Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.5 LAccepted-AOC BANADA TA ABADASA DISTT KUTCH PIN 370 645 GUJARAT | KACHCHH | GUJARAT | 370645 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹43.8 L+₹29,800 (0.69%)Rejected-Finance NEAR RAILWAY STATION UTARLAI BARMER RAJASTHAN PIN 344001 | BARMER | RAJASTHAN | 344001 | L2 | Rejected-Finance NOT LOWEST BIDDER | |
| 3 | L3₹44.3 L+₹86,100 (1.98%)Rejected-Finance | L3 | Rejected-Finance NOT LOWEST BIDDER | |
| 4 | L4₹44.7 L+₹1.2 L (2.80%)Rejected-Finance | L4 | Rejected-Finance NOT LOWEST BIDDER | |
| 5 | L5₹45.6 L+₹2.2 L (5.01%)Rejected-Finance 0 PARNERA DHODIA WAD PARNERA VALSAD GUJARAT 396001 UDYAM GJ 25 0047109 | VALSAD | GUJARAT | 396001 | L5 | Rejected-Finance NOT LOWEST BIDDER |
| Sl No | Description | Qty | Unit | Vijay Construction Co L7 | Laxmi Enterprise L5 | TAKHUBHA KANUBHA JADEJA L1 | GPR Construction Co. L8 | SWASTIK INFRA L3 | M/s greenstone construction L9 | chankaya solutions L6 | yogesh kumar contractor L4 | M/S TANUSHREE CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M & L for preparing old painted bituminous/ concrete surfaces, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. painting lines, dashes, arrows, letters, etc. on roads, pavements and the like exc 10cm wide with road marking paint, white/golden yellow/black/grey all as specified and directed. | 38,000 | Square Metre | 83 ₹31,54,000 | 55 ₹20,90,000 | 61 ₹23,18,000 | 20 ₹7,60,000 Lowest | 55 ₹20,90,000 | 60 ₹22,80,000 | 58.99 ₹22,41,620 | 54 ₹20,52,000 | 40 ₹15,20,000 |
| 2.00 | M & L for preparing old painted bituminous/ concrete surfaces, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. painting lines, dashes, arrows, letters, etc. on roads pavements and the like n.exc. 10cm wide with road marking paint, white/golden yellow/black/grey all as specified and directed. | 8,000 | Ten Running Metre | 41 ₹3,28,000 | 35 ₹2,80,000 | 37 ₹2,96,000 | 200 ₹16,00,000 | 38 ₹3,04,000 | 80 ₹6,40,000 | 49.99 ₹3,99,920 | 30.6 ₹2,44,800 Lowest | 80 ₹6,40,000 |
| 3.00 | M & L for cutting grass by bush cutter and removing vegetation obtained from cutting / cleaning on both sides of runway, PTT, taxi track, near DTGM board and removing rubbish to outside MD land complete all as specified and as directed. Note: Department shall have the right to stop the work at any time even on working days due to security point of view. No any compensation shall be allowed on this account. The quoted rate is deemed to be inclusive of the above aspect. | 95,000 | Square Metre | 2.5 ₹2,37,500 | 2.5 ₹2,37,500 | 3 ₹2,85,000 | 5 ₹4,75,000 | 2.8 ₹2,66,000 | 4 ₹3,80,000 | 2.49 ₹2,36,550 Lowest | 3.6 ₹3,42,000 | 2.8 ₹2,66,000 |
| 4.00 | M & L for cutting grass by mechanically operated grass cutting machine/ device, of grass height 80 mm to 120 mm above slasher, whenever required, including removal of material obtained from cutting/removing/ cleaning (both sides) up to 100m from the concrete edges etc., complete all as specified and directed. Note: Contractor will arrange his own mechanical slasher i.e. Tractor and Jungle Jim with POL & MT driver. The mechanical slasher will be in operation from 09:00 am to 05:00 pm (including lunch break of half an hour at mid day) every day (i.e. all working days) in week excluding Sunday (Holiday) However department will have the right to stop the work at any time even on working days due to security point of view. Quoted rates are deemed to include minimum 10,000.00 Sqm of grass cutting per day failing which recovery @ Rs. 0.55 per Sqm for shortfall area shall be imposed. No extra shall be paid for grass cutting more than Rs 10,000.00 Sqm per day. | 210 | Per Day | 3,850 ₹8,08,500 | 4,150 ₹8,71,500 | 2,500 ₹5,25,000 | 6,000 ₹12,60,000 | 2,710 ₹5,69,100 | 2,000 ₹4,20,000 Lowest | 5,599.99 ₹11,75,997.9 | 3,600 ₹7,56,000 | 5,000 ₹10,50,000 |
| 5.00 | M & L for manually grass scrapping near the runway, PTT, loops and taxi track and removal of the material obtained from grass scrapping to a distance of n.exc. 150 m from concrete edge complete all as specified and directed. Note: Department will have the right to stop the work at any time even in working days due to security point of view. No any compensation shall be allowed on this account. The quoted rate is deemed to be inclusive of the above. | 1,10,000 | Square Metre | 3 ₹3,30,000 Lowest | 3.5 ₹3,85,000 | 3 ₹3,30,000 Lowest | 5 ₹5,50,000 | 3 ₹3,30,000 Lowest | 4 ₹4,40,000 | 3.49 ₹3,83,900 | 5 ₹5,50,000 | 3 ₹3,30,000 Lowest |
| 6.00 | M & L for preparation, cleaning of old painted surface exc 10 cm width or girth of runway controller huts, arrester barrier huts, wind sock base & TCP huts and like and applying one finishing coat of synthetic enamel paint white/black, golden, red, yellow, orange complete all as specified and as directed by Engineer-in-Charge. | 1,800 | Square Metre | 40 ₹72,000 | 70 ₹1,26,000 | 60 ₹1,08,000 | 80 ₹1,44,000 | 70 ₹1,26,000 | 50 ₹90,000 | 43.49 ₹78,282 | 36 ₹64,800 Lowest | 66 ₹1,18,800 |
| 7.00 | M & L for preparation of old plastered/concrete surface and applying two coats of white wash over ORA portion complete all as specified and directed. | 13,000 | Square Metre | 22 ₹2,86,000 | 15 ₹1,95,000 Lowest | 15 ₹1,95,000 Lowest | 25 ₹3,25,000 | 16 ₹2,08,000 | 15 ₹1,95,000 Lowest | 16.99 ₹2,20,870 | 27 ₹3,51,000 | 20 ₹2,60,000 |
| 8.00 | M & L for removing existing road marking paint (thermoplastic or cold paint) from bitumen/concrete surface by using a mechanical grinder/scarifier to the satisfaction of the Engineer-In-Charge. The process includes:-
(a) Machine grinding to remove existing markings without causing significant damage to the underlying road surface.
(b) Adjoining "ghost lines" must also be removed to prevent traffic confusion.
(c) Removal of debris, cleaning of road surface via air compressor or suction, and disposal of debris outside MoD land. (d) Rate includes mobilization of equipment, fuel, operator, and safety barricading. Note:- (i) The rate shall also include extra for removal of markings in hard-to-reach areas (e.g. corners, intersections, small symbols) where mechanical machine operation is not possible, using manual tools/small power tools. (ii) The rate shall also include repair of damaged bituminous/concrete surface (if any) caused during the removal process, using approved patch materials. | 2,000 | Square Metre | 20 ₹40,000 | 190 ₹3,80,000 | 145 ₹2,90,000 | 100 ₹2,00,000 | 270 ₹5,40,000 | 500 ₹10,00,000 | 18.99 ₹37,980 Lowest | 54 ₹1,08,000 | 96 ₹1,92,000 |
Tender Value
₹55.4 L
EMD Value
₹1.1 L
Closing Date
4 Jun 2026, 6:00 pmClosed
CWE (AF) BHUJ
CWE (AF) BHUJ KHAVDA ROAD BHUJ KACHCHH PIN 370001
PAINTING GRASS CUTTING AND JUNGLE JIM TO RUNWAY/ TAXI TRACK AT AF STN NALIYA
2026_MES_763937_1
85327/E8
Open Tender
Civil Works
Item Rate
270 days
NALIYA
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
GE (AF) NALIYA
₹1.1 L
Yes
13 Jul 2026
7 May 2026
6 Jun 2026
7 May 2026
4 Jun 2026
28 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M & L for preparing old painted bituminous/ concrete surfaces, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. painting lines, dashes, arrows, letters, etc. on roads, pavements and the like exc 10cm wide with road marking paint, white/golden yellow/black/grey all as specified and directed. | 38,000 | Square Metre | 1 | ₹38,000 |
| 2 | M & L for preparing old painted bituminous/ concrete surfaces, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. painting lines, dashes, arrows, letters, etc. on roads pavements and the like n.exc. 10cm wide with road marking paint, white/golden yellow/black/grey all as specified and directed. | 8,000 | Ten Running Metre | 1 | ₹8,000 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
85327TENDER.pdf
Tender Documents • 0.87 MB
BOQ_855686.xls
BOQ • 1.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .