| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC | ₹2.8 Cr | L1 | Accepted-AOC As per NIT Only lowest price is accepted |
| 2 | L2₹3.4 Cr+₹59 L (21.1%)Rejected-AOC | ₹3.4 Cr+₹59 L (21.1%) | L2 | Rejected-AOC As per NIT Only lowest price is accepted |
| 3 | L3₹3.6 Cr+₹79.8 L (28.5%)Rejected-AOC 114 3 KASUNDIA ROAD HOWRAH 711101 | HOWRAH | WEST BENGAL | 711101 | ₹3.6 Cr+₹79.8 L (28.5%) | L3 | Rejected-AOC As per NIT Only lowest price is accepted |
| 4 | L4₹3.6 Cr+₹83.8 L (29.9%)Rejected-AOC MONIGRAM MURSHIDABAD WB 742237 | MURSHIDABAD | WEST BENGAL | 742237 | ₹3.6 Cr+₹83.8 L (29.9%) | L4 | Rejected-AOC As per NIT Only lowest price is accepted |
| 5 | L5₹4.4 Cr+₹1.6 Cr (55.7%)Rejected-AOC | ₹4.4 Cr+₹1.6 Cr (55.7%) | L5 | Rejected-AOC As per NIT Only lowest price is accepted |
Tender Value
₹3.7 Cr
EMD Value
₹7.5 L
Closing Date
1 Jun 2022, 4:00 pmClosed
GM(M and C)
WBPDCL Corporate Office
Evacuation of settled ash from Ash Pond, transportation, disposal in eco-friendly manner of Sagardighi Thermal Power Project -7th Phase
2022_WBPDC_379305_1
WBPDCL/CORP/NIT/E1545/22-23
Open Tender
Miscellaneous Services
Item Rate
180 days
SgTPP
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7.5 L
Yes
WBPDCL Corporate Office
5 Aug 2022
6 May 2022
3 Jun 2022
6 May 2022
1 Jun 2022
25 May 2022
19 May 2022
Amount
Evacuation of settled ash from Ash Pond, transportation, disposal in eco-friendly manner of Sagardighi Thermal Power Project (7th Phase)
Evacuation of settled pond ash from the existing ash pond by deploying excavating machineries and other accessories including loading into dumpers at work site and unloading at destination including the carriage of the same for any lift and lead at both loading and unloading points, dressing at desired level at disposal areas including covering up the filled ash with minimum 300 mm thick earth after attaining the required level, all as per direction of the EIC. Approved disposal area beyond a distance of 10 km radius from ash pond is to be arranged by the contractor. Water is to be sprinkled at the loading point as well as the unloading point including movement during transport over road to prevent air pollution. Mode of transport will be as per rules, notification and guide line of Ministry of Environment, Forest and Climate Change and other related departments. Excavations will be done in correct profile, slope and providing proper berms at respective levels without damaging the safety and stability of the existing embankment of ash pond, including mending damages and rectification of existing embankment as per direction of Engineer-in -Charge, if required. The work is to be executed strictly as per the Scope of Work, Special Terms and Conditions, General Terms and Conditions of the Contract, Safety Clause mentioned in NIT etc. all in addition to the above. The rate includes any dewatering of ash pond and excavated pits, necessary for execution of work, arising out of seepage, rains and whatsoever. (Measurement will be made on the basis of pre-work and post-work levels of the area of ash Pond handed over for evacuation). Note: The necessary clearance / permission from the land owner / mine authority and from other authority/department like SPCB/CPCB as required has to be arranged by the agency/contractor and the same will be submitted to the E.I.C for his approval. Evacuation of Pond Ash will be started after obtaining approval from EIC.
COLLATE BUILDERS PRIVATE LIMITED
CHAKRABORTY CONSTRUCTION
BLUE HILL INTERNATIONAL
M/S SAHA AND MONDAL CONSTRUCTION
Hindustan Construction Company Limited
NOVEL ENGINEERING AND TECHNICAL WORKS PVT LTD
NKAS Services Private Limited
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .