Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance 1ST FLOOR KRISHNA TOWERS OPP TO THRIKKAKARA TEMPLE THRIKKAKARA P O COCHIN 682 021 | ERNAKULAM | KERALA | 682021 | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹15.6 L (6.63%)Admitted-Finance 8 34A FATHIMAPURAM TAMILNADU | TAMILNADU | ₹2.5 Cr+₹15.6 L (6.63%) | L2 | Admitted-Finance |
| 3 | L3₹2.7 Cr+₹38.6 L (16.5%)Admitted-Finance 32 1089 KALAMASSERY CHANGAMPUZHA NAGAR COCHIN ERNAKULAM KERALA 682033 | ERNAKULAM | KERALA | 682033 | ₹2.7 Cr+₹38.6 L (16.5%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Fathima Engineering Co. Pvt. Ltd. L2 | sterling and wilson ltd L1 | GERESH ELECTRICALS PVT. LTD L3 |
|---|---|---|---|---|---|---|
| 1.0024 hour Operation and Maintenance of 110kV Substation,Power Distribution System at Technopark Phase-III Campus and 110 kV Digital Substation at Technocity and to provide an expert team competent to attend any breakdown so as to maintain the system with standards of performance as stipulated by KSERC / IE rules from time to time and to effect new service connections,metering consumption etc. as detailed in scope of works and as per the terms and conditions mentioned in the tender document ETPK/PH-III/2024-25/E-15. | ||||||
| 1.10 | Cost for First Year | 12 | months | 6,17,500 ₹74,10,000 | 5,70,229 ₹68,42,748 Lowest | 5,97,398 ₹71,68,776 |
| 1.20 | Service charges for contractor for First Year | 12 | months | 30,875 ₹3,70,500 Lowest | 51,320 ₹6,15,840 | 70,800 ₹8,49,600 |
| 1.30 | Cost for Second Year | 12 | months | 6,48,375 ₹77,80,500 | 5,89,598 ₹70,75,176 Lowest | 6,38,970 ₹76,67,640 |
| 1.40 | Service charges for contractor for Second Year | 12 | months | 32,419 ₹3,89,028 Lowest | 53,063 ₹6,36,756 | 1,12,100 ₹13,45,200 |
| 1.50 | Cost for Third Year | 12 | months | 6,80,794 ₹81,69,528 | 6,09,416 ₹73,12,992 Lowest | 6,71,420 ₹80,57,040 |
| 1.60 | Service charges for contractor for Third Year | 12 | months | 34,039 ₹4,08,468 Lowest | 54,937 ₹6,59,244 | 1,23,900 ₹14,86,800 |
| 4.00Skilled Labours ( Electricians/Painters/Masons/Cable Jointesr/Welders/ plumbers/fitters/ communication technician etc.) for additional labours/staffs (to be provided on demand) | ||||||
| 4.10 | First year | 60 | Rate/man-day(8 hours) | 1,233 ₹73,980 | 850 ₹51,000 Lowest | 1,180 ₹70,800 |
| 4.20 | Second year | 60 | Rate/man-day(8 hours) | 1,356 ₹81,360 | 850 ₹51,000 Lowest | 1,180 ₹70,800 |
Tender Value
₹2.3 Cr
EMD Value
₹1 L
Closing Date
23 Dec 2024, 6:00 pmClosed
Chief Executive Officer
Park Centre, Technopark Phase I Campus, Trivandrum
OPERATION AND MAINTENANCE OF 110kV SUBSTATIONS AND POWER DISTRIBUTION SYSTEMS AT TECHNOPARK PHASE-III AND TECHNOCITY CAMPUSES, THIRUVANANTHAPURAM
2024_ETPK_716822_1
ETPK/PH-III/2024-25/E-15
Open Tender
AMC/ Maintenance Contracts
Item Rate
110kV substation Technopark Phase-III and IV
Please refer tender documents.
7 documents required · 7 mandatory
₹8,850
₹1 L
Park Centre, Technopark Phase I Campus, Trivandrum
27 Dec 2024
16 Dec 2024
24 Dec 2024
16 Dec 2024
23 Dec 2024
16 Dec 2024
18 Dec 2024
Amount
24 hour Operation and Maintenance of 110kV Substation,Power Distribution System at Technopark Phase-III Campus and 110 kV Digital Substation at Technocity and to provide an expert team competent to attend any breakdown so as to maintain the system with standards of performance as stipulated by KSERC / IE rules from time to time and to effect new service connections,metering consumption etc. as detailed in scope of works and as per the terms and conditions mentioned in the tender document ETPK/PH-III/2024-25/E-15.
Cost for First Year
Service charges for contractor for First Year
Cost for Second Year
Service charges for contractor for Second Year
Cost for Third Year
Service charges for contractor for Third Year
Skilled Labours ( Electricians/Painters/Masons/Cable Jointesr/Welders/ plumbers/fitters/ communication technician etc.) for additional labours/staffs (to be provided on demand)
First year
Second year
Third year
Unskilled labours for additional labours/ staffs ( to be provided on demand)
First year
Second year
Third year
Preventive Maintenance of all the substation equipments including RMU's under the direct control of Technopark in 110kV Substations, Phase-III and Technocity. Manpower and Materiels must be adequate to complete the Maintenance under specified time.( Including Yard, Permises cleaning, Grass cutting etc) as per the terms and conditions mentioned in the tender document ETPK/PH-III/2024-25/E-15. (Details of substation equipments is specified in the tender document ETPK/PH-III/2024-25/E-15.).
110kV Substation Kulathoor, Phase-III
First year
Second year
Third year
110kV Substation, Technocity
First year
Second year
Third year
Fathima Engineering Co. Pvt. Ltd. (BID ID -2024085)
GERESH ELECTRICALS PVT. LTD (BID ID -2031611)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
TD_P3.pdf
Tender Documents • 1.65 MB
BOQ_1131404.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .