regard damage the materials, equipment and worker of the contractor, he himself will be
responsible. If there is any compensation to be paid in respect of “WORKMAN” compensation act of any
other statutory provisions, the same will have to be paid by the contractor direct. If he thinks fit he may
take necessary insurance cover, at his cost.
2. The contractor has to keep ‘H’ frame materials & line materials in safe custody and transport to
the respective sites and will be fully responsible for any damage to or loss of all materials at
any stage during transportation or erection or taking over of the line by GETCO.
3. The Contractor has to open site store near by the route of the line and ensure for safe custody
of all the stored materials at his own cost.
4. The contractor shall have total responsibility for the entire materials stored, loose, semi
assembled and/or erected by him at site in his custody. The contractor shall make suitable
security arrangement at his own cost to ensure the protection of all materials, equipment and
works from theft, fire pilferage and any other damages and loss. It shall be the responsibility of
the contractor to arrange for security till the works are finally taken over by the corporation.
5. EQUIPMENT INSURANCE: - Contractor shall have to take comprehensive insurance policy
against any loss, damage, theft, pilferage, fire etc. to the material for the complete period of
erection and commissioning up to the time of taking over of the Sub Station / transmission line
by the GETCO. The contractor shall deal directly and pursue the claim with the insurance
company and shall be responsible in regard to maintenance of all insurance coverage as well as
for settlement of claim. The proof of insurance policy taken by the successful contractor shall
be furnished to Engineer-In-Charge. In absence of the above insurance policy, R. A. Bill payment
will be with held.
6. In the event of any damage, theft, loss, pilferage, fire etc. contractor will be responsible to
lodge, pursue and settle all the claims with the insurance company for all items, materials and
the corporation shall be kept informed about it. Contractor shall replace the lost/damaged
materials/items promptly irrespective of the settlement of the claims by underwriter and
ensure that the work progress is as per agreed schedule. The loss, if any, such replacement will
have to be borne by the contractor and Board will not entertain any claim/representation in
this regard. However it will be contractor’s responsibility to insure the entire project till the
line is taken over by the Board.
U. DEPARTURE FROM SPECIFICATION AND DRAWINGS:- Should the tenderer wish to depart from the
specification in any respect, they should draw attention to such departure giving his reasons thereof
and should get approved the same before doing any further work, unless this is done this specification
shall held good. The working drawings are attached with the tenders. However in case of any
clarification the decision of Engineer in charge will be final & binding to the Contractor.
Seal and Signature of Contract Page 59 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
V. TESTING AND COMMISSIONING :
1. The contractor after completion of erection work will ensure that all works connected with line have
been completed correctly as per Indian Electricity Rule and procedure, any extra cost involved due to
incompleteness of work or bad workmanship found out subsequently shall be set right forth with by
the contractor at his cost. The clearances at major crossing & earthing resistance value of H-frame /
tower footing to be taken & data to be handed over to EIC.
2. After the erection is completed in all respects, the line should be thoroughly patrolled and checked for
continuity and clearances. The line should be meggered to check its insulating level. Afterwards, a line
clear should be given to the Engineer-in-charge that the line is clear and free of men and materials and
is fit to be charged. If on charging the line is found not to hold, the contractor should arrange to patrol
the line and find out the causes for the tripping and rectify the defects.
W. TECHNICAL PARTICULARS : The general technical details of the type of towers to be erected
conductors and earth wire to be strung and relevant loading particulars for the same are given in
section of the specification.
X. PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over by the
Engineer. No claim will be entertained by the Owner or by the Engineer for any damage or loss to the
Contractor’s works and the Contractor shall be responsible for complete restoration of the damaged
works to original conditions to comply with the specification and drawings.
Y. EMPLOYMENT OF LABOUR
1. The Contractor will be expected to employ on the work only his regular skilled employees with
experience of his particular work. No person below the age of eighteen years shall be employed.
2. All traveling expenses including provisions of necessary transport to and from Site, lodging, allowances
and other payments to the Contractor’s employees shall be the sole responsibility of the Contractor.
3. In case the Owner becomes liable to pay any wages or dues to Labour or any Government agency under
any of the provisions of the Minimum Wages Act, Workmen Compensation Act, Contract Labour
Regulation Abolition Act or any other law due to act of omission of the Contractor, the Owner may make
such payment and shall recover the same from the Contractor’s bills.
3. FACILITIES TO BE PROVIDED BY THE CONTRACTOR
4. Tools, tackles and scaffoldings
The Contractor shall provide all the construction equipments; tools, tackles and scaffoldings required
for pre-assembly, erection, testing and commissioning of the equipment covered under the Contract.
He shall submit a list of all such materials to the Engineer before the commencement of work at Site.
These tools and tackles shall not be removed from the Site without the written permission of the
The Contractor shall provide necessary first-aid facilities for all his employees, representatives and
workmen working at the Site. Enough number of Contractor’s personals shall be trained in
administering first-aid.
6. Cleanliness The Contractor shall be responsible for keeping the entire area allotted to
him clean and free from rubbish, debris etc. during the period of Contract. The Contractor
shall employ enough number of personnel to keep the work area clean. Materials and
stores shall be so arranged to permit easy cleaning of the area. In areas where equipment
might drip oil and cause damage to the floor surface, a suitable protective cover of a flame
resistant, oil proof sheet shall be provided to protect the floor from such damage.
7. LINES AND GRADES All the works shall be performed to the lines, grades and elevations
indicated on the drawings. The Contractor shall be responsible to locate and lay-out the works. Basic
Seal and Signature of Contract Page 60 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
horizontal and vertical control points will be established and marked by the Engineer at site at
suitable points. These points shall be used as datum for the works under the Contract. The Contractor
shall inform the Engineer well in advance of the times and places at which he wishes to do work in the
area allotted to him so that suitable datum points may be established and checked by the Engineer to
enable the Contractor to proceed with his works. Any work done without being properly located may
be removed and/or dismantled by the Engineer at Contractor’s expense.
8. FIRE PROTECTION The work procedures that are to be used during the erection shall be those,
which minimize fire hazards to the extent practicable. Combustible materials, combustible waste and
rubbish shall be collected and removed from the Site at least once each day. Fuels, oils and volatile or
inflammable materials shall be stored away from the construction and equipment and materials
9. All the Contractor’s supervisory personnel and select number of workers shall be trained for fire
fighting. Enough of such trained personnel must be available at the Site during the entire period of the
The Contractor shall have total responsibility for all equipment and materials in his
custody/stores, loose, semi-assembled and/or erected by him at Site. The Contractor shall make
suitable security arrangements ensure the protection of all materials, equipment and works from
theft, fire, pilferage and any other damages and loss.
11 PRE-COMMISSIONING TRIALS AND INITIAL OPERATIONS
The pre-commissioning trials and initial operations of the equipment furnished and erected by the
Contractor shall be the responsibility of the Contractor as detailed in relevant clauses of Technical
Specifications. The Contractor shall provide, in addition, test instruments, calibrating devices, etc and
labour required for successful performance of these trials. If it is anticipated that the above test may
prolong for a long time, the Contractor’s workmen required for the above test shall always be present
at Site during such trials.
SPECIAL TECHNICAL CONDITION:_
SPECIFICATION FOR REPLACEMENT CONDUCTOR/ EARTHWIRE ON TRANSMISSION LINE
1. RIGHT OF WAY, WAY LEAVE, TREE CUTTING AND OTHER OBSTRUCTIONS
1..1 All statutory clearances and permissions from various statutory bodies / Govt. authorities like
forest Department, Railway, Aviation Authority, Maritime GETCO, National High Way Authority,
right of way and way leave etc. wherever required along the entire route of the transmission line
shall be arranged by the GETCO.
1.2 The successful bidder shall have to also arrange for Right of Way and tree clearance. The
contractor should immediately clear any obstructions or hindrance from local villagers or the
local authorities in the execution of the work so that there is no delay in execution/completion of
various activities and awarded work is completed in the schedule completion period in
consultation with GETCO EIC.
1.3 For clearances, permissions etc. from various authorities, the Contractor shall not remain
contended by simply informing the GETCO, but shall invariably assist and arrange for personal
follow up to overcome the difficulties in the interest of progress of the work.
Seal and Signature of Contract Page 61 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
1.4. The contractor shall instruct his labours and staff to use minimum area while doing the work
where there are standing crops. No persons of the contractor should pick up any items from the
standing crops or fruit. The contractor should take all possible steps to avoid or minimize
damages to the standing crops.
1.5. For necessary forest clearance, the processing will be done by the GETCO and the payment to the
central government/state government for compensation of forest clearance will be paid by the
GETCO as necessary.
2. ACCESS TO LOCATIONS/USE OF PRIVATE ROAD/APPROACH ROAD TO SITE:
2. 1 It will be the contractor's sole responsibility to take the materials up to the location in path way,
temporary road, temporary bridge required will have to be provided by the contractor at his own
cost. If, for any reasons the above is not feasible, the contractor at his own cost shall have to arrange
transportation of line materials by head loads.
2..2 The contractor will be deemed to be very well familiar with the route of the transmission line before
giving the offer. Notwithstanding the difficulties of terrain, location, approaches, way leave and
other obstructions the price quoted for all the items covered in the tender shall not undergo any
change at any stage or shall be granted by the GETCO for any special rates/consideration.
2. 3. The Contractor shall have to make necessary arrangement/permission for use of
private/forest/canals for transportation of materials, construction crew and tools at his own cost.
Any charges levied by the concerned parties/authorities for use of such road etc. shall be born by the
3 REMOVAL/ DISMENTALLING OF OLD LINE MATERIAL:
3.1 Before commencing the stringing work conductors, Hardware, insulators hard wares and conductor
accessories of old line shall be removed from the existing tower / h-frame structures. Contractor
shall check the towers / H-frames for its safety for execution of dismantling / stringing work.
3.2 In case of old D/C line above work including removal of conductor/ earth-wire is to be carried out
as work is to be completed in given/arranged outage.
3.3 For dismantling and stringing of Conductor, earth wire of 66 kv lines, practical difficulties if any shall
be resolved at the time of execution of work.
3.4 In case of S/C line above work is to be carried out in cold conditions during arranged / given
3.5 Necessary tools and tackles shall be used for the safety of the erection crew if the work is to be
carried out during hot line conditions.
3.6 Necessary precautions shall be taken by way of providing guys, rollers, etc for safety of towers and
work shall be executed in such a way not causing any damage to tower cross arms or tower body
or tower foundations
3.7. Any damage that may occur to existing tower / H-frames during stringing/dismantling work shall
have to be made good by the contractor at no extra cost to the GETCO, including supply of towers
/ H-frame structures or part thereof, their foundations including excavation, erection, earthing
Seal and Signature of Contract Page 62 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
etc. required for safety and satisfactory performance of the line. All such activities are to be
carried out at no extra cost to the GETCO and in a schedule completion period. No extension in
completion period shall be allowed on such account.
3.8. Dismantled / removed line material of old line shall be transported to contractors store by clearing
the site and arranging their disposal at no extra cost to the GETCO.
3.9. Contractor has to pay cost of the old-line material that is to be retained by him as per the terms and
conditions indicated in the tender specification.
4 REVENUE LOSS: The outages of the other crossing lines for stringing work should be planned in
such a manner in consultation with the Engineer in charge of the work that minimum shut down
of other power lines are required. Recovery against revenue loss to the GETCO due to time over
run of the schedule outages, will be decided by MD (Tech.) and the amount if any, on the revenue
loss account will be clubbed with penalty clause so that maximum liability towards recovery
against revenue loss and penalty shall be limited to the extent of maximum of 10% of labour
component of the contract i.e. erection part.
5.1 Before commencing of stringing work, contractor must obtain approval of sag tension charts
(these shall have to be supplied by the contractor) showing final sags and tension for various
temperature and spans. The stringing chart shall be prepared according to appended format
5.2 The Contractor shall be responsible and will take care of proper handling of drums from
stores to site. Sufficient numbers of aluminum snatch blocks shall be used for paving out the
ACSR/AAA Conductors. Necessary precautions shall be taken to avoid conductor rubbing on
the ground by providing adequate ground roller, rollers on supports. Additional rollers shall
also be provided to cross-thorny hedges, footing and other obstructions to avoid scratching of
conductor. The conductor and ground wire shall be made to sag correctly as per stringing
charts before they are finally transferred to the hard wares for conductors and to clamp for
ground wire. No joint should be made at less than 30 meters from the tower end and no joint
shall be permitted in Railway, River, road and other important crossings spans. There shall
not be more than one joint in a span of each conductor. The sag GETCO, if used shall be
adjusted to suit the sag indicated against actual temperature for an individual span. The
thermometer shall be provided at the conductor point during the stringing work.
Dynamometers shall be used in tensioning the conductors. All conductors shall be stressed to
their maximum working load at the time of stringing, as per approved stringing charts.
5.3 The minimum clearance between the lowest point of conductor and ground shall not be less
than required. All compression joints should be carefully made and a record of initial and final
lengths of the joints jointly signed by Contractor and GETCO's representatives should be
maintained. Check for sag should also be made at intervals when conductor is drawn up. Over
stressing, causing damage to towers should be avoided. Care should be exercised not to over
tension the conductor. Extra sag of 150 mm be allowed at all the important tension locations
like Railway/River Crossings.
Seal and Signature of Contract Page 63 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
5.4 After being pulled the conductor/ground wire shall not be allowed to hang in the stringing
sheaves for more than 72 hours, before being pulled to the specified sag. During the time the
conductor / ground wire is on the stringing sheaves before sagging-in, it shall be ensured that the
conductor / ground wire is not damaged due to wind, vibration, vehicles or other causes.
Scaffolding should be used to cross the important roads and Railway Crossing for minimum
interruption to traffic.
5.5 The conductor shall be pulled up to desired sag and left in serial stringing sheaves for at least one
hour after which the sag shall be rechecked and adjusted, if necessary, before clipping in and
transferring the conductors from the serial stringing sheaves to the suspension clamps.
5.6 Conductor shall be clamped within 24 hours of sagging. The sag will be checked in the larger
spans of the section in case of sections up to eight spans and in one intermediate larger span also
for section with more than eight spans.
5.7 The stringing sheaves, when suspended on the transmission structure for sagging, shall be so
adjusted that the conductor will be on the sheaves at the same height as the suspension clamp
to which it is to be secured.
5.8 The stringing of the ground wire shall be done in accordance with the stringing charts approved by
the GETCO. The ground wire shall be strung to run continuously over the conductors. The ground
wire shall be pulled, sagged and clamped-in from tension tower to tension tower before the phase
conductors are pulled in that section. In case of double circuit line, stringing of ground wire shall be
done in hot line condition i.e. one circuit on double circuit tower in live condition. For dismantling
and stringing of earth wire of 66 kv D/C lines, practical difficulties if any shall be resolved at the
time of execution of work.
5.9 All the line conductors shall be terminated at sub-station structures whose details shall be
furnished by the GETCO at the appropriate time. The contractor shall fix strain insulators on the
sub-station structures.
5.10 Armour rods and vibration dampers shall be fitted at each suspension tower before final clamping
of conductor with Insulator strings. Vibration dampers shall be fitted at each tension tower after
final clamping of conductor with insulator strings. Vibration dampers are to be fixed using
aluminum tape with each clamping bolt and in correct vertical position in relation to conductor.
Compression type joints are to be used for jointing of conductors. Each part connected with joints
shall be perfectly cleaned by wire brush and properly greased before final compression. All the
joints of conductors and earth wire shall be made in the best workmanship manner and shall be
perfectly straight and having maximum possible strength.
5.11 Proper guys shall be provided to counter balance the paving out tension of conductor/ground
wire at the tension locations, to avoid damage to towers and/or accident.
5.12 Stringing work shall mean, the activities of fixing of insulator and insulator hardware’s,
paving, jointing, tensioning, clamping with Armour-rod, providing dampers, repairing of
conductors (if any) and fixing the conductor at tension hardware’s etc. in hot line condition i.e.
one circuit in live condition for double circuit line or stringing in cold condition for single
Seal and Signature of Contract Page 64 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
6. SUPPLY OF MATERIALS BY GETCO:-
Material to be supplied by GETCO from concern GETCO store/Division or any store. Transportation
cost is to be borne by bidder. The contractor has to take delivery of materials from the GETCO’s
store/Substation to the respective tower sites and will be responsible for any damages to or loss of
all materials at any stage during the Transportation or erection. The materials that will be issued by
the GETCO will be in ‘AS IS WHERE IS’ conditions at the store centre of the GETCO in the area during
working hours days. All the materials received by the contractor shall be got insured for storages
and erection risk by the contractor at his own cost. An indemnity Bond/Bonds have to be issued by
the contractor for the materials take over by him for erection.
7. MATERIALS TO BE SUPPLIED BY THE CONTRACTOR:-Materials/Tools are to be required for work of
replacement of conductor, Insulator by SRI, Mechanical strengthening, Stub strengthening etc, which
are to be arranged by Contractor.
8. SPECIAL TOOLS :-Special tools and tackles for working others stringing materials will be arranged
9. Minor additional work at site if required is to be carried out by contractor at free cost for complete
ting the insulator
10. All the dismantled materials to be stored by contractor in safe custody. Bidder is totally
responsible for old line material storage. Material will be credited to GETCO stores by
11. Contractor shall have to compensate the board for damage of Boards property during dismantling /
removing of Old line materials from erection site.
12. Completion Period :- The Contractor has to complete the preliminary activities including joint
inspection with GETCO field staff after issue of letter of intent. As this work is of urgent nature
contractor has submit the bar chart and give completion period considering their capacity to replace
conductor with minimum outages. Contractor has to complete above work as mentioned above . No
Mobilization charge will be given to contractor for cancellation of outage or start of work.
13. The above work is to be carried strictly as per instruction of Engineer In charge.
14. Above work to be carried out on in HOT line condition replacement work under progress
nearby lines should be in charging condition. Proper safety must be taken by contractor.
15. New material will be issued to contractor from any store and Old material to be
credited by contractor at GETCO STORE
16. The contractor has to arrange for minor fabrication ( if required) at free of cost & follow all
labour laws. IE rules, safety rules, insurance rules, GETCO rules at his risk & cost.
17. The contractor should immediately notify and obstruction or hindrance from local villages or the
local authorities in the prosecution of the work to the concerned Engineer-in-charge, but should not
deal directly in the matter. The Engineer-in-charge will arrange to remove the obstacles as soon as
18. It will be the contractor’s sole responsibility to take the materials up to the locations required. Any
path way, temporary road or temporary bridge required will have to be provided by the contractor
at his cost. If for any reasons the above is not feasible the contractor at his own cost shall have to
arrange transportation by Head roads.
19. The Contractor has to deviate full men power / gangs from his routine work to site for completion of
above work in stipulated time or outage. This includes mobilization and odd hours working of their
labor for cancellation of outage or start of work.
Seal and Signature of Contract Page 65 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
20. Contractor will have to deploy adequate resource so as to complete the workwithin stipulated time
limit fixed by this office.
21. All the responsibility for stacking, stocking & preservation of material pertains to the contractor,
incase of theft or loss of material recovery shall be done as per GETCO norms.
22. All safety rules are to be strictly followed by the contractor.
23. In case of accidents to the persons engaged by the contractor, GETCO will not be responsible for any
claim/ compensation.
24. On completion of the work all surplus new SRI and old removed porcelain insulator shall be
returned by the contractor to the nearest respective stores of the GETCO as per the instructions of
the Engineer-in-charge of the works at no extra cost to the GETCO.
25. The contractor shall submit the complete material account immediately after the works is
completed and in case not late than one month of completion and Handing over of the line.
26. Site work register to be maintain strictly duly sign by your supervisor & EIC .Daily
progress report to be submitted to concern Executive Engineer /undersign. Also
contractor has to deploy permanent skilled site supervisor having enough experience and
knowledge as per scope of work with enough standard / calibrated tools & tackles with
enough required manpower as per site requirement/as per EIC.
27. MATERIALS HANDLING AND STORAGE
27.1 All the equipment furnished under the Contract and arriving at Site shall be promptly received,
unloaded, transported and stored in the storage spaces by the Contractor.
27.2 Contractor shall be responsible for examining all the shipment and notify the Engineer
immediately of any damages, storage, discrepancy etc, for the purpose of Engineer’s information
only. The Contractor shall submit to the Engineer every week a report detailing all the receipts
during the week. However, the Contractor shall be solely responsible for any shortages or damages
in transit, handling and / or in storage and erection of the equipment at Site. Any demurrage,
wharf age and other such charges claimed by the transporters, railways etc, shall be to the account
of the Contractor.
27.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of all
equipment materials received by him for the purpose of erection and keep such record open for
the inspection of the Engineer in-charge.
27.4 All equipment shall be handled very carefully to prevent any damage or loss. The equipment stored
shall be properly protected to prevent damage either to the equipment or to the floor where they
are stored. The equipment from the store shall be moved to actual location at the appropriate time
so as to avoid damage of such equipment at Site.
27.5 All electrical panels, control gears, motors and such other devices shall be properly dried by
heating before they are installed and energized. Motor bearings, slip ring, commutators and other
exposed parts shall be protected against moisture ingress and corrosion during storage and
periodically inspected.
27.6 All the electrical equipment such as motors, generators, etc. shall be tested for insulation
resistance at least once in three months from the date of receipt till the date of commissioning and
a record of such measured insulation values maintained by the Contractor. Such records shall be
opened for inspection by the Engineer.
27.7 The consumable and other supplies likely to deteriorate due to storage must be thoroughly
protected and stored in a suitable manner to prevent damage or deterioration in quality by
27.8 All the materials stored in the open or dusty location must be covered with suitable weatherproof
and flame proof covering material wherever applicable.
Seal and Signature of Contract Page 66 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
27.9 If the materials belonging to the Contractor are stored in areas other than those earmarked for
him, the Engineer will have the right to get it moved to the area earmarked for the Contractor at
the Contractor’s cost.
27.10 The Contractor shall be responsible for making suitable indoor storage facilities to store all
equipment, which require indoor storage. Normally, all the electrical equipment such as motors,
control gears, generators, exciters and consumables like electrodes, lubricants etc. shall be stored
in the closed storage space. The Engineer, in addition, may direct the Contractor to move certain
other materials, which in his opinion will require indoor storage, to indoor storage areas, which
Contractor shall strictly comply.
28. CONSTRUCTION MANAGEMENT
The field activities of the Contractors working at Site will be coordinated by the Engineer and the
Engineer’s decision shall be final in resolving any disputes or conflicts between the Contractor and
other Contractors and the tradesmen of the Owner regarding scheduling and coordination of work.
Such decision by the Engineer shall not be a cause for extra compensation or extension of time for the
29. COMPENSATION AGAINST DAMAGED CROP ETC :-
1.1 The GETCO will secure all rights or way leaves for the work. The permission for falling trees which
would obstruct the erection of line or for cutting the trees in order to obtain requisite clearance from
the ground to conductors shall be obtain by the GETCO. Trees falling within strips of 6.0 mtr. i.e.
mtr. on either side of the wire shall have to be cut and cleared by the contractors at his own cost.
Clearance where ever necessary shall be arrange by the GETCO.
1.2 The GETCO will arrange to pay compensation to owners for damage to trees, fences, crops and any
other properties required for erection work except the damages caused due to the negligence of the
contractor or his staff. The compensation for the damage due to contractor’s negligence shall have to be
paid by the contractor.
COMMERCIAL TERMS AND CONDITIONS FOR DISMENTALLING AND RESTRINGING WORK:
1.1 The work covered under this section consist of
i) Preparation of Sag tension charts and its approval from GETCO. Necessary details of spans and pole
schedule of the transmission lines shall be handed over to the successful bidder from concern field
office for preparation of sag tension chart.
ii) Taking delivery of line material from the GETCO, checking them, transporting to contractor's stores
and keeping in safe custody,
iii) To take suitable storage-cum-erection insurance,
iv) Distribution of all materials to erection site.
v) Strengthening of tower cross arms if required by fabricating and galvanizing of members and fixing
it with required size and numbers of bolts, nuts at no extra cost to the Company.
vi) Removal / dismantling of old line material such as conductors, earth wire, insulators, hard wares
conductor and earth wire accessories etc. Transporting the same to the Contractor’s stores, clearing
of work site and disposal of such dismantled material at no extra cost to the GETCO.
vii) Payment of old line material cost to the GETCO.
viii) Payment of compensation for tree cutting, crop damage, clearance of way leaves, removal of
obstructions, hindrances etc. by the GETCO.
ix) Providing and fixing of Number plates, Danger Plates, Phase plates and Circuit Identification Plates
for (D/C lines) to existing towers as per the given drawings appended with the specification.
Seal and Signature of Contract Page 67 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
x) Insulator hoisting, stringing of conductor / earth wire with providing jumpers etc. up to sub-station
gantries at both ends and making LILO arrangement with one circuit in live conditions where ever
xi) Maintaining of joint record of following activities: a) Paving of drum numbers from location to
location for ACSR conductor and earth wire. b) Compression results before and after dead end joints
& Mid span joints for conductor & earth wire including jumper cones. c) Critical ground clearances.
1.2 The successful contractor shall carry out all addition / alteration required to complete the
line for commissioning at the same rates quoted in the offer for respective item. However, no items
1.3 The GETCO will supply insulators, Conductor & earth wire hardware’s, accessories, conductor, earth
wire, etc. required for stringing of transmission line.
Guarantee of all the activities carried out from (i) to (xi) above for satisfactory operation &
performance of the line.
1.4 All works shall be carried out in accordance with the revised and latest provisions under Indian
Electricity Act and Rules made there under.
1.5 All the tools required during completion of lines shall be arranged by the contractor at his own cost.
The contractor shall only be responsible for any damage to and / or loss of his tools.
1.6 Quantities of various activities are to be executed by the contractor at the rates accepted by the
GETCO in the A/T. In case of any deviation in length of line, resulting into an increase in which
event the field officer shall obtain prior approval of the Head Office and excess quantity shall be paid
only at the accepted rate of the A/T.
1.7 The work beyond contractual ceiling amount shall be done only after Approval from the GETCO.
Additional terms & Conditions
1. The erection work should be carried out according to the specification and as per
instructions and programmed laid out by the Engineer-in-charge of the work.
2. The erection work should be commenced immediately from the date of receipt of instructions from
office and should be completed within thereafter.
3. The tender includes all minor accessories and items of work which are not have been specifically
mentioned in the specification schedule etc. but are essential for completion of work. The contractor
will not be eligible for any extra payment in respect of such minor accessories and items of work.
4. The contractor has to remain in close day to day contact with Engineer in charge of work who will
issue detailed instruction for the commencement of the work.
5. On finalization of outage contractor will be informed 01 day in advance for taking up the work.
6. On taking up the work according to outage schedule, if it will be changed according to prevailing
situation of power supply, contractor have to carry out the work as per revised schedule and nothing
will be paid extra for the same.
7. For availing outage on the line, contractor have to depute their authorized representative approved
by engineer in charge.
8. The work permit will be issued for particular period and if contractor have fail to return in time then
it will be viewed seriously and any financial loss will be thereof, it will be recovered from contractor.
9. Any safety precaution regarding required before taking up the work on the line has to be
arranged by contractor i.e. earthing on either side of locations, safety belt, helmets etc. as per
safety clause & contractor shall follow all the safety rules of GETCO.
Seal and Signature of Contract Page 68 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
10. All the safety regarding human life and as per I.E. rules is to be observed by contractor and
regarding any violation of these GETCO will not take any responsibility.
11. If required by GETCO you shall have to provide free to and fro traveling facility to our Engineer or
Technical staff for the work.
12. After completion replacement work, engineer in charge or GETCO’s responsible person will
be inspect the work and if any defect will be found then same is to be attended up to
satisfaction of engineer in charge/GETCO’s responsible person at contractor’s cost and risk.
13. The GETCO will not be liable for the infringement of rules described under work man compensation
due to injuries and accident to the work man etc. contractors have to observe and comply with
various provisions under above Act etc.
14. Contractor has to work as per line allotted by EIC, if any work will be carried out outside the scope of
instruction, the contractor is responsible for the risk and cost of un-instructed work and GETCO will
not pay any additional charges or take any responsibility for that work.
15. Contractor shall have to engaged qualified and experienced supervisor having necessary electrical
license for supervision and capable in managing work.
16. All other general terms and conditions as prevailing in the GETCO shall be applicable to the contract.
17. The contractor will have to complete entire job as per directive and instruction of Engineer in charge.
If he fails to do so entire work will be carried out at contractor’s risk and cost.
18. After completion of the work, all the surplus materials issued by the GETCO shall be returned by you
to the respective center of the GETCO as per instruction of Engineer in charge at your cost.
19. Specification in any items mentioned in tender are subject to change without any prior notice and
binding to the contractor.
20. The contractor shall not refuse to execute the work order at any time and it will be his sole
responsibility to execute and complete this work as per the instruction of Engineer in charge.
21. For shortages or damages of any materials issued by the GETCO for the work, recovery shall be made
from you, on the basis of prices of the materials (prevailing on the date of settlement of materials
account) plus 15% supervision charges.
22. The contractor has to carry out all the works in accordance with revised and latest provision under
I.E. Rules Act made there under and as per instruction of Engineer in charge.
23. All the materials issued by GETCO shall be transported to the work site on same day and to be
preserved in safe custody failing to which GETCO shall initiate Police actions. Similarly as per
instruction of Engineer in charge, you have to credit the material at GETCO store without any loss of
time failing to which GETCO shall initiate Police action.
24. No tools, tackles, manpower, crane facilities etc. will be provided by the GETCO.
25. The compliances of all Central/ State Govt. rules, safety and insurance rules etc. and that of local
body, is a must condition for the agency.
26. The contractor has to submit the list of tools, tackles, equipments with him along with his tender
offer. The tender without this list and other required documents (as mentioned above herein the
tender) should be rejected out rightly.
DISTRIBUTION OF MATERIALS :
3.1.1 The contractor has to take delivery of materials/lines materials from the GETCO’s store Anywhere
under GETCO and transport it to the respective tower erection sites and will be responsible for any
damages to or loss of all materials at any stage during the Transportation or erection. The
materials that will be issued by the GETCO will be in ‘ AS IS WHERE IS’ conditions at the store
3.1.2 centre of the GETCO in the area during working hours days. All the materials received by the
contractor shall be got insured for storages and erection risk by the contractor at his own cost. An
indemnity Bond/Bonds have to be issued by the contractor for the materials take over by him for
Seal and Signature of Contract Page 69 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
3.1.2 On completion of the work all surplus tower and line materials shall be returned by the contractor to
the nearest respective stores of the GETCO as per the instructions of the Engineer-in-charge of the
works at no extra cost to the GETCO.
3.1.3 The contractor shall submit the complete material account immediately after the works is completed
and in case not late than one month of completion and Handing over of the line.
7.5 STRINGING OF CONDUCTOR AND GROUND WIRE: Stringing of 3 Nos. of ACSR / AAAC conductor
(Dog / Panther) with hoisting of necessary insulators as per pole schedule, jumpering, binding, jointing,
providing armour rods etc. complete should be done. The rate should be quoted per route Km. Care
must be taken in handling the conductor to protect against scratches. Conductor must not be drawn
over rough or rocky ground, as it is likely to get damaged. Conductor must be drawn over ground
rollers and pulley only. It is important that the conductor be pulled to the proper tension. The
conductor will have to carry out the stringing of conductor using sag board as per instruction of
Engineer in charge to keep uniformity of sag and required clearance. All points wherever necessary will
have to be done by the contractor as per instruction of Engineer in charge. Vibration Damper and bird
guards are to be fixed wherever indicated by the Executive Engineer. The joints shall be compression
type. The portion of the conductor to be joined will be thoroughly cleaned and shall be coated with
special anti-corrosive or anti oxide compound.
7.5.1 The sleeves should be adequately pressed for joints shall be reduced to the minimum on the whole
length of the line. At straight joint jumper shall be connected by parallel groove clamps, inside of
which shall be cleaned and coated with anti corrosive compound.
7.5.2 On crossing of truck road and railways, double making dead end and mid span jointing wherever
7.5.3 The compressor machine is to be arranged by contractor.
7.5.4 The details of conductor and other stringing material issued should be maintained in site register.
7.5.5 Before commencing of stringing work, contractor must obtain sag tension charts (these shall be
supplied by the GETCO) showing initial and final sags and tensions for various temperature and
7.5.6 The stringing work should be carried with the help of tensioner and puller machine or Manual.
7.5.7 The contractor shall be responsible and will take care of proper handling of drums from stores to site,
sufficient numbers of aluminum sketch blocks shall be used for laying out the A.C.S.R. Conductors.
Necessary precautions shall be taken to avoid conductor rubbing on the ground by providing
adequate ground rollers on supports. Additional rollers shall also be provided to cross thorny hedges,
forcing and other obstructions to avoid scratching of conductors. The conductor and ground wire
shall be made to sag correctly as per stringing charts before they are finally transferred to the hard
ware’s for conductors and to clamps for ground wire, No joints should be made at less than 30 meters
from the tower and that
no joint shall be permitted in Railway., River & Road crossing spans. There shall not
be more than one joint in a span of each conductor. All conductors shall be stressed
to their maximum working load at the time of stringing.
The minimum clearance between the lowest point of conductor and ground shall not be than those
indicated in section-II of this specifications. All compression joints should be carefully made and a
record of initial and final length of the joints, jointly signed by contractor’s and GETCO’s
representatives should be maintained. Dynamometer shall be used in tensioning the conductors,
check for sag should also be made at intervals when conductors are drawn up. Over stressing, causing
damage to towers, should be avoided care should be exercised not to over tension the conductor. An
extra sag if 150mm should be allowed at all important tension points like Railway and River crossing.
7.5.8 After being pulled the conductor/ground wire shall not be allowed to hang in the stringing sheaves for
more than 72 hours before being pulled to the specified sag. During the time the conductor/ground
Seal and Signature of Contract Page 70 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
wire in on the stringing sheaves before sagging in, it shall be ensured that the conductors/ground
wire is not damaged to wind, vibration vehicles or other causes.
7.5.9 The conductor shall be pulled up to desired sag, and left in Arial stringing sheaves for at least one
hours after which the sag shall be rechecked and adjusted, if necessary, before clipping in an
transferring the conductors from the Arial stringing sheaves to the suspension clamps.
7.5.10 Conductor shall be clamped within 24 hours of sagging in. The sag will be checked the first and last
span of the section in case of sections up to eight spans and in one intermediate open also for section
with more than eight spans.
7.5.11 The stinging sheaves, when suspended on the transmission structure for sagging, shall be so adjusted
that the conductor will be on the sheaves at the same height as the suspension clamp to which it is
7.5.12 All the line conductors shall be terminated at sub-station structures whose details shall be furnished
by the GETCO, at the appropriate times, The contractor shall fix strain insulators on the sub-station
7.5.13 Rods and Vibration Dampers shall be fitted at each suspension towers before final clamping of
conductor with insulator string. Vibration damper are to be fixed using aluminum tape with each
clamping bolt and in correct vertical position in relation to conductor. Compression type joints are to
be used for jointing of conductors. Each part connected with joints shall be perfectly cleaned by wire
brush and properly greased before final compression. All the joints of conductors and earth wire shall
be made in the best workmanship manner and shall be perfectly straight and having maximum
possible strength.
7.5.14 Stringing work includes the hoisting insulators, fixing hardware, lifting amour rods, and vibration
dampers, making joints, repair slave etc. All stringing tools and hydraulic compressor machine should
be arranged by the contractor.
7.5.15 The stringing work should be planned in such a manner in consultation with the Engineer in charge of
the work that minimum shut down of power line crossings are required. Revenue loss due to any
undue shut down i.e. after the shut down is arranged and required to be extended on account of
Bidder shall be recoverable from the Bidder.
7.5.16 The stringing of the ground wire shall be done in accordance with the stringing charts approved by
the GETCO. The ground wire of galvanized steel shall be strung to run continuously over the
conductors. The ground wire shall be pulled, sagged and clamped-in from tension tower to tension
tower before the phase conductors are pulled in that section.
7.5.17 Proper guys shall be provided to counter balance the paying out tension of conductor/ground wire at
the tension locations, to avoid damage to towers and/or accident.
Seal and Signature of Contract Page 71 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
(To be submitted on Bidder’s firm letterhead with authorized signatory & firm’s seal)
Annexure-I (on Bidder’s letterhead)
Details of the Firm
Name of the Firm
1 Address of registered office
2 Contact personnel
4 Residential Address
7 Telegraphic code
8 E-mail address
1 Address of WORK
2 Contact personnel
4 Residential Address
7 Telegraphic code
8 E-mail address
Seal and Signature of Contract Page 72 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Annexure-II (On Bidder’s letterhead)
Details of experience in last three years from the due date of tender
Order Nos. of sub- Due date Actual
Sr. Name of Order fully order
reference no. stations/feeder of Date of
No. s/s value executed under
& Date bays completion completion
A Gujarat Energy Transmission Corporation Ltd.
B Other state electricity board
C Private Firms
Annexure-III (On Bidder’s letterhead)
List of work completion certificate submitted with technical bid
Name of the authority by whom
Sr.No. Name of work the work completion certificate Reference No. & Date
Seal and Signature of Contract Page 73 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
APPENDIX –IV (On Bidder’s letterhead)
TENDERER’S EXPERIENCE
A List of Similar jobs executed by the Contractor &Name with address of a Person whom reference
can be made, by the Corporation, if required necessary.
[Tenderers shall submit the information in the Format detailed here under]
Sr. Descripti Value Construc Actual Date Clie Persons Principa
N on Of Work tion Construct Of nt to l
o of Work Execute Period ion Completio whom Feature
d as per Period n Referenc s
Rs. Contract for the e
Completi may be
Contractor’s Representative legible signature: ______________________
Seal of the company
Seal and Signature of Contract Page 74 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Gujarat Energy Transmission Corporation Ltd.
APPENDIX – V (On Bidder’s letterhead)
WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand , as on the date of the Submission of this tender
[Tenderer shall submit the information in the Format detailed here under]
Sr. Name of Work in hand Work Tender for Remark
Tender Cost of Anticipated Estimated Date Stipulate
Cost Remaining Date of Cost when d
work Completion decisi
Contractor’s Representative legible signature: ______________________
Seal of the company Date & place: _______________________________________________
Seal and Signature of Contract Page 75 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Gujarat Energy Transmission Corporation Ltd.
APPENDIX-VI (On Bidder’s letterhead)
TENDERER’S DETAILS OF PERSONNEL
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Sr. Description Name Qualification Professional Remarks
No. &Details Experience
of position & details of
Contractor’s Representative legible signature: ______________________
Seal of the company
Seal and Signature of Contract Page 76 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Gujarat Energy Transmission Corporation Ltd.
APPENDIX-VII(On Bidder’s letterhead)
TENDERER’S DETAILS OF MACHINERY
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderer shall submit in the Format detailed here under
Sr. Description & Capacity Numbers Make Remarks
Contractor’s Representative legible signature: ______________________
Seal of the company
Gujarat Energy Transmission Corporation Ltd.
APPENDIX-VIII (On Bidder’s letterhead)
PERFORMA, SHOWING THE DETAILS OF SITE VISIT DONE BY AGENCY BEFORE QUOTING THE
[Tenderers shall submit in the Format detailed here under]
Sr. Name of Name of Qualification Designation / Remarks.
No. firm Authorized post holding
representative in company.
of firm who has
visited the site.
Contractor’s Representative legible signature: ____________________
Seal of the company
Seal and Signature of Contract Page 77 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Gujarat Energy Transmission Corporation Ltd.
APPENDIX – IX (On Bidder’s letterhead)
Qualification Requirement.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
1 Registration Class – with valid up to
3 Partnership deed/Proprietor (Notarized
4 Power of Attorney (Notarized copy)
5 Bl. Sheet / P&L A/C, Statement of last
6 Latest Solvency certificate. Rs. Lacs issued by Bank, branch
7 GST Registration No.
9 Experience certificate – form 3A of last
years (minimum value of similar work
done should be equal to or more than
50% of estimated cost
Signature of Tenderer Company’s Round Seal
Seal and Signature of Contract Page 78 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Gujarat Energy Transmission Corporation Ltd.
APPENDIX – X (On Bidder’s letterhead)
Qualification Requirement.Contractor must fill up below details
1. PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2. PENALTY TERMS AGREED
(Please Specify YES / NO.)
3. SECURITY TERMS AGREED:
(Please Specify YES / NO.)
4. TERMS AGREED:
(Please Specify YES / NO.)
5. VALIDITY Of the offer for 180 DAYS From the date of
opening of the Technical Bid: AGREED:
(Please Specify YES / NO.)
6. PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
7. MOBILE NOS., TELEPHONE NOS. & FAX NO:
8. Authorized person of the firm :
9. Name of the proprietor, partners, directors [as the case
may be], along with address, telephone, fax no. etc.
Signature of Tenderer Company’s Round Seal
Seal and Signature of Contract Page 79 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Tender Acceptance letter
(UNDERTAKING TO BE SUBMITTED ON FIRM LETTER PAD)
Conductor replacement with Hardware & SRI of 66KV Reladi Anjar Tower line (on 132KV
Tower) under Bhuj AM Division under Anjar AM Circle (Work approved under R&M 2026-
In connection with above subject, I/we______________________________________________________________ are
the authorized signatory for _________________________________ (Name of bidder) and I/We confirm the
1) I / We, the undersigned, have read, understood and examined all the terms, conditions
and parameters on each page/document of above tender documents in detail.
2) I/We further undertake that the information given in this tender are true and correct in all
respect and I/We hold the responsibility for the same.
3) I / we declare that we accept all the conditions of the above tender unconditionally. I / We
don’t have any objection for any clause, point or condition. If there will be any deviation
found, in bid, the offer shall be out rightly rejected without assigning any reason thereof
by GETCO and I/We will have no objection for the same.
4) I/We undertake that the work shall be carried out as per the specifications given in Notice
Inviting tender or as per the Engineer in charge at the time of work execution.
5) In any legal implications in future if any, this document can be used as authentic consent
Seal of the firm Signature of the tenderer
Seal and Signature of Contract Page 80 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
APPENDIX – 14(On Bidder’s letterhead)
(UNDERTAKING IN REGARD TO STOP DEAL/BANNED FOR USED BUSINESS DEALING /BLACK
Sub: UNDERTAKING IN REGARD TO STOP DEAL/BANNED FOR USED BUSINESS DEALING
/BLACK LIST THEREOF
Ref:-Tender No. Anj/CMC/R&M/e-Tn-132 /2026
Name of Work: Conductor replacement with Hardware & SRI of 66KV Reladi Anjar Tower
line (on 132KV Tower) under Bhuj AM Division under Anjar AM Circle (Work approved
under R&M 2026-27)
and their proprietor/any partner/any director of the firm is not stop deal and /or banned for
business dealing and /or black listed by GUVNL/or their any subsidiary company viz.
GSECL/GETCO/MGVCL/PGVCL/UGVCL/DGVCL.
Signature of tenderer
Seal and Signature of Contract Page 81 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Letter Head of party
(This Performa should be submitted by party
on letter Pad along with Tech. Bid for RTGS)
Ignore if already submitted to concern office
The Superintending Engineer(Tr.),
GETCO, Transmission Circle,
Old power house, Station Plot,
Sub:- Submission of detail regarding payments of our bills through RTGS/NEFT.
Reference to subject cited above, the details of our Bank Account for payment of ours bills through
RTGS/NEFT are as under.
Sr. No. Particulars
1 Name of Party / Firm
3 Account Number
4 Type of Account
5 Branch name & Address
6 Contact No. of Branch
e-mail ID & cancelled
Cheque(Original)
You are requested to do payment of bills through RTGS / NEFT.
Yours Faithfully,
(Name & Seal of Bidder
Seal and Signature of Contract Page 82 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Confirmation Regarding Site Verification(On Bidder’s letterhead)
The Superintending Engineer (TR)
Sub: Confirmation Regarding Site Verification.
Ref: Tender No. Anj/CMC/R&M/e-Tn-132 /2026
Name of Work: Conductor replacement with Hardware & SRI of 66KV Reladi Anjar
Tower line (on 132KV Tower) under Bhuj AM Division under Anjar AM Circle (Work
approved under R&M 2026-27)
In context to above reference tender, I hereby confirmed that I have visited the
site/sites as mentioned in tender. And after keeping familiar myself completely about
site & situation I am applying in tender and accepting all terms and condition
mentioned in tender in to.
Yours faithfully
Authorized signatory Name & signature
Seal of the Firm Signature of the Tenderer
Seal and Signature of Contract Page 83 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
For Proprietorship firm only
Self-Affidavit for proprietorship firm
(On Rs.300/- stamp paper duly notarized)
I the undersigned _________________________________ hereby solemnly
declare on oath that I am the sole proprietor of the firm
________________________ . The proprietorship concern is solely owned,
managed and controlled by me.
The signature appearing in the contract agreement is signed by me and is
I hereby state that whatever is stated herein above is true and correct to the
best of my knowledge and belief.
Hence solemnly affirmed on this _____ day of ___________ of
Seal and Signature of Contract Page 84 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
(On the letter pad of the company)
Declaration Of Conflict On Interest
The Superintending Engineer (AM)
Gujarat Energy Transmission Corporation Ltd,
Name of Tender ________________________
With reference to above your tender Notice No……………………………………………
For the work of………………………………………………………………
We do not have any conflict of interest with any other bidders who has submitted the bid in this
tender for particular quoted item.
Yours Faithfully,
Seal and Signature of Contract Page 85 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
DECLARATION FOR RELATIONSHIP WITH EMPLOYEE
(ON TENDERER’S FIRM LETTER PAD)
_______________________________________________ are the authorized signatory of
__________________________________________________(Name of tenderer’s firm) hereby declares that the
interest (i.e. shareholding in company and share in partnership firm) of no employee of
GUVNL or its subsidiary companies i.e. GETCO, GSECL, PGVCL, DGVCL, UGVCL or MGVCL or
his / her relative as defined in Section 2(77) of the Company’s Act 2013 is 10% or more in
our company / partnership firm.
In case at any stage, it is found that the information given by me is false/incorrect, GETCO
has the absolute right to take any action as deemed fit without any prior intimation to our
company / partnership firm. Non disclosure of such facts would immediately disqualify the
tenderer for further dealing with GETCO.
Seal & Signature of the tenderer
Seal and Signature of Contract Page 86 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
(Location Address)
Sub.: CA Certificate for payment of GST and uploading of the invoice details on GSTN portal
This is to certify that M/s (Name of the Party and Address) have completed the work / supply of
(Nature of Work) against (Work Order No. and date). It is further certified that the GST charged on the
bills of the said work order are paid to Government and accurate & correct details of such invoices are
also uploaded on the GSTN portal within the stipulated time. It is further certified that GST charged from
GETCO has neither been refunded nor is refund claim pending with GST Department.
Firm Registration No.
Seal and Signature of Contract Page 87 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
(ON LETTERHEAD OF COMPANY/FIRM)
(Location Address)
Sub.: (Nature of Work with Order No. of GETCO) -- Submission of Undertaking thereof
I/we hereby undertake that if GST Charged on the invoices of the above stated order is not
paid/ short paid to government or if I/we fail to upload the details or uploads inaccurate particulars
on GSTN portal within the stipulated time limit, GETCO shall have the right to recover the amount
of GST along with penal interest at the rate of 15 % p.a.
I/we, hereby undertake that in the event of any refund of GST either full or part if received by
me/us in future in respect of the goods and/or services for the above state order, I/we shall pass on
the same to GETCO without any formal claim to that effect from GETCO.
Name of the Supplier / Contractor
Name, Signature of the Authorised
Seal and Signature of Contract Page 88 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
ON STAMP PAPER OF Rs. 300 (Duly Notarized)
(TO BE OBTAINED EACH CONTRACTWISE YEARWISE)
Addl. Chief Engineer (Proc.)/Superintending Engineer/Executive Engineer
Corporate Office/ Circle Office / Division Office
(Name of the Authorized Signatory) aged
about_______ years, in my capacity
the Seller with address) having PAN_________________ (10 Digits) do hereby state that
GETCO has awarded the order of ___________________________________________
(Description of Supply Order EPC order)______________________ having
______________________ (Order No and Date)________________ and we hereby declare
that we, M/S____________________ have aggregate annual turnover of more than / less than
(Strike out whichever is not applicable) Rs. 50.0 Crores in the current financial year and the
provisions of e-invoicing under GST Acts are applicable/Not-applicable to M/s
We hereby undertake to comply with all the applicable provisions of e-invoicing under GST
Acts and indemnify GETCO for any financial / non-financial loss that GETCO may suffer due to
non-compliance of e-invoicing provisions under GST Acts and rules thereunder including non-
availability of Input Tax Credit (ITC) of GST to GETCO within the prescribed time limit. (Strike
Out if not applicable)
(Name of Authorised Signatory)
Seal and Signature of Contract Page 89 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
No Deviation Certificate
(UNDERTAKING TO BE SUBMITTED ON FIRM LETTER PAD)
Reference: Tender No.
In connection with above subject, I/we______________________________________________________________
are the authorized signatory for _________________________________ (Name of bidder)
1. I / We, the under signed have read and examined the Tender Specifications in tender
mentioned under reference along with all Technical & Commercial terms and conditions.
2. I / We, declare that our offer is strictly in line with the Tender specifications
3. Further, I / We also agree that additional conditions / deviations, if any, found in the
Technical & Commercial terms & conditions our offer shall be out rightly rejected without
assigning any reason thereof.
4. I/We declare that I/We accept Tender unconditionally.
Seal of the Firm Signature of the Authorized
Representatives of the firm
Seal and Signature of Contract Page 90 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
(On the letter pad of the company)
UNDERTAKING IN RESPECT OF REFERENCE TO NCLT UNDER INSOLVENCY &
BANKRUPTCY CODE
Subject: - Undertaking in respect of reference to nclt under insolvency & bankruptcy code
Name of Work/Supply:
Tender No. ANJ/CMC/R&M/e-Tn-132 /2026
In connection with above subject, I / We confirm that our firm is not declared in NCLT under
Insolvency & Bankruptcy Code. Further, I / We also agree that, if any found NCLT under Insolvency
& Bankruptcy Code, the offer shall be out rightly rejected without assigning any reason thereof.
(Seal, Sign & Name of Authorized Signatory of Bidder)
Seal and Signature of Contract Page 91 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
SAFETY CUM INDEMNITY BOND
(On Non-judicial Stamp paper of value not less than Rs.300.00)
KNOW ALL MEN BYTHE SEPRESENTS that we, By this SAFETY CUM INDEMNITY BOND Executed
on this ____________ Day of 2023. I/We Having Registered Office (here in after called “THE
CONTRACTOR” which expression shall mean and includes my/our heirs, executors,
administrators and legal representatives, successors and permitted assigns)do hereby binds
myself/ ourselves and also our company/firms after having the power to bind by this promise
and undertaking in favour of the Gujarat Energy Transmission Corporation Limited (GETCO),
Anjar State Transmission Utility under The ElectricityAct,2003 having its registered office at
Sardar Patel VidyutBhavan, Racecourse, Vadodara.(here in after called as GETCO, which
expression shall mean and include its legal representative, administrators as signs)has agreed
under the terms and conditions of the contract no. Dated made between and____________ for the
contract of the value of Rs _____ interalia on Production of Safety cum Indemnity Bond.
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to time
to the extent of Rs. Rupees only against any losses or damages, costs,
charges and expenses caused to or suffered by reason of the CONTRACTOR while Project, R&M,
O&M work including work carried out by outsourcing agency, failing to take proper care or not
complying the guidelines given hereunder as per Annexure-A and instructions which may be
given from time to time during the continuance of the contract and we further undertake to
unconditionally pay the amount claimed by the GETCO on demand and without demur to the
extent aforesaid.
Whereas the CONTRACTOR has/ have been awarded to execute the job/works under order no.
, dated _________for _____issued by the
GETCO after having observing necessary formalities, the details of which is described in the order
no. dated and whereas the said job/works will be
/likely to be done in places covered under Employees’ State Insurance Act, 1948 (ESI) and /or the
Workmen Compensation Act,1923 and /or other laws relating to the Labour Management and
Welfare Act. (Respective Amendments)
And whereas according to the condition of the Contract the CONTRACTOR is under obligation to
execute this Safety cum Indemnity Bond before the commencement of actual execution of work
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to follow the
guidelines as per Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to whether there
has been any breach of the guidelines as per Annexure-A of this bond and as to the extent of the
loss, damages, costs, charges and expenses caused to or suffered by the GETCO.
We the CONTRACTOR further agree that our liability under this bond shall not be discharged
because of the change in the constitution of the GETCO or for the extension of the time limit or for
any other reason.
We the CONTRACTOR further agrees to the given terms and conditions:
a. That the CONTRACTOR undertakes /undertake to indemnify and keep harmless the GETCO
from all claims, actions, proceedings and risk, damage danger to any person whether belonging
or not belonging to the. CONTRACTOR.
b. That the CONTRACTOR shall keep harmless the GETCO from all claims, compensation, damages
any proceedings in respect of any of its employee / workmen under the Workmen
Compensation Act or any other laws for the time being in force.
c. That, if during the course of execution of work as stated in the contract order mentioned
hereinabove issued by the OBLIGEE, it is found that the CONTRACTOR has not complied with
guidelines as per Annexure-A or terms and conditions / formalities within themeaning of
Employees’ State Insurance Act,1948 (ESI) or Workmen Compensation Act 1923 or any other
Seal and Signature of Contract Page 92 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
laws relating to the Labour Welfare for the time being in force, and also has not observed the
safety norms in accordance with the law prevailing at the place of work/job to the satisfaction
of the GETCO, the GETCO shall have the right to stop the execution of work/job and the period
of such stoppage shall not be taken into account for the calculation of the total period of
completion of work for which the CONTRACTOR is responsible to complete the work/job and it
will be deemed that discontinuance was due to default of the CONTRACTOR .
d. That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to pay any
such compensation mentioned hereinabove, whether on failure of the CONTRACTOR or for any
other reason, the GETCO shall have the right to recover the said amount from any amount
receivable by GETCO or any bank guarantee deposited or anything payable whether in
connection with this contract or other contract by the CONTRACTOR to the OBLIGEE.
e. That the CONTRACTOR is/are aware and accept that for the persistent or repeated violation of
any guidelines as per Annexure-A and terms and conditions mentioned in this Safety cum
Indemnity Bond, GETCO shall have right to terminate the contract of work issued to the
f. In case if any safety related fatal Electrical / Mechanical accident occurred to any employee of
agency or outsider due to negligence or non-compliance of GETCO safety norms then in
addition to the compensation and liability as per statutory requirement, contractor / agency is
hereby agreed to pay the penalty amount as given below:
Sr.No Amount of Contract in Rs. Penalty amount
1 Up to1Lac Rs.5000/- plus APPLICABLE
TAXES (IF ANY) as applicable
2 Above1Lac to 10Lacs Rs.25000/-plus APPLICABLE
TAXES (IF ANY) as applicable
3 10 to 100 Lacs Rs.100,000/- plus
APPLICABLE TAXES (IF
4 >100Lacs ANY)
1.0%of as applicable
contract value plus
APPLICABLE TAXES (IF ANY)
g. I/We the CONTRACTOR here by confirm that in case of any dispute/ difference for settlement
of claims under this Safety Cum Indemnity bond the courts in Gujarat State wherever job/
work is performed or as per GETCO norms shall have the jurisdiction to decide the rights
&liabilities of the parties while adjudicating the matter of claims under this Safety Cum
Indemnity Bond.
h. This Safety cum Indemnity Bond shall continue and hold good until it is released by the GETCO
in Writing on the CONTRACTOR’s application after the Contractor has discharged all his
obligations under the order mentioned hereinabove and submitted a “NO DEMAND
CERTIFICATE” from the GETCO under the said order. The Safety cum Indemnity Bond shall be
valid for a CONTRACT PERIOD and renewable thereof (Claim Period).
i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein contained are in
addition to And not by way of limitation or substitution for any other guarantee, indemnities
Hereto before given to the GETCO by the CONTRACTOR and this indemnity does not
Revoke or limit such indemnities or guarantees. IN WITNESS WHEREOF the Parties hereto
have executed this indenture the day the year First hereinabove written.
(Signature with seal of The CONTRACTOR)
In the presence of:
Seal and Signature of Contract Page 93 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
(Non Judicial Stamp Paper of Rs. 300/-)
INDEMINITY BONDKNOW ALL MEN BY THESE PRESENTS that we, Messer’s ___________________
(hereinafter called “the Contractor” which expression shall, where the context so admits, include their
heirs, executors, administrators and legal representatives, successors and permitted assigns) are hereby
held and firmly bind unto the Gujarat Energy Transmission Corporation Ltd (hereinafter called “the
GETCO” which expression shall, where the context so admits, include its successors and assigns) to refund
the full amount of materials supplied by the GETCO under the terms and conditions of A/T No.
_________________ ________________dated _______ against any loss damage or deterioration of whatsoever nature
occurs to said materials supplied by the GETCO and which are in the custody of the contractor at their
works site, on behalf of the GETCO, at ____________ (name of S/S / line) _______________ and / or if any of the
said materials, when inspected by any officer authorized by the GETCO in this behalf, is found to be
damaged, lost, deteriorated in quality or quantity, the contractor hereby agrees to bind himself to
indemnity and at all times keep indemnified the GETCO against all loss, damage and deterioration to the
any material supplied by the GETCO during his custody and shall pay in cash on demand from the GETCO
within 30 days the market value of such materials which is lost, damaged or deteriorated in full to the
GETCO and shall also hereby authorize the GETCO to deduct the said sum from any sum due to the
contractor or any sum which may at any time become due to the contractor under the above referred
contract or any other contract entered into by the contractor with the GETCO.
AND WHEREAS the contractors do hereby agree to be responsible for the safe custody and protection and
preservation of the said materials against all risks (excluding war risks) and against loss, damage and
deterioration of whatsoever nature in respect of the said materials while it remains in the custody and
possession of the contractor.
AND WHEREAS the said materials shall at all times be open for inspection by any officer authorized by the
Now the conditions of the above written bond are such that the contractor shall pay the full amount
forthwith to the GETCO in the event of loss, damage or deterioration or whatsoever except due to
circumstances arising out of war in respect of the materials supplied by the GETCO and shall fully and
effectually indemnify and keep indemnified to the GETCO against such loss, damage and deterioration.
The contractor shall keep the said materials open at all times for inspection by the officers authorized by
the GETCO and produce at anytime when demanded.
THE WITNESS WHERE OF: We the
(Signature of contractor)
Here to signed at ___________________
In the presence of
____________address ______________ (Signature)
_____________address ______________ (Signature)
Seal and Signature of Contract Page 94 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
PROFORMA FOR CONTRACT AGREEMENT
(Non Judicial Stamp Paper of Rs. 300/-)
This Agreement is made at Anjar the_____________ day of ___________ in the Christian Year Two thousand
Twenty Three between M/s. _____________________________________ (address of office) ________________
(hereinafter referred to as “THE CONTRACTOR” which expression shall unless excluded by or repugnant
to the contract include its successors or permitted assigns) of the ONE PART and the Gujarat Energy
Transmission Corporation Ltd, having their Head office at Vidyut Bhavan, Race Course, Baroda 390
(hereinafter called “The GETCO” which expression shall unless excluded by or repugnant to the context
include its successors or assigns) of the other part.
WHEREAS the aforesaid GETCO has accepted the tender of the aforesaid contractors for
______________________________________ _______________ hereinafter called “the works” and more particularly
described and enumerated or referred to in the specification, terms and conditions prescribed in the order
letter, covering letter and other letters and schedule of price which for the purpose of identification have
been signed by Shri ____________________________________ on behalf of the contractors and by -------------------------
--------- on behalf of the GETCO, a list whereof is made out in the Schedule hereunder written and all of
which said documents are deemed to form part of this contract and included in the expression “The works”
wherever herein used, upon the terms and subject to the conditions hereinafter mentioned.
AND WHEREAS THE GETCO has accepted the tender of contractors for the construction of the said works
for the sum of Rs. _______________ Rupees (_______________ ________________________________) upon the terms and
subject to the conditions herein mentioned.
NOW THIS AGREEMENT WITNESSESS AND IT IS HEREBY AGREED AND DECLARED THAT.
2. The contractors shall do and perform all works and things in this contract mentioned and described
or which are implied therein or there from respectively or are reasonably necessary for the
completion of the works as mentioned and at the times, in the manner and subject to the terms and
conditions and stipulations contained in this contract, and in consideration of the due provision,
executions, supply and completion of the works agreed to by the contractor as aforesaid the Board
doth hereby covenant with the contractor to pay all the sums of moneys as and when they become
due and payable to the contractors under the provisions of the contract. Such payment to be made
at such times and in such manner as is provided by the contract.
3. The conditions and covenants stipulated here-in-before in this contract are subject to and without
prejudice to the rights of the Board to enforce penalty for delays and / or any other rights
whatsoever including the right to reject and cancel on default or breach by the contractor of the
conditions and the covenants as stipulated in the general conditions, specifications, forms or tender
schedule etc. attached with GETCO’s Order No. ___________________________________________________.
The contract value, extent of supply & erection works, delivery dates , specifications and other
relevant matters may be altered by mutual agreement and if so altered shall not be deemed or
construed to mean or apply to affect or alter other terms and conditions of the contract and the
general conditions and the contract so altered or revised shall be and shall always be deemed to
have been subject to and without prejudice to said stipulation.
Seal and Signature of Contract Page 95 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
List of documents forming part of the contract:
1. GETCO’s Tender Specification No. ____________ and contractor’s offer opened on dated ____/____/_____
2. GETCO order No. Dtd. _____ / ______/ ______
3. Contractor’s acceptance of order vide letter no. _______________.
4. Contractor’s Partnership Deed dtd. ________________.
5. Contractor’s Power of Attorney / Board Resolution authorizing person to sign on behalf of Firm.
In witness whereof the parties here to have set their hands and seals this day and month, year first above
1) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
For and behalf of M/s. __________________ (Signature)
In the presence of (Full Name, Address and Signatures)
2) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
for and on behalf of Gujarat Energy Transmission Corporation Ltd Circle office. Anjar.
In the presence of name, Full address and Signature:
Seal and Signature of Contract Page 96 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Format for Letter of Acceptance
(To be submitted on firms letter-head. Duly stamped & signed)
Ref. No. Date :
Superintending Engineer (TR)
Gujarat Energy Transmission Corporation Ltd
Circle Office, Bhuj Road
Anjar – Kutch -
Sub: Latter of acceptance
Ref: Tender No.
We hereby agree, admit and acknowledge the receipt of your above referred Acceptance of Tender
for the Conductor replacement with Hardware & SRI of 66KV Reladi Anjar Tower line (on
132KV Tower) under Bhuj AM Division under Anjar AM Circle (Work approved under R&M
We hereby further agree to all the terms and conditions mentioned in the tender, LOI and A/T
unconditionally.
Yours faithfully,
(Authorized Signature)
Designation _________________
(Official Stamp)
Seal and Signature of Contract Page 97 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
(ON STAMP PAPER OF RS. 300/-)
The Superintending Engineer (TR) BG. No.
Gujarat Energy Transmission Corporation Ltd, Issue Date:
Circle office, Expiry Date:
Anjar. Claim Expiry Date:
FORM OF BANKER’S UNDERTAKING
[Combined Performance Guarantee (PBG) towards Execution / Supply Period and Guarantee / Warranty
Period as per Commercial terms and condition of Tender]
We, __________________________________________________(Name of the Bank and Address of the Branch
giving the Bank Guarantee) having our registered office at -
________________________________________________(Address of Bank’s registered office) hereby give this
Bank Guarantee Number____________________Dated:______________and hereby agree Unequivocally and
Unconditionally to pay immediately on demand in writing from the Beneficiary Company Gujarat Energy
Transmission Corporation Limited or any officer authorized by it in this behalf any amount up to not exceeding
Rs. ________________(Amount of combined Performance Guarantees towards Execution / Supply Period and
Guarantee / Warranty Period)
Energy Transmission Corporation Limitedon behalf of M/s _________________who have entered into a
contract for the supply/works specified below:
This agreement shall be valid and binding on this Bank up to and inclusive of ______________(Date of validity of
the Bank Guarantee)and shall not be terminable by notice or by change in the constitution of the Bank or the
firm of Contractors / Suppliers or by any other reasons whatsoever and our liability hereunder shall not be
impaired or discharged by any extension of time or variations or alterations made, given conceded or agreed,
with or without our knowledge or consent, by or between parties to the said within written contract.
Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this
Guarantee shall not be assignable, transferable by the Beneficiary Gujarat Energy Transmission Corporation
Limited. Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not be
entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly.
NOTWITHSTANDING anything contained herein before, our liability under this guarantee is restricted to
guarantee shall remain in force until ____________________(Date of validity of the Bank Guarantee). Unless
demands or claims under this Bank Guarantee are made to us in writing on or
before___________________(Date of validity of the Bank Guarantee), all rights of the Beneficiary under this
Bank Guarantee shall be forfeited and we shall be released and discharged from all liabilities there under:
Seal and Signature of Contract Page 98 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
Signature of the Bank’s Authorized Signatory
______________ (Bank Name) with Official Round Seal
______________ (Branch Code)
______________(Complete Postal Address of the Bank)
______________ (Telephone Number)
______________ (Fax Number)
Note: The banks shall be the Banks recognized/notified by the Finance Department,
Government of Gujarat (GOG) from time to time.
Seal and Signature of Contract Page 99 of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
(Government of Gujarat undertaking)
ASSET MANAGEMENT CIRCLE OFFICE ANJAR
220kV Anjar S/S Compound on Bhuj road, Anjar - Kutch-370110
Email: [email protected], Phone No: 99252
Reg. Corporate office:Sardar Patel VidyutBhavan, Race Course, Vadodara-390007
(CIN): U40100GJ1999SGC036018, Web:www.getcogujarat.com
PARTY TO TAKE NOTE PLEASE BEFORE SUBMITTING THEIR BANK GUARANTEES
1. A/T no. and date to be written on every page, of Bank Guarantee & its Extension.
2. If B/G amount is more than Rs.1 Lac kindly take sign of two bank officer with their respective
Employee code no.
3. Valid Confirmation letter of the concerned Bank in an approved format should be attached with
every Bank Guarantee & its Extension.
4. Stamp paper should be valid & recent one and date of issuing of stamp paper should not be
beyond six months, in any case.
5. Round seal and signature of two Bank officers should be affixed on every B/G paper.
BANK GUARANTEE (Extension of Validity)
(To be executed on non-judicial stamp paper of Rs.300/-)
(Name and address of the Bank issuing the
Bank Guarantee extension.)
Superintending Engineer BG. No.
Gujarat Energy Transmission Corporation Ltd Issue Date
Circle Office, Bhuj Road Expiry Date
Anjar – Kutch - 370110Amount
EXTENSION OF BANK GUARANTEE NO.____________________ dtd.__________ of Rs.________________________ (Amt, in
The validity period of our subject Bank Guarantee issued in your favor on behalf of
Notwithstanding anything mentioned herein before, our liability under this guarantee is restricted to an
amount not exceeding Rs._________________ (Rupees________________________________ _________________only) and it
will remain in force till _____________________.( Date of validity / Expiry )
We are liable to pay the guarantee amount or any part thereof under this Bank Guarantee only if you serve
upon us a written claim or demand on or before dated ________________ ( Date of expiry of BG +30 Days claim
All other terms and conditions mentioned in the original Bank Guarantee will remain unaltered. This
extension forms an integral part of the above quoted original Bank Guarantee and may be kept thereto.
Date:___________ Round seal & signature of Two Bank Officers with
Seal and Signature of Contract Page 100 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .