Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 34 SANJAY BUILDING NO 6 ANDHERI KURLA ROAD ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 55 A HANUMAN BLDG 3RD FLOOR 308 PERIN NARIMAN STREET FORT MUMBAI MAHARASHTRA 400001 UDYAM MH 19 0022488 27AFCPS6977F1ZX R M MSME STATUS AS VERIFIED | MUMBAI | MAHARASHTRA | 400001 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
18 Nov 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM 530014
REMOVAL OF AK100 SYSTEM AND INSTALLATION OF SRGM SYSTEM IN SHIP
2021_NAVY_483783_1
COM/OFF/WEA/20-21/932
Open Tender
Marine Services
Turn-key
60 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
NAVAL DOCKYARD VISAKHAPATNAM
17 Jan 2022
25 Oct 2021
19 Nov 2021
25 Oct 2021
18 Nov 2021
4 Nov 2021
25 Oct 2021 - 18 Nov 2021
29 Oct 2021
180 days
Removal of AK 100 and Installation of SRGM system.Degutting of existing AK 100 barbette structure and AK 100 equipment room including removal of following 01 – Training Amplidyne, Elevation Amplidyne, Convertor starts station, Distribution device, regulated resistance 122M, load unit, 02 breaker panel, HCOS, voltage regulated, BACK rectifier & rectified filter 02 – junction box, distribution box, relay board, counter unit, power supply unit. All items are to be removed from ship and are to be un shipped/taken to yard.
Removal of AK 100 and Installation of SRGM system.Degutting of following units prior removal of AK 100 & Regutting post fitment of SRGM mounting- (i) Interphones – 01 (ii) Main Broadcast Speaker – 02 (iii) Lighting Panels -08 (iv) Fire Fighting/Ammunition Sprinkling system (v) Amplifier unit at T- 91 E Control Post (vi) Amplifier Unit at intermediate Compartment. All items are to be removed from ship and are to be unshipped/taken to yard..
Removal of AK 100 and Installation of SRGM system.Removal of all cables of AK 100 handling from room and D(y) unit in T 91 control post length 2500 Mtr’s. All cables are to be removed from ship and are to be unshipped/taken to yard.
Removal of AK 100 and Installation of SRGM system.Under turret Compartment-Removal of device LCC. Hydraulic pump, Automatic Loader, Microtek, deck underlay, Lagging from bulkhead/ decks to facilitate installation of foundation and support. All items are to be removed from ship and are to be unshipped/ taken to yard.
Removal of AK 100 and Installation of SRGM system.Removal of old AK 100 E 214 Hoist.
Removal of AK 100 and Installation of SRGM system.Blanking of AK 100 E 214 Hoist.
Removal of AK 100 and Installation of SRGM system.A new foundation is required to be manufactured. Further a raised platform is required to be constructed to augment the height of the existing intermediate compartment of AK 100 gun mount so as to house the SRGM Revolving feed Mechanism and other sub units. Fabrication of the following (i) Main Gun deck of elevated height as per the WLDs (ii) Structural modification of barbette.
Removal of AK 100 and Installation of SRGM system.Surface preparation, Machining and deck strengthening for fitment of base plate and foundation of SRGM. Modify the gun deck and deck. Prepare and install pre-fabricated Barbette with Gun rings as per tolerances and procedures enumerated as per the installation manual, Drilling of holes, aligning and 1installation of Gun seating base with machining of pedestal and tolerance for seating pedestal is +0.2mm. Holes of seating base are to be drilled at sight to suite the base of the gun.
Removal of AK 100 and Installation of SRGM system.Fabrication of platform and bracket for fitment of following – (i) COTS console (ii) Earrel Cooling control panel (iii) Local Stabilization unit (iv) Convertor -06 in no’s (v) Distribution boxes – 08 in no’s (vi) System control unit (SCU) Equipment installation of the following in equipment Room – EJIB-III, 01- External system interface (ESI) LC, 03- Switch Fuse Unit (SFU) 1- TR, ACOS C1- Convertor, 01- Starter.
Removal of AK 100 and Installation of SRGM system.Preparation of non – water tight compartment with minor bulkhead partition and a door in gun handling room for housing COT console panel.
Removal of AK 100 and Installation of SRGM system.Piercing of Deck/Bulkhead at 05 different places for passing cables and there after gland packing after completion of cabling.
Removal of AK 100 and Installation of SRGM system.Manufacture and fitment of cable securing bancs along existing/new cable trays and cable gland sealing’s.
Removal of AK 100 and Installation of SRGM system.Laying of cable of approximately 5000mtrs, Cable Laying-System cables for date and power supply are to be laid and associated channel plates are to be manufactured and installed as per cable scheduled provided In BP power supply from switchboard power supply cable is to be laid down as per the layout provided in BP.
Removal of AK 100 and Installation of SRGM system.Modification of sea and fresh water line for SRGM cooling system from control unit panel installed in Gun bay.
Removal of AK 100 and Installation of SRGM system.Fabrication and fitment of SRGM 76mm ammunition racking magazine 3 which has capacity of 1222 shells.
Removal of AK 100 and Installation of SRGM system.Installation of ALH as per WLDs.
Removal of AK 100 and Installation of SRGM system.Air trunking to be modified to provide AC in COT panel console compartment. The barbette of SRGM is proposed to be fitted in the existing intermediate compartment (IC) of AK 100. The existing air conditioning arrangement in intermediate compartment is not suitable. In order to augment the air conditioning in the IC extended the existing 03/05 AC trunkings in the UTC (just below IC) to the intermediate compartment (IC).
Removal of AK 100 and Installation of SRGM system.Shifting Door of Equipment room as per WLDs.
Removal of AK 100 and Installation of SRGM system.Provisioning of all the lagging and welding material during degutting and welding of all devices and compartments.
Removal of AK 100 and Installation of SRGM system.Connectorisation of over 100 connectors and glands for powering up the system with associated cables booting for the same. Carry out checks for the cable continuity and Connectorisation as per respective connector details.
Removal of AK 100 and Installation of SRGM system.Manufacture fitment of Metallic cable tallies, fitment of securing brackets to hold/fasten pipe line foe cooling system.
Removal of AK 100 and Installation of SRGM system.Manufacture and fitment of clamps for mounting channel trays, ventilation trunking and bulkhead mount devices as required.
Removal of AK 100 and Installation of SRGM system.Provisioning of all tool, slings, vehicles any other item required for undertaking above mentioned job.
ULTRADIMENSIONS PVT LTD
sowmya enterprises
SAGAR SHIP REPAIRERS AND MARINE SERVICES
WINTECH ENGINEERING WORKS
SINAXIS ENTERPRISES PVT LTD
YEOMAN MARINE SERVICES PVT. LTD.
H and H Precision Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .