Loading…
Loading…
Tender Value
₹11.5 L
EMD Value
₹23,100
Closing Date
11 Jul 2026, 4:00 pm2d left
Executive Engineer INFC Division Kargil
Executive Engineer INFC Division Kargil
Upgradation of Pond Rzing at Tingdo.Under revival of existing Rzing Ponds of District Kargil
2026_PWD_19140_1
Fresh e-Tender 06 of 2026-27/INFC Kargil
Open Tender
Civil Works - Canal
30 days
Tingdoo Kargil
Ref to NIT
4 documents required · 4 mandatory
₹120
Executive Engineer INFC Division Kargil
₹23,100
1 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
11 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Silt clearance from water Reservior inclusive of initial lead and lifts 50 Mtr. And 1.5 mtr respectively. | |||||
| 1.01 | A). Silt Clearance in wet condition 40% | 86.49 | Cum | 148.71 | ₹12,861.93 |
| 1.02 | B). Silt Clearance in wet condition 60% | 129.74 | Cum | 89.07 | ₹11,555.94 |
| 2 | Providing and laying of soling stone excluding cost of stone. | 36.04 | Cum | 225.14 | ₹8,114.05 |
| 3 | Providing and Laying of 15mm thick cement plaster finished with a floating coat of neat cement mix (1:3) finished with cement slurry complete. | 186 | Cum | 456.03 | ₹84,821.58 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. above plinth level up to floor five level,
excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size) (Crushed) | 49.99 | Cum | 10,742.59 | ₹5,37,022.07 |
| 5 | Reinforcement for RCC work including its cutting bending in shape and placing in position complete. | 2,999.25 | Kg | 105.78 | ₹3,17,260.67 |
| 6Carriage of material from source to site of work including loding un loading and stacking complete | |||||
| 6.01 | (i)(Sand and bagree) by an avg lead of 40 Km by MT 2000 Mtr by MT | 66.77 | Cum | 2,317.27 | ₹1,54,724.12 |
| 6.02 | (ii)Cement by an avg lead of 40 Km by MT 2000 Mtr by Headload | 21.58 | MT | 1,221.04 | ₹26,350.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.29 MB
BOQ_45604.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid