Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC BJ MARKET ROOM NO 57 BJ MARKET NORTH 24 PARGANAS WEST BENGAL 700091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | L1 | Accepted-AOC 1st lowest bidder. | |
| 2 | L2₹1.9 L+₹1,917 (1.01%)Rejected-Finance 74 1 EAST CHANDMARI 3RD LANE PO NONA CHANDANPUKUR KOLKATA 700122 | 24 PARAGANAS NORTH | WEST BENGAL | 700122 | L2 | Rejected-Finance 2nd lowest bidder. | |
| 3 | L3₹1.9 L+₹4,348 (2.30%)Rejected-Finance 38 SARKAR BAGAN TALPUKUR BARRACKPORE NORTH 24 PARGANAS WEST BENGAL 700123 | 24 PARAGANAS NORTH | WEST BENGAL | 700123 | L3 | Rejected-Finance 3rd lowest bidder. |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
23 Apr 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, PWD
BMC
Temporary ELECTRICAL Infrastructural Works for preparation of EVM Commissioning venue, preparation of Distribution........................in connection with the ensuing Parliamentary General Election-2024.
2024_MAD_688107_2
NIQ No.10/PWD(BMC) dt.08/04/2024
Open Tender
Miscellaneous Services
Item Rate
180 days
Bidhannagar Municipal Corporation
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
10 Sept 2024
9 Apr 2024
25 Apr 2024
9 Apr 2024
23 Apr 2024
9 Apr 2024
Amount
Providing on hire basis following switches on angle iron frame including providing interconnection wiring with accessories socking earthing attachmentetc. And dismantling at the end of the election programme. Panel Accessories:-
500V, 250Amps. TPN main switch Duration : 3 (three) Days
500V, 200 Amps. TPN main switch Duration : 3 (three) Days
500V, 100 Amps. TPN main switch Duration : 3 (three) Days
500V, 60/63 Amps. TPN main switch Duration : 3 (three) Days
250V, 60/63 Amps. TPN main switch Duration : 3 (three) Days
500V, 100 Amps. TPN change over switch Duration : 3 (three) Days
Power Distribution Board Duration : 3 (three) Days
24-way M.C.B.D.B.T.P.N Duration : 3 (three) Days
24-way M.C.B.D.B.S.P.N Duration : 3 (three) Days
16-way M.C.B.D.B.T.P.N Duration : 3 (three) Days
16-way M.C.B.D.B.S.P.N Duration : 3 (three) Days
10-way M.C.B.D.B.T.P.N Duration : 3 (three) Days
10-way M.C.B.D.B.S.P.N Duration : 3 (three) Days
8-way M.C.B.D.B.T.P.N Duration : 3 (three) Days
8-way M.C.B.D.B.S.P.N Duration : 3 (three) Days
6-way M.C.B.D.B.T.P.N Duration : 3 (three) Days
6-way M.C.B.D.B.S.P.N Duration : 3 (three) Days
Power Cable
95 sq. mm, 3.5 core Duration : 3 (three) Days
70 sq. mm, 3.5 core Duration : 3 (three) Days
50 sq. mm, 3.5 core Duration : 3 (three) Days
25 sq. mm, 3.5 core Duration : 3 (three) Days
10 sq. mm, 3.5 core Duration : 3 (three) Days
6 sq. mm, 3.5 core Duration : 3 (three) Days
Distribution Wire for Power Distribution
Supplying and providing 7/0.064 wire on hire basis single core PVC wire and dismantling Duration : 3 (three) Days
Supplying and providing 3/0.036 wire on hire basis single core PVC wire and dismantling Duration : 3 (three) Days
Supplying and providing 2 x 3/0.036 Single Core PVC to light/fan/bell and other necessary point and dismantling after the end of programme. Duration : 3 (three) Days
Supplying and providing 3 x 3/0.036 Single Core PVC wire for 5 & 15 Amps. Plug point and dismantling. Duration : 3 (three) Days
Hire charges of Electrical fittings & goods, fitted & fixed in position complete in all respect & removal of all after the completion of election work as per direction of authority.
Fluorescent Tube Set (1 x 40 Watt) Duration : 3 (three) Days
Fluorescent Tube Set (2 x 40 Watt) Duration : 3 (three) Days
Bulbs - 100 watts Duration : 3 (three) Days
Bulbs - 200 watts Duration : 3 (three) Days
Table Fan (400mm x 450mm) Duration : 3 (three) Days
Ceiling Fan (1200mm) Duration : 3 (three) Days
Ceiling Fan (1400mm) Duration : 3 (three) Days
Pedestal Fan (500mm) Duration : 3 (three) Days
Air Circulator Fan (600mm) Duration : 3 (three) Days
Sodium Vapour Lamp : 400 watt Duration : 3 (three) Days
Sodium Vapour Lamp : 250 watt Duration : 3 (three) Days
Halogen - 1000 watt for Duration : 3 (three) Days
Flood Light - 1000 watts Duration : 3 (three) Days
Mercury Light - 1000 watts Duration : 3 (three) Days
Metal Lamp - 400/1000 watts Duration : 3 (three) Days
32" LCD/LED T.V. with Remote Control Duration : 3 (three) Days
P.L. light : (1 to 18 watt) Duration : 3 (three) Days
P.L. light : (20 to 36 watt) Duration : 3 (three) Days
P.L. light : (36 to 85 watt) Duration : 3 (three) Days
Temporary earthing arrangement 50 mm dia. G.I. pipe 3.64 mm. thick x 3.04 mtr. Long and 1 x 4 S.W.G G.I. wire, 13 mm dia. X 80 mm long G.I. bolts, double nuts, double washers, including S & F 15 mm dia. G.I. pipe protection (1 mtr long) to be filled with bitumen partly under. Duration : 3 (three) Days
Hire charges of high frequency including loud-Speaker with amplifire & cord-less microphone set for public address system complete and dismantling.
6 nos. Horns Duration : 3 (three) Days
4nos. Horns Duration : 3 (three) Days
2 nos. Horns Duration : 3 (three) Days
1 no. Horn Duration : 3 (three) Days
Hiring of Generator
Hire charges of generator set of 10 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) Green and sound proof type Duration : 3 (three) Days
Hire charges of generator set of 20 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places.(Dry rate) Green and sound proof type Duration : 3 (three) Days
Hire charges of generator set of 30 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) Green and sound proof type Duration : 3 (three) Days
Hire charges of generator set of 40 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) Green and sound proof type Duration : 3 (three) Days
Hire charges of generator set of 50 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) Green and sound proof type Duration : 3 (three) Days
Hire charges of generator set of 63 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) Green and sound proof type Duration : 3 (three) Days
Hire charges of generator set of 82.5 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) Green and sound proof type Duration : 3 (three) Days
Hire charges of generator set of 125 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) Green and sound proof type Duration : 3 (three) Days
Supplying and providing Split Air Conditionong Machine
1.25 Ton CUBE type Wall Mounted Duration : 3 (three) Days
1.50 Ton CUBE type Wall Mounted Duration : 3 (three) Days
1.50 Ton normal Split type type Wall Mounted Duration : 3 (three) Days
2.00 Ton normal Split type type Wall Mounted Duration : 3 (three) Days
Stand type Air Conditioning Machine; capacity - 3 Tons Duration : 3 (three) Days
Supplying & providing of Window Air Conditioning Machine
1.5 Tons Duration : 3 (three) Days
2.00 Tons Duration : 3 (three) Days
R.B. ENTERPRISE
GHOSH AND CO
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .