Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹1.9 L+₹1,120.61 (0.59%)Accepted-AOC KANNUR | KERALA | 670001 | L2 | Accepted-AOC accepted as lowest since they are labour contract co-operative society and having 10percentage preference over the lowest bidder | |
| 2 | L1₹1.9 LRejected-AOC | L1 | Rejected-AOC lowest.ButULCCS having 10percentage preference over the lowest bidder |
Tender Value
₹1.9 L
EMD Value
₹4,800
Closing Date
10 Feb 2020, 6:00 pmClosed
ExecutiveEngineer, Irrigation Division, Kozhikode
Office of theExecutive Engineer, Irrigation Division,Civil Station, Kozhikode- 673020
Soil Investigation for rectification of EK Canal between Karaparamba road bridge and Mudapattupalam jeepable bridge in kozhikode Corporation
2020_Irrig_336416_2
EEIK/ET-39/2019-20
Open Tender
Civil Works - Others
Item Rate
90 days
Kozhikode corporation
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
online
₹4,800
Yes
23 Jun 2020
3 Feb 2020
14 Feb 2020
3 Feb 2020
10 Feb 2020
3 Feb 2020
Amount
Investigation
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
56.3.a.1 : Boring with rotary power drilling equipment's inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.
56.3.a.2 : Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For under water.
56.3.b.1 : Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil
56.3.b.2 : Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For under water.
56.5.a : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In land.
56.5.b : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In water.
56.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.
56.9.1 : Erecting platform over 2 nos of 2nd Class Boat USING Mango wood planks of of not less than 30 mm thick, Mango wood joists of 100mm x 70mm at 60cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete excluding hire of boats (A Platform of Minimum size 6.00m x 5.00m will be required)
56.10 : Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.
56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes.
60.11.1 : FIXING TBM- Supplying and fixing TBM with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, painting top and sides of pillar with synthetic enamel paint, lettering in the pillar block with 8cm high "TBM" on one face and the reduced level on the outer face, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation.
60.11.2 : Taking FLY LEVELS- from the nearest GTS BM and closing on the starting BM including conveyance of instruments etc along road or in heavily built up area or in roads with heavy traffic or in thick jungle ( out turn 4000 m / day )
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
56.8 : Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
Bidder Name
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
AFNAN ASHRAF V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_475836.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .