Loading…
Loading…
Tender Value
₹52.5 L
EMD Value
₹53,000
Closing Date
16 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
The Executive Engineer, Kachchh Irrigation Construction Division, Bhuj
Construction of Small River Checkdam kathda Near Village : - Kathda Tal : - Mandvi - Kachchh
292951
SBD/33/2025-26
Open
Civil - All
Kutch
9 documents required · 9 mandatory
₹2,400
The Executive Engineer Kachchh Irrigation Construction Division Bhuj
₹53,000
1 Apr 2026
1 Apr 2026
1 Apr 2026
16 Apr 2026
1 Apr 2026
Memorandum showing items of works to be carried out
Name of work: Construction of Small River Checkdam kathda Near Village : - Kathda Tal : - Mandvi - Kachchh.
Rates Total Amount
Rates Total Amount
Quantities Item of works In Unit according to
No. In words quantity
1 2,750.00 Jungle clearance of specified category and bushes for canal/dam work as 5.90 Rupees Five and Sqmt
directed with depositing material etc complete. Ninty Paisa only.
(Excluding tree of grith above 0.5 mt)
c) For Heavy dence
2 3,296.14 Excavation in all sorts of strata and formations including depositing the 79.00 Rupees Seventy Cum
unuseful execavated stuff as and where directed including sorting Nine only.
useful materials as required and up to leads of 200 mt. and all lift etc.
complete. Incl. de-watering.
( a ) in overburden including hard murrum
3 32.68 Providing & laying in position cement concrete using cement, sand and 2762.00 Rupees Two Cum
crushed metal (40 mm MSA) coarse aggregate by mass and machine mix Thousand Seven
for PCC including necessary compaction by hand tamping, curing as Hundred Sixty Two
directed with all lead & all lift etc complete. C.C in 1:4:8 For Foundation Only.
Levelling course
4 1,022.350 Providing & laying in position cement concrete using cement, sand and 3465.00 Rupees Three Cum
crushed metal coarse aggregate by mass and machine mix for PCC/RCC Thousand Four
including necessary formworks compaction by vibrator , curing as Hundred Sixty Five
directed with all lead & all lift etc complete. (Excluding Cost of Steel ) For Only.
Body wall , Apron, Training wall , side wall, splay wall , key wall cut off
4/E) Nominal Mix Conc. Grade 1:2:4 and MSA-40mm
5 9.015 Providing, cutting, bending, binding and fixing in position as per drawing 76574.00 Rupees Seventy M.T
TMT BAR reinforcement for R.C.C. works and anchor bars incl cost of Six Thousand Five
black annealed 16 to 18 BWG M.S. wire etc. complete with all lead and Hundred Seventy
lift. Four only.
6 81.14 Earthwork / Back filling with selected earth brought from out side 141.00 Rupees One Cum
borrow area excavated useful material including watering ramming, Hundred Forty
consolidation by hand temping and all lead and lift etc complete One only.
7 6,150.00 58.00 Rupees Fifty Eight Cum
Rehandling the excavated stuff incl stacking as and where directed for only.
all sort of soil, soft murrum, hard murrum, soft rock, hard rock etc. for
specified lead as under and all lift incl loading unloading transportation
etc complete without rolling and watering. (b) Lead 200 to 500 mt.
8 1,600.00 Providing and laying dry rubble stone pitching without base inverted 176.00 Rupees One Sqmt
filter/murrum bedding and header stone including hand packing & Hundred Seventy
trimming & dressing slopes etc complete. Six only.
a) 15 cms thick stone pitching
9 1.00 1350.00 Rupees One No.
Providing and fixing in position white marbleplate 45cmx45cmx1.80 cm Thousand Three
size including engraving for letters as per drawing/as directed etc. Hundred Fifty
(A) Total Tendered Amount Rs.
(B) Rebate on above tendered amount (if any) ____% (in Figure) Rs..
(C) Net tendered amount (A -
All works shall be carried out as per Public Works Department Handbook and other specifications of Division or as
All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the
contractor under his signature.
Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and hold good for
work under all conditions, site moisture, weather etc.
Note-4 To be continued on additional sheets, if found necessary.
Signature of the contractor:
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
001 Kathda Small CD DTP.pdf
SCH-B.pdf
Download all tender documents and submit your bid