Tender Value
Refer Docs
EMD Value
₹24.6 L
Closing Date
8 Oct 2020, 9:00 amClosed
ASD
NAVAL DOCKYARD VISAKHAPATNAM
MR OF SD PONTOON 20
2020_NAVY_380247_1
COM/0335/SD PONTOON/MR OL-19/RT/A
Open Tender
Marine Services
240 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹24.6 L
Yes
MDS CONFERENCE ROOM
21 Oct 2020
23 Sept 2020
9 Oct 2020
24 Sept 2020
8 Oct 2020
24 Sept 2020
24 Sept 2020 - 8 Oct 2020
28 Sept 2020
00001 Carryout the following jobs on hull (Under water Area : 1738 sq.m and top side Area : 143 sq.m a) Scrapping to be done for the under water portion of hull and top side area.
00001 Carryout the following jobs on hull (Under water Area : 1738 sq.m and top side Area : 143 sq.m b) Hydro jet cleaning to be done for the under water portion of hull and top side area.
00001 Carryout the following jobs on hull (Under water Area : 1738 sq.m and top side Area : 143 sq.m c) Grit blasting to SA 2.5 standard to be carried out on complete under water area
00001 Carryout the following jobs on hull (Under water Area : 1738 sq.m and top side Area : 143 sq.m d) USG survey reading to be taken for entire area (Points: 5 sq.mtrs)
00002 Renew following sacrificial anodes (Anodes supplied by Navy):- a)Flush mounted type: 22 no’s
00002 Renew following sacrificial anodes (Anodes supplied by Navy):- b)Standoff type : 69 no’s
00003 Weather Deck grit blasting
00004 High Pressure Fresh Water jet washing of U/W hull and top side area post completion of blasting for removal of dust particle and application of primer coat compatible with LLPS.as per NO 53/16 A) On entire under water hull including of boot top: (entire paint scheme renewal – LLPS) (a) 02 coats of A/C,dft:2x150
00004 High Pressure Fresh Water jet washing of U/W hull and top side area post completion of blasting for removal of dust particle and application of primer coat compatible with LLPS.as per NO 53/16 A) On entire under water hull including of boot top: (entire paint scheme renewal – LLPS) (b) 01 coat of tie coat , dft: 1x125 microns)
00004 High Pressure Fresh Water jet washing of U/W hull and top side area post completion of blasting for removal of dust particle and application of primer coat compatible with LLPS.as per NO 53/16 A) On entire under water hull including of boot top: (entire paint scheme renewal – LLPS) (c)03 coats of A/F paint, dft: 3x150 microns. (Paint OEM :JOTUN)
00004 High Pressure Fresh Water jet washing of U/W hull and top side area post completion of blasting for removal of dust particle and application of primer coat compatible with LLPS.as per NO 53/16 B) Top side area Complete paint scheme renewal as per HPPS for pontoon side above water paint scheme, no of coats with DFT. (i)1 coat of Primer dft. 1 X 50
00004 High Pressure Fresh Water jet washing of U/W hull and top side area post completion of blasting for removal of dust particle and application of primer coat compatible with LLPS.as per NO 53/16 B) Top side area Complete paint scheme renewal as per HPPS for pontoon side above water paint scheme, no of coats with DFT. (ii) 2 coats of A/C dft. 2 X 250
00004 High Pressure Fresh Water jet washing of U/W hull and top side area post completion of blasting for removal of dust particle and application of primer coat compatible with LLPS.as per NO 53/16 B) Top side area Complete paint scheme renewal as per HPPS for pontoon side above water paint scheme, no of coats with DFT. (iii) 1 coat of top coat dft. 1X60
00004 High Pressure Fresh Water jet washing of U/W hull and top side area post completion of blasting for removal of dust particle and application of primer coat compatible with LLPS.as per NO 53/16 C) Weather deck (complete renewal) High Pressure Fresh Water jet washing of weather deck and complete paint scheme renewal as per HPPS for weather deck water paint scheme, no of coats with DFT. (i) 1 coat of Primer dft. 1 X 50
00004 High Pressure Fresh Water jet washing of U/W hull and top side area post completion of blasting for removal of dust particle and application of primer coat compatible with LLPS.as per NO 53/16 C) Weather deck (complete renewal) High Pressure Fresh Water jet washing of weather deck and complete paint scheme renewal as per HPPS for weather deck water paint scheme, no of coats with DFT. (ii) 2 coats of A/C dft. 2 X 200
00004 High Pressure Fresh Water jet washing of U/W hull and top side area post completion of blasting for removal of dust particle and application of primer coat compatible with LLPS.as per NO 53/16 C) Weather deck (complete renewal) High Pressure Fresh Water jet washing of weather deck and complete paint scheme renewal as per HPPS for weather deck water paint scheme, no of coats with DFT. (iii) 1 coat of non skid coat dft. 1X800
00005 Draft Marks: Draft marks to be checked, cleaned & painted
00006 Renewal: Flood Alarm system of annunciation panel along with cabling (By firm - Supply and Installation) and degutting of old items. (Technical specifications/ model : SOLID STATE/INTEGRAL LOGIC,OEM :PROCON INSTRUMENTATION(P) Ltd:- CHENNAI )
00007 Fitment of Nitrile rubber fenders (Vertical:50) as per sample lab certificates to be obtained from ND(V) Lab. (Specification : Inner Dia: 125 mm,Outer Dia:230 mm)
00008 Fitment of Nitrile rubber fenders ( horizontal :115 no’s) as per sample lab certificates to be obtained from ND(V) Lab.(Specification : Inner Dia: 125 mm,Outer Dia:230 mm)
00009 Securing chain of galvanized iron with D shackles (FOR GUARD RAILS) to be renewed (rod dia 15mm)
00010 Water Ballast tank-23 no’s: (a) Grit blasting (SA 2.5) followed by FW cleaning of all tanks. (steel plate provided by yard)
00010 Water Ballast tank-23 no’s: (b) Hull repair where necessary based on Hull survey.(Approx. 40Ton)
00010 Water Ballast tank-23 no’s: (c) Complete Paint scheme renewal post hull repairs I.a.w NO 53/16. (i) 01 coat of primer (1x50)
00010 Water Ballast tank-23 no’s: (c) Complete Paint scheme renewal post hull repairs I.a.w NO 53/16. (ii) 02 coats of A/C,dft:2x150
00011 Manhole covers: (a)All MS top covers to be renewed as per sample where necessary
00011 Manhole covers: (b) All comings of 10mm thickness to be renewed based on survey where necessary.
00011 Manhole covers: (c) Opening mechainism of manhole covers to be renewed where necessary
00011 Manhole covers: (d) Neoprene gaskets to be renewed (Material - firm will provide)
00011 Manhole covers: (e) 4 in nos operating handles to be renewed as per sample.(Plates supplied by FAB Dept.) (4x46)
00012 Bollards: (a) Bollards to be chipped and painted (Set of 2)
00012 Bollards: (b) (i) Renewal of 03 no single bollards as indicated by survey team
00012 Bollards: (b) (ii) Renewal of 03 no double bollards as indicated by survey team
00013 Guard Rails: (a) Renewal of damaged Guard rails(pipe/rod) as per sample
00013 Guard Rails: (b) Chipping, de scaling & painting of guard rails.(Enamel paint)
00014 Drain plugs :All stainless steel drain plugs to be opened and renewed and fitted back and made water tight. Each set consists od 1 male and 1 female plug (a) Male Plug
00014 Drain plugs :All stainless steel drain plugs to be opened and renewed and fitted back and made water tight. Each set consists od 1 male and 1 female plug (b) Female plug
00015 Towing eye (04no’s): (a)To be surveyed, blasted and painted.
00015 Towing eye (04no’s): (b)Renewal of 02 no. towing eye as indicated by survey team
00016 Cleats (02No’s): (a) To be surveyed, blasted and painted.
00016 Cleats (02No’s): (b) Renewal of 02 no.cleats as indicated by survey team
00017 Air Pipes: (a) 46 in no. Air-pipes and sounding pipes are corroded & need to be renewed (i) 23 No Air pipes corroded tube renewal.(Material : GI ,50 mm)
00017 Air Pipes: (a) 46 in no. Air-pipes and sounding pipes are corroded & need to be renewed (ii) 23 No sounding pipes corroded tube renewal(Material : GI ,50 mm)
00017 Air Pipes: (b)Stainless steel covers for air escape pipes to be manufactured and secured with chain to air escape pipe.
00018 Ladders: All vertical ladders to be surveyed chipped and painted.
00019 Provision of valve in all air pipes to make it air tight. (Non Return Valve 2 inch )
00020 Fitment of ITP in internal tanks (Material: SS)
00021 Pressure testing of all tanks
00022 Metal built ups to be carried after survey if necessary (a) 25 X 25 mm deep pits - 100 Nos
00022 Metal built ups to be carried after survey if necessary (b) (i) Building and fairing up of 25 X 25 mm deep pits - 100 Nos
00022 Metal built ups to be carried after survey if necessary (b) (ii) Building and fairing up of 50 X 50 mm deep pits - 100 Nos
00023 Fairing of distorted locations at various places of hull as indicated by survey team - 20 locations (each location shall consider a minimum area of 1 sqm.
MAYURI ENGINEERING WORKS
WINTECH ENGINEERING WORKS
HIGH SEAS SHIPPING ASSOCIATES
M G Rajeev and Co.
ASMACS
YEOMAN MARINE SERVICES PVT. LTD.
Sadhav Offshore Engineering Company
SAGAR SHIP REPAIRERS AND MARINE SERVICES
Flash Forge Private Limited
CARE MARINE AND ALLIED SERVICES
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid