Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical Technically Unsuitable |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
28 Oct 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Upgradation of Object Launcher
2022_HSL_91343_1
20 / OBJECT LAUNCHER / 137 / 2022-23
Open Tender
Miscellaneous Services
Service
10 days
HSL Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹944
Yes
HSL
₹70,000
Yes
3 Nov 2022
18 Oct 2022
28 Oct 2022
18 Oct 2022
28 Oct 2022
18 Oct 2022
Amount
SUPPLY & WORK FOR OBJECT LAUNCHER UPGRADATION: THE BIDDER SHALL QUOTE AS PER THE SCOPE OF WORK ENCLOSED ANNEXURE-A & B
The control system for the Object launcher is to have the facility to limit the lowering of the tube only up to the height required for loading of object and hold (in the loading position) and up to the height required for resting the object and hold (in the storage position). The operator should be able to enter this height as input in the control panel. The length sensor and damaged wires associated with this feature are to be replaced ( length sensor to be replaced from the spare unit). All source codes related to system shall be taken care. Details 1. PLC program to be modified. 2. Damaged Length Sensor to be replaced. (To be replaced from 2nd unit and replenished) 3. Damaged Electrical Cables to be replaced
The control system Object launcher to retain the earlier capability of lowering the tube up to the full depth as per original in launching operation. Details: PLC program to be modified.
Provision of Audio and Visual alarm for limiting of downward telescopic motion during loading or resting condition. Necessary cables and harnesses are to be supplied and assembled. Details: PLC program to be modified. New Items required : 1. Voice Alarm, 2. Flasher & 3. Cables, harnesses
The display panel available at the control cabin for Object Launcher is to be repaired.
Pair of Lift cylinders are to be replaced as there is leakage and scoring on rods. (To be replaced from 2nd unit and replenished)
Wear pads of boom are worn out and to be replaced along with the retainers
Slew mechanical lock linkage to be made more robust
Proper routing and dressing of cables (except Power cables) between control cabin and object launcher. Details: Scope limited to cables for launching system only and not for the object tube.
Door lock and handle of the control cabin is to be replaced. It should be surface coated with suitable rust proof, corrosion proof coating.
The temperature controller system available at the control cabin is to be repaired.(New Unit to be purchased and installed)
Length Sensor drum assembly is damaged and to be replaced
Hydraulic hoses with rusted end fittings are to be replaced by hoses with SS end fittings
Slew Control Valve is rusted and to be replaced. (To be replaced from 2nd unit and replenished)
Hydraulic cylinder shaft flexible cover required. (As preventive action)
Proximity sensors for Slew motion to be replaced
All lights to be replaced
DC power required inside operator's cabin. (24V DC 10 amps would be provided)
Hydraulic oil low level indication required
Slew Unit seal kit to be replaced
Rotary column seal kit to be replaced as preventive action
Seals of Cylinders and Motors are to be replaced.
Hydraulic pumps to be overhauled including supply of Hyd. Oil, Grease and gear Oil.
Rust removal, followed by repainting and greasing is to be carried out on the Object Launcher. The colour of the paint should be Smoke Grey. There will be four coats of painting: i. Primer (1 coat of 50µ) ii. Intermediate coat of Anticorrosive paint (2 coats of 125µ each) iii. Top coat of Polyurethane (1 coat of 60µ)
NOTE : The following shall be considered while quoting a. All the necessary tools and tackles are to be carried by the firm representatives. However, cranes,consumables, power sources and workshop facility for minor jobs will be arranged by HSL. b. HSL reserves the right of deploying its representative during repair, installation, training and testing. c. Training on operation and routine maintenance is to be provided to the Ship officers and staffs regarding operation of tube and all its subsystems and their routine maintenance. (For the launching system only, excluding the tube.) d. Document regarding operation and routine maintenance of tube and all its subsystems nd their routine maintenance. Is to be submitted to Ship officials and a copy to be submitted to HSL. (For the launching system only, excluding the tube.) e. Installation. f. Warranty: One Year Warranty for the works carried out. g. To & fro travel expenses, lodging and boarding. h. Man day cost of Service Engineers. i. Support during launching
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .