Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 113 SITAPUR NEAR SABJI MANDI BEHIND MAIDA MEEL HARIDWAR | Admitted-Finance |
| 2 | Admitted-Finance B 403 G D COLONY MAYUR VIHAR PHASE 3 DELHI | Admitted-Finance |
| 3 | Admitted-Finance 136 AVAS VIKAS RISHIKESH | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
1 Sept 2021, 11:00 amClosed
Executive Engineer
Electricity Distribution Division, Rishikesh
WORK OF DOING MRI OF KCC CONSUMERS HAVING LOAD FROM 5 KW TO 75 KW and Solar Consumer and Jal Sansthan and State Tubewells and Non KCC (5 KW to 25 KW ) Consumers IN DIFFERENT CATEGORIES IN EDD Rishikesh Division
2021_UPCL4_35520_1
15/EDD(R)/2021
Open Tender
Miscellaneous Services
Item Rate
365 days
Rishikesh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
EE, EDD, Rishikesh
Exempted
3 Sept 2021
17 Aug 2021
1 Sept 2021
17 Aug 2021
1 Sept 2021
23 Aug 2021
Amount
Work of doing MRI of KCC Consumers having load from 5 kw to 75 kw and Solar Consumer and Jal Sansthan and State Tubewells in different categories like RTS-1,RTS-2,RTS-3A,RTS-3B,RTS-3C,RTS-4,RTS-5,RTS-6 etc. by 8 th day of every month . In above work Detailed MRI Report with phasors, instantaneous parameters, monthly consumption, tamper event report, load survey report etc shall be provided in hard copy as well as in soft copy to the concern Distribution division of EDD Rishikesh . Above Work shall also include the Bill Distribution work of above Consumers. Cost of manpower engaged , vehicle utilised , fuel expenditure ,MRI cost , Paper, soft media like CD/pendrive/Hard disk etc. shall be inclusive in above rates . However taxes shall be paid extra as per actuals.
Work of doing MRI of Non KCC Consumers having load from 5 kw to 25 kw in RTS-2 by 8 th day of every month. In above work Detailed MRI Report with phasors, instantaneous parameters, monthly consumption, tamper event report, load survey report etc shall be provided in hard copy as well as in soft copy to the concern Distribution division of EDD Rishikesh . Cost of manpower engaged , vehicle utilised , fuel expenditure ,MRI cost , Paper, soft media like CD/pendrive/Hard disk etc. shall be inclusive in above rates . However taxes shall be paid extra as per actuals.
PEAKHILLS GLOBAL PRIVATE LIMITED
RISHIGA ENGINEERING TECHNOLOGIES PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .