Tender Value
₹9.4 L
Closing Date
10 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
The Executive Engineer, Kachchh Irrigation Construction Division, Bhuj
Restoration work of Canal of Mitti Medium Irrigation Scheme Taluka Abdasa of Kachchh District
290261
SBD/30/2025-26
Open
Civil - All
Kutch
8 documents required · 8 mandatory
₹900
The Executive Engineer, Kachchh Irrigation Construction Division, Bhuj
25 Mar 2026
25 Mar 2026
25 Mar 2026
10 Apr 2026
25 Mar 2026
Memorandum showing items of works to be carried out
Name of work: Restoration work of Canal of Mitti Medium Irrigation Scheme Taluka Abdasa of Kachchh District.
Rates Total Amount
Rates Total Amount
Item of works In Unit according to
No. Quantities In words quantity
1 76,370.00 Jungle clearance of specified category and bushes for canal/dam work as 4.10 Rupees Four and Ten Paisa Sqmt.
directed with depositing material etc complete. ( Excluding tree of grith only.
above 0.5 mt ) A) Upto 2 year old (c) for Heavy dence
2 3064.00 Clearing the silt from canal /drain bed by digging the same to the required 166.00 Rupees One Hundred Sixty Six Cumt.
bed level and gradient including depositing the excavated earth regularly on only.
spoil bank for utilizing the same for preparing the bund after bracking the
clods as and where directed for lead upto 30 mt and lift as under. (Excluding
(A) Depth 0 to 3.0 mt
856.00 Back filling with selected earth brought from out side borrow area ,or from 141.00 Rupees One Hundred Fourty Cumt.
excavated useful material including watering ramming, consolidation with One only.
pneumatic temping and all lead and lift etc complete.
(A) Total Tendered Amount Rs.
(B) Rebate on above tendered amount (if any) ____% (in Figure) Rs. …………………….
(C) Net tendered amount (A - B) Rs. ………………………….
Note-1 All works shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor
under his signature.
Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all
Note-3 conditions, site moisture, weather etc.
To be continued on additional sheets, if found necessary.
Signature of the contractor: Deputy Executive Engineer, Executive Engineer,
Kachchh Irrigation Const. Division
Salinity Control Sub Division
Naliya-Kachchh.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
001 Mitti Canal DTP.pdf
02 Schedule B.pdf
Download all tender documents and submit your bid