Tender Value
₹83.4 L
EMD Value
₹84,000
Closing Date
15 Jul 2026, 7:00 pmClosed
Executive Engineer, R&B Division, Bhuj
Providing Paver Block & Compound Wall at Sarkari Kumar Chhatralay (A.Ja.) Ganeshnagar at bhuj-Kutch
322213
28 of 2026-27
Open
Repair and Maintenance
Works
Kutch
10 documents required · 10 mandatory
₹2,400
Executive Engineer, R and B Division, Bhuj
₹84,000
8 Jul 2026
8 Jul 2026
8 Jul 2026
15 Jul 2026
8 Jul 2026
Name of work :-
Providing Paver Block & Compound Wall at Sarkari Kumar Chhatralay (A.Ja.) Ganeshnagar at bhuj-
Bill of Quantity
Memorandum showing items of works to be carried out.
Qty. Estimated Rates Total amount
Qty. Estimated Rates Total amount
It. Estimated according to
Item of work Unit
No. but may be estimated
more or less In Figures In Words Quantities
1 0.80 Clearing & Grubbing road land including 28455.09 Rupees Twenty Hect
uprooting rank vegation grass bushes Eight Thousand
shrabs saplings and trees girth up to 300 Four Hundred
mm removal of stumps of trees cut Fifty Five And
earlier and disposal of unserviceable Paise Nine Only
materials.( C ) By Mechanical Means
2 485.60 Providing and laying ordinary cement 3956.63 Rupees Three Cmt
concrete M-150 and curing complete Thousand Nine
including the cost of form work but Hundred Fifty
excluding cost of reinforcement for Six And Paise
reinforced concrete work in (a) Sixty Three
Foundations, footings bases of columns Only
and Mass Concrete.
3 6480.00 Providing and fixing pre-cast Rubber Dye 706.93 Rupees Seven Smt.
/ steel Dye inter locking concrete block Hundred Six
60mm thick with grade of concrete M300 And Paise
pnumatic compressed / vibrated Ninety Three
mechanically and as per approved design Only
Confirming to IS 15658 : 2006 including
35 mm Sand layer for levelling and filling
the joint with sand in proper line and
level as per guidlines of IRC : SP 63-2018
4 150.00 Brick work using common burnt clay 4214.33 Rupees Four Cmt
building bricks having crushing strength Thousand Two
not less than 35 kg./Sq.Cm. in Hundred
foundation and plinth in Cement Mortar Fourteen And
1:6 (1- Cement : 6 -fine sand)(B) Paise Thirty
Conventional Three Only
5 1062.00 Providing 20mm thick sand faced cement 315.69 Rupees Three Smt.
plaster on wall upto height 10 meters Hundred
above ground level consisting of 12 mm Fifteen And
thick backing coat of C M 1 : 3( 1 Paise Sixty Nine
cement : 3 sand) and 8 mm thick Only
finishing coat of C M 1:1 ( 1 cement :
sand ) etc complete
D:\AB-2\Tender\Online\Pending\New\Bhuj DTP\DTP- Kumar Chhtralay Bhuj\Kumar Chatralaya ganesh nagar DTP
Qty. Estimated Rates Total amount
Qty. Estimated Rates Total amount
It. Estimated according to
Item of work Unit
No. but may be estimated
more or less In Figures In Words Quantities
6 1963.00 Finishing wall (Three coats) with weather 268.66 Rupees Two Smt.
proof exterior emulsion paint of approved Hundred Sixty
brand and manufacture and of required Eight And Paise
shade to give an even shade over and Sixty Six Only
including one coat of primer after
thoroughly brushing the surface to
remove all dirt and remains of loose
powered materials for all height.
7 18.00 Providing and laying cement concrete 4084.01 Rupees Four Smt.
1:3:6 (1- Cement : 3- Coarse sand : 6- Thousand
crushed stone aggregates 20 mm Eighty Four
nominal size) and curing complete And Paise One
including cost of formwork in (A) Wall Only
8 1170.00 Providing TMT Bar FE 500D 77.29 Rupees Seventy Kg.
reinforcement for R.C.C. work including Seven And
bending, binding and placing in position Paise Twenty
complete upto floor two level Nine Only
9 390.00 Providing and fixing concertina razor 399.96 Rupees Three Rmt.
blade coil fencing with punched tape Hundred Ninety
concertina coil 600 mm dia 45 mt Nine And Paise
openable length having 24 no rounds per Ninety Six Only
6 mt length, upto 3mt height of wall with
existing angle iron (50mm x50mm x5mm
)requird shaped As per Directed
Engeenier in charge. placed 2.4mt or
3.00mt apart and with 4 horizontal
R.B.T. reinforced barbed wire(3 mm)
stud tied with G.I. staples and G.I. clips
to retain horizontal, including necessary
bolts or G.I.barbed wire tied to angle
iron, all complete as per direction of
Engineer-in-charge, with reinforced
barbed tape (R.B.T.)/Spring core (2.5 mm
thick) and weight 43.478 gm/meter at
Rupees Eighty Three Lakh(s) Thirty Nine Thousand Seven Hundred Twenty Seven And Paise Seventy Four
D:\AB-2\Tender\Online\Pending\New\Bhuj DTP\DTP- Kumar Chhtralay Bhuj\Kumar Chatralaya ganesh nagar DTP
Qty. Estimated Rates Total amount
Qty. Estimated Rates Total amount
It. Estimated according to
Item of work Unit
No. but may be estimated
more or less In Figures In Words Quantities
*Estimated amount *Estimated amount
Put to tender Rs……………………… Put to tender Rs………………………
Deduct : ………% below Add : ………% above
Net Rs……………………… Net Rs………………………
In words ……………………………… In words ………………………………
*(please strike out whichever is not applicable)
Note-1 The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
Note-2 Labour Cess shall be recovered as per SBD
Note-3 GST and Income tax TDS will be deducted at a source while making payments of bills
Note-4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Signature of Contractor Executive Engineer
R&B Division, Bhuj
D:\AB-2\Tender\Online\Pending\New\Bhuj DTP\DTP- Kumar Chhtralay Bhuj\Kumar Chatralaya ganesh nagar DTP
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GR.pdf
BUILDING SPECIFICATIONS BOOK.pdf
Additional Instructions.pdf
BOQ.pdf
Specification Index.pdf
Specification.pdf
SBD Book.pdf
ROAD WORK Booklet - 1.pdf
ROAD WORK Booklet - 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .