Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC 164 HIRANI NAGAR OPP SIDDHI VINAYAK TEMPLE MADHAPAR KUTCH 370 020 | KACHCHH | GUJARAT | 370020 | L1 | Accepted-AOC Being lowest tenderer | |
| 2 | L2₹2.8 L+₹1,460 (0.52%)Rejected-Finance | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹2.8 L+₹2,460 (0.88%)Rejected-Finance | L3 | Rejected-Finance Not L1 | |
| 4 | L4₹2.8 L+₹2,460 (0.88%)Rejected-Finance | L4 | Rejected-Finance Not L1 | |
| 5 | L5₹2.8 L+₹2,810 (1.01%)Rejected-Finance WANIAWAD BHUJ KUTCH 370001 | BHUJ | KUTCH | GUJARAT | 370001 | L5 | Rejected-Finance Not L1 |
Tender Value
Refer Docs
Closing Date
16 Sept 2020, 3:00 pmClosed
GE (AF) Bhuj
GE (AF) Bhuj, Bhuj-Kutch-370001
Repair of maintenance of transformer 150 KVA capacity Dry type feeding to MAFI eqpt at AF Stn Bhuj
2020_MES_375052_1
3020/eQ/23/20-21/E3
Limited
Job Works
Item Rate
30 days
GE (AF) Bhuj
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
7 Oct 2020
5 Sept 2020
17 Sept 2020
5 Sept 2020
16 Sept 2020
5 Sept 2020
Amount
(7) M&L for inserting of HT and LT coils on limbs rewinding here in before after cleaning of lamination in proper way and also after insulating the limbs with requisite insulating material on limbs in between limbs and coils.(Each Job 1) (8) M&L for re-arranging the top lamination over coils in proper manner including fixing of channel soldering in between coils as necessary and brazing work for star delta connection. (Each Job 1) (9) M&L for baking the core assembly in the oven duly varnishing the coil to imrove IR value and to eliminate moisture content in it complete. (Each Job 1) (10) M&L for inserting the core assembly after baking in the enclosure and making connection with HT and LT bushing studs and closing the enclosure by side panel with suitable nut, bolts and washers etc.(Each Job 1) (11) Supply and fixing in replacement of porcelain transformer bushing on LT 1100 Volt side including brass stems conical bush and suitable gasket cover for transformer. (Each 4) (12) Supply and fixing in replacement of porcelain transformer bushing on HT 11 KV side including brass stems conical bush (Each 3). (13) M&L for preparation of old painted surfaces, by brushing /cleaning stains, greasy spot with thinner applying two coats synthetic enamel paint by spray painting complete. (14) Loading of serviceable transformer from workshop and unloading at work site. (Each Job 1) (15) Connection of dry type transformer along with OLTC with HT side Cable and LT side bus bar at work site sub station. (16) Final testing of transformer at site with giving existing load on it complete all as specified and as directed by Enger-In -Charge.
Jyoti Refrigeration
Hi-Tech Systems
BHAVANI PROVISION STORES
M/s Bombay Novelty Stores
Bhavik Construction
JOY ENTERPRISE
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_418407.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .