Loading…
Loading…
Updated dates
Tender Value
₹92,270
Closing Date
22 Jun 2026, 2:00 pm3d left
Similar tender results from the same govt authority in the past 3 years.
SR EX EN ED THALOUT
O/O SR EX EN ED THALOUT
Tender for providing SOP to Proposed Electric Vehicle Charging Station at HRTC Bus Stand Banjar in E section Banjar UESD, HPSEBL,Banjar.T.S.1492025-26
2026_HPSEB_136338_1
HPSEBL/TED/NIT-25/2026-27
Open Tender
Supply and Erection
30 days
THALOUT
TENDER COST EMD TECHNO COMMERCIAL QUALIFYING DOCUMENTS
4 documents required · 4 mandatory
₹590
10 Jun 2026
10 Jun 2026
23 Jun 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Estimated Cost for Construction of R.C.C Foundation for 100/250 KVA Transformer | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches (not exceeding 1.5 m in width or 10 sqm plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 5.29 | cum | 308.52 | ₹1,632.07 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 0.33 | cum | 5,626.93 | ₹1,856.89 |
| 1.03 | Centering and shuttering including strutting, propping etc. and removal of form for | - | - | - | - |
| 1.04 | Foundations, footings, bases of columns, etc. for mass concrete. | 2.34 | sqm | 230.15 | ₹538.55 |
| 1.05 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 14.58 | sqm | 437.18 | ₹6,374.08 |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering and shuttering. All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7.7 | cum | 7,077.38 | ₹54,495.83 |
| 1.07 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete up to plinth level Thermo Mechanically Treated bars of grade Fe-500D or more | - | Kg | 81.71 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
biddoc03202627.pdf
Tender Documents • 1.04 MB
BOQ_201759.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid