Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance ADMINISTRATIVE BUILDING SHIPYARD PREMISES SHIPYARD PREMISES M G ROAD PERUMANOOR ERNAKULAM KERALA ERNAKULAM KERALA 682015 | ERNAKULAM | KERALA | 682015 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹4.2 L
Closing Date
8 Sept 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Senior Manager, Commercial
NSRY, Naval Base, Kochi
Fitment of Multi Beam Echo Sounder onboard INS Jamuna
2020_NAVY_373008_1
PP/04/1130/JAMUNA/MBES/20
Single
Marine Services
Item Rate
42 days
Kochi
The shipyard must have suitable dry dock and sufficient infrastructure at geographical vicinity of NSRY (kochi)
4 documents required · 4 mandatory
₹0
₹4.2 L
Yes
9 Sept 2020
29 Aug 2020
9 Sept 2020
29 Aug 2020
8 Sept 2020
2 Sept 2020
29 Aug 2020 - 1 Sept 2020
180 days
Amount
GENERAL SERVICES
SUPPLY 300 LITRES OF DRINKING WATER (AQUAFINA/ KINLEY/ BISLERI) PER DAY ONBOARD.
(A) PROVIDE QA COVERAGE FOR ENTIRE WORK PACKAGE BY AREGISTERED OUTSIDE INSPECTING AGENCIES EX - LRS, IRS, ABS ETC.
DOCK BLOCK PREPARATION FOR DOCKING OF SHIP IN VERSION - I, BOTH CENTER LINE AND SIDE BLOCKS.SHIPYARD TO ARRANGE FOR THIRD PARTY INSPECTION AND HAND OVER DULY RECOMMENDED CERTIFICATE FOR DOCK BLOCK PREPARATION TO NAVY POST INSPECTION
DOCKING AND UNDOCKING OF THE VESSEL IN VERSION-I. (DURATION 35 DAYS). SHIPYARD TO PLAN AND COMPLETE ALL DRY DOCK RELATED WORK WITH IN DRY DOCK TIME.
(A) FIRST DAY DOCKING
(B) SUBSEQUENT DAYS IN DOCK.
(C) ASSISTANCE FOR DOCKING/UNDOCKING (QUOTE AS ONE UNIT)
(E) MOORING/UNMOORING AND LINE HANDLING
PROVIDE WHARFAGE / WET BASIN FACILITIES (WITH 6M DEPTH AT ALL CONDITIONS) AS REQUIRED FOR COMPLETION OF WORK PACKAGE. MAXIMUM DURATION OF WHARFAGE WILL BE 07 DAYS. ANY DREDGING REQUIRED TO BE CARRIED OUT PRIOR TO COMMENCEMENT OF REPAIR AT SHIPYARD'S COST.PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD IN THE CONTRACT
(A) PROVISION OF SHORE POWER 3 PHASE, 415V, 50HZ, FOR 42DAYS IN DRY DOCK & FOR THE DURATION OF STAY FOR COMPLETE REPAIR (RATES AS PER ACTUAL READING ON BOARD/ENERGY METER READING INSTALLED BY SHIPYARD) POWER SUPPLY CABLE AND METER TO BE PROVIDED BY SHIPYARD.QUOTE FOR 1000 KWH/DAY PAYMENT AT ACTUALS AS PER FINAL READING. SHIPYARDS TO INSTALL POWER METER/ENERGY METER IN SUPPLY LINE
(B) QUOTE FOR CONNECTION/ DISCONNECTION TAKEN FOR 4 TIMES)
(C) SHIP SHOULD BE EARTHED AT 04 POINTS WHILE IN DRY DOCK. EARTHING CABLE TO BE SUPPLIED BY SHIPYARD
(A) PROVIDE 02 SEA WATER FIRE MAINS WITH 06 BAR PRESSURE FOR ENTIRE DURATION WITH CONTROL VALVES AND NECESSARY SUPPLY HOSES. SHIPYARD TO CONNECT REFERENCE PRESSURE GAUGE AT DISCHARGE LINE. CALIBRATION CERTIFICATE OF PRESSURE GAUGES TO BE SUBMITTED
(B) CONNECTION AND DISCONNECTION OF LINES
SHIPYARD TO PROVIDE 02 PORTABLE AC UNITS (MINIMUM CAPACITY 15 TR EACH) WITH 04 AIR HOSES AND VENT PIPES TO SHIP DURING THE PERIOD OF WHARFAGE AND DRY DOCKING. ADEQUATE FLEXIBLE HOSES TO CARRY CHILLED AIR FROM PORTABLE AC UNITS TO ACCOMODATION AREAS, IN SHIP'S SUPERSTRUCTURE AND BELOW DECKS AND ELECTRONICS/ CONTROLS/ SENSOR COMPARTMENTS OF THE SHIP TO BE CATERED BY SHIP YARD. PAYMENT AT ACTUALS. RIGGING OF REQUIRED HOSES WIL BE RESPONSIBILITY OF THE SHIPYARD
PROVIDE FACILITIES FOR GARBAGE COLLECTION AND DISPOSAL ARRANGEMENTS (15 KG EACH) TWICE PER DAY FROM SHIPPAYMENT AT ACTUALS
PROVIDE 4 FIRE FIGHTING TRAINED HOT WORK SENTRIES WITH 02 SUPERVISORS FOR 16 HRS EACH DAY FOR THE DURATION OF REFIT.NUMBER OF SENTRIES REQUIRED WILL BE INTIMATED BASED ON SHIP YARD'S REQUISITION FOR HOT WORK RECEIVED THE PREVIOUS DAY.PAYMENT AT ACTUALS
TEMPORARY LIGHTING ONBOARD FOR THE ENTIRE DURATION OF REPAIRS TO BE PROVIDED INSIDE THE TANKS/WORK SPOT .
VENTILATION SHALL BE PROVIDED FOR DOUBLE BOTTOM TANKS FOR THE FITMENT OF GONDOLLA .
CLEANING OF TANKS
CONDUCTING GAS FREE INSPECTION AND PROVIDING TANK ENTRY PERMIT
DOCKING RELATED PACKAGE
HYDROJET CLENING OF HULL
HULL SURVEY/REPAIR IF ANY POST HYDROJET CLEANING AND HITU INSPECTION ANTICIPATED 2.5 TONNES STEEL RENEWAL
i) TRANSPORTATION CHARGES OF STEEL FROM NSRY(K)/MOK TO CSL. (For Sl (2) & (11)
OVERHAULOF 05 UNDERWATER VALVES SIZE 150 MM QTY-01,100MM-QTY04)
PAINT TOUCHUP ANTICIPATED 20% UW AREA
ICCP PRE/POST DOCKING CHECKS
INSPECTION /RENEWAL OF SACRIFICIAL ANODE
GRP DI-ELECTRIC SHIELD REPAIR
APT OF HOT WORK RELATED TANKS
AVAILABILITY OF PAINT OEM FOR U/W INSPECTION
FABRICATION &INSTALLATION OF GONDOLLA CASING WITH MULTI BEAM ECHO SOUNDER
STAGING FOR ENTIRE WORK PACKAGE
GONDOLA RELATED WORK PACKAGE
PRE-FABRICATION OF GONDOLA CASING AS PER APPROVED DRAWING
INSTALLTION,PAINTING (FULL U/W PAINT SCHEME) AND FITMENT OF SACRIFICIAL ANODES FOR GONDOLA CASING IN DRY DOCK
ENSURE AVAILIBILITY OF DMR 249A STEEL (PRIMAILY 10 AND 14 MM) IN ADEQUATE QUANTITY THROUGH MO/NSRY
DPT /WATER HOSE TEST OF WELD JOINTS
stage.html
html • 0.02 MB
finance_416114.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .