Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹8.7 L (5.67%)Admitted-Finance BLOCK NO 269 TO 271 2ND FLOOR B WING JAI GANESH VISION AKURDI AKURDI PUNE MAHARASHTRA 411035 | PUNE | MAHARASHTRA | 411035 | ₹1.6 Cr+₹8.7 L (5.67%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹32.7 L (21.4%)Admitted-Finance G 132 FIRST FLOOR G BLOCK SECTOR 63 SECTOR 63 GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹1.9 Cr+₹32.7 L (21.4%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical 3RD FLOOR BUTTE PATIL COMPLEX KARVE ROAD ERANDWANE PUNE MAHARASHTRA 411038 | PUNE | MAHARASHTRA | 411038 | - | - | Not Admitted-Fee/PreQual/Technical Others-Bid was not in order |
| 5 | Rejected-Technical A 781 SHASTRI NAGAR SHASTRI NAGAR SHASTRI NAGAR DELHI INDIANA 110052 | NORTH DELHI | DELHI | 110052 | - | - | Rejected-Technical TECHNO-COMMERCIALLY NOT QUALIFIED |
| Sl No | Description | Qty | Unit | ISOSCELES Sales & Service Pvt Ltd L2 | ELITE POWERTECH PVT LTD L3 | N K Enterprises L1 |
|---|---|---|---|---|---|---|
| 1.00 | Providing Maintenance assistance for 400kV transmission line works which includes line ground patrolling, tower top patrolling, tree looping / cutting, insulator cleaning during shut-down, fixing of missing tower members, line hardware like copper bonds, vibration dampers, corona rings etc, replacement and other line related maintenance works as per direction of engineer incharge. Quantity is worked out as : For two nos. 400kV grids the requirement will be 02 x 626 = 1252 operations. | 1,252 | Operation | 45,69,800 ₹53,92,364 Lowest | 54,32,428 ₹64,10,265.04 | 45,69,800 ₹53,92,364 Lowest |
| 2.00 | Hourly cost for working beyond 08 hours in one operation for Providing Maintenance assistance for 400kV transmission line works. | 500 | Hrs. | 1,00,000 ₹1,18,000 | 2,72,000 ₹3,20,960 | 50,000 ₹59,000 Lowest |
| 3.00 | Providing maintenance assistance for proper upkeep of 400kV grid sub stations in GM(O&M)-I department on annual basis by carrying out the work of yearly/half yearly/bi-monthly/monthly maintenance activities for the installed bay equipments including all the bus bars, battery banks, feeder panels, Marshalling boxes, C&R panels of all voltage ratings by following the approved OS manual of DTL and other substation related maintenance works as per direction of engineer incharge. Quantity is worked out as : For two nos. 400kV grids the requirement will be 02 x 626 = 1252 operations | 1,252 | Operation | 68,54,700 ₹80,88,546 | 78,08,724 ₹92,14,294.32 | 60,09,600 ₹70,91,328 Lowest |
| 4.00 | Hourly cost for working beyond 08 hours in one operation for Providing Maintenance assistance for 400kV S/Stn works. | 700 | Hrs. | 1,40,000 ₹1,65,200 | 5,47,400 ₹6,45,932 | 1,05,000 ₹1,23,900 Lowest |
| 5.00 | Monthly fixed Charges for providing SUV like Bolero/Sumo/Safari &/or Equivalent capacity vehicles Diesel/Petrol driven for 12 Hrs & 2000 kms. On monthly basis (26 Working days per month (02 Nos. X 24 Months = 48 Nos.) | 48 | Month | 20,25,600 ₹23,90,208 | 16,66,800 ₹19,66,824 Lowest | 24,96,000 ₹26,20,800 |
Tender Value
Refer Docs
EMD Value
₹3.7 L
Closing Date
3 Dec 2020, 1:00 pmClosed
DGM (T) MS
DGM (T) MS
PROVIDING MAINTENANCE ASSISTANCE TEAM (MAT) FOR 400KV TRANSMISSION LINES AND 400KV SUB-STATIONS UNDER GM(OM)-I (400KV S/STN. BAWANA AND TIKRI KALAN).
2020_DTL_196369_1
T20P122242
Open Tender
Miscellaneous Services
Works
730 days
DELHI TRANSCO LIMITED DELHI
AS PER NIT
4 documents required · 4 mandatory
₹0
₹3.7 L
Yes
2 Mar 2022
11 Nov 2020
3 Dec 2020
11 Nov 2020
3 Dec 2020
11 Nov 2020
Providing Maintenance assistance for 400kV transmission line works which includes line ground patrolling, tower top patrolling, tree looping / cutting, insulator cleaning during shut-down, fixing of missing tower members, line hardware like copper bonds, vibration dampers, corona rings etc, replacement and other line related maintenance works as per direction of engineer incharge. Quantity is worked out as : For two nos. 400kV grids the requirement will be 02 x 626 = 1252 operations.
Hourly cost for working beyond 08 hours in one operation for Providing Maintenance assistance for 400kV transmission line works.
Providing maintenance assistance for proper upkeep of 400kV grid sub stations in GM(O&M)-I department on annual basis by carrying out the work of yearly/half yearly/bi-monthly/monthly maintenance activities for the installed bay equipments including all the bus bars, battery banks, feeder panels, Marshalling boxes, C&R panels of all voltage ratings by following the approved OS manual of DTL and other substation related maintenance works as per direction of engineer incharge. Quantity is worked out as : For two nos. 400kV grids the requirement will be 02 x 626 = 1252 operations
Hourly cost for working beyond 08 hours in one operation for Providing Maintenance assistance for 400kV S/Stn works.
Monthly fixed Charges for providing SUV like Bolero/Sumo/Safari &/or Equivalent capacity vehicles Diesel/Petrol driven for 12 Hrs & 2000 kms. On monthly basis (26 Working days per month (02 Nos. X 24 Months = 48 Nos.)
ISOSCELES Sales & Service Pvt Ltd
ELITE POWERTECH PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .