| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹11.4 L+₹43,850 (4.01%)Rejected-Finance 4 E K N BANERJEE ROAD KOLKATA 700 057 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700057 | L2 | Rejected-Finance NOT L1 BIDDER | |
| 3 | L3₹14.3 L+₹3.4 L (31.2%)Rejected-Finance | L3 | Rejected-Finance NOT L1 BIDDER |
Tender Value
₹18.2 L
EMD Value
₹36,333
Closing Date
20 Jul 2020, 3:00 pmClosed
The GM,STPS
1st floor of Administrative Building, STPS.
Painting of structural members of track hopper at STPS.
2020_WBPDC_285605_1
WBPDCL/STPS/NIT/E2118/20-21
Open Tender
Support/Maintenance Service
Item Rate
120 days
STPS, WBPDCL
As given in NIT.
3 documents required · 3 mandatory
₹1,180
The West Bengal Power Development Corporation Ltd.
₹36,333
1st floor of Administrative Building, STPS.
22 Jul 2021
24 Jun 2020
23 Jul 2020
25 Jun 2020
20 Jul 2020
5 Jul 2020
3 Jul 2020
Amount
Removing old paint from blistered painted surface of steel or other metal by chipping including scraping and cleaning and exposing the original surface.
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality(approved make and brand) including smoothening surfaces by sand papering etc.
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary. (Including scaffolding up to any height) (a) On steel or other metal surface : With super gloss (hi-gloss) - (i) Two coats (with any shade except white with first coat with light shade & second coat with deep shade as per instruction of E.I.C)
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Supply of UPVC pipes (B Type) & along with all necessary fittings conforming to IS-13592-1992 along with all necessary arangement including labour in all respect to divert the existing rain water pipe at the site of work as per direction of E.I.C.
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. For structural members of specified sections weighing less than 22.5 Kg./m
RUDRA ENTERPRISE
Pearl Corporation
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .