NAVAL DOCKYARD VISAKHAPATNAM
NR OF IN ASSET
2022_NAVY_546387_1
Normal Refit of IN ASSET
Open Tender
Marine Services
Turn-key
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
COY CONFERENCE HALL
28 Oct 2022
20 Aug 2022
16 Sept 2022
20 Aug 2022
15 Sept 2022
26 Aug 2022
20 Aug 2022 - 15 Sept 2022
25 Aug 2022
WORK PAKAGE FOR NR- IN ASSET HULL DEFECT LIST 001 Docking Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) Slipway/Drydock). Note 2:- Last docked in Version I on 04 Oct 2018
002 Cleaning of Under Water Hull and Boot Top Area HP jet cleaning of entire under water area and boot top area (with a pressure not exceeding 3000 PSI) remove the marine growth/barnacles and prepare for survey. Note:- (i) U/W area: 415 including boot top
003 Cleaning of Internal Compartments - FW tanks(06 Nos) Manually clean fuel tanks free of accumulated fuel and residual muck and present for survey.
004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey. (a) Cable locker
004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey. (b) Forepeak tank
004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey. (c) Cofferdam
004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey (d) bosun store, naval store and paint store
005 Cleaning of Internal Compartments Manually clean fresh water gravity tank for free of accumulated water and residual muck and present for survey.
006 Cleaning of Internal Compartments Manually clean sea water gravity tank for free of accumulated water and residual muck and present for survey.
007 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated oily water and grime/muck and present for survey:- (g) PUMP Room (Bilges: 120 Sqm, Bulkheads: 95 Sqm)
008 Cleaning of Internal Compartments - ASP Manually clean following internal compartments free of accumulated oily water and grime/muck and present for survey:- Steering gear room (Bilges: 24 Sqm, Bulkheads:76 Sqm)
009 Cleaning of above water area HP jet cleaning of entire above water area (with pressure not exceeding 3000 PSI) remove the dirt and salt contamination
010 Cleaning of super strcture HP jet cleaning of entire super strcture arae (with pressure not exceeding 3000 PSI) remove the dirt and salt contamination
011 Cleaning of weather deck HP jet cleaning of entire weather deck (with pressure not exceeding 3000 PSI) remove the dirt and salt contamination
012 Hull Survey External and Internal Structures (a) Hull survey. Carry out visual and hammer survey in accordance with NO 01/15 of under water hull , boot top area, above water hull, super structure, weather decks and all internal compartments(i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, all stiffeners and deck fittings etc.) All manholes to be inspected for water tightness, chalk impression test to be carried out. Note:- (i) LS for survey (ii)Firm to submit 07 copies of hull survey report .
013 UTG Survey Carry out UTG survey in thge presence of QC representatives of U/W hull, ship side, superstrcture, weather deck, bulkheads, Tanks, living spaces covering entire part of hull. Firm to submit 07 copies of Hull survey report.
014 Steel renewal Quote for steel renewal at various locations as per survey report Note :- Quoted repair cost shall include cost of both sides blasted and primed IS 2062 Grade `B’ quality steel. Degutting/ regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal was undertaken etc.
015 Build ups (a) Carry out build ups as indicated by the Hull survey team/ Surveyor Size 25 x 25 mm
015 Build ups (b) Carry out build ups as indicated by the Hull survey team/ Surveyor Size 50 x 50 mm
016 Fairing of deformed structure Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
017 Re-welding Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
018 Draft marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
019 Sacrificial anodes (a) Renew Sacrificial anodes those consumed more than 50% Type: MK-I Note:- Anodes will be supplied by Navy/COY.
019 Sacrificial anodes (b) Renew Sacrificial anodes those consumed more than 50% Type: MK-VI Note:- Anodes will be supplied by Navy/COY.
020 Surface Preparation Under Water area Surface preparation to SA 2.5 std using grit blasting on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
021 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - Penguard primer -50 microns
021 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
021 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
021 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
021 Painting Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns
021 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns
021 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns
021 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (h) 8th Coat: A/F: Seaquantum Ultra (Black) - 150 microns DFT
022 Surface prepartion Above Water Area and Bulwark including guardrails Carry out surface prepartion to SA2.5 using grit blasting standard for paint application as per survey report by Paint OEM rep
023 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (a) 1st Coat: Penguard primer - 50 microns DFT
023 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Jotamastic 80 (Grey/ Red Brown) - 125 microns DFT
023 Painting - Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Jotamastic 80 (Grey/ Red Brown) - 125 microns DFT
023 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
024 Surface prepartion Super Structure and Deck Fittings Carry out surface prepartion to ST3 standard for paint application as per survey report by Paint OEM rep .
025 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT
025 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Jotamastic 80( Red ) - 125 microns DFT
025 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c)3rd Coat: Jotamastic 80(Grey) - 125 microns DFT
025 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: Hard Top XP GREY 7040- 60 microns DFT
026 Surface prepartion Weather Decks Carry out hydro-jet blasting of entire weather deck, bridge deck and flag deck to WJ 2 standards.
027 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT
027 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 - 150 microns DFT
027 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota armour -800 microns DFT
028 Surface prepartion Internal Compartments - Fore Peak Tank, Cable locker,bosun store ,naval store , paint store and Cofferdam Carry out mechanical cleaning to ST 3 standard as per survey report of Paint OEM for fore peak tank , cable locker and cofferdam (04).
029 Painting Fore Peak Tank, Cable locker,bosun store ,naval store , paint store and Cofferdam - JOTUN Scheme. Paint fore peak tanks,ballast tanks and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a)1st Coat: primer - Penguard primer -50 microns DFT
029 Painting Fore Peak Tank, Cable locker,bosun store ,naval store , paint store and Cofferdam - JOTUN Scheme. Paint fore peak tanks,ballast tanks and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Anticorrosive - Balloxy HB light (Bieze) - 150 microns
029 Painting Fore peak tanks, ballast tanks and cable locker - JOTUN Scheme. Paint fore peak tanks,ballast tanks and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Anticorrosive - Balloxy HB light (Grey) - 150 microns
030 Surface prepartion Internal Compartments - bilges of Pump Room and ASP Compartment including bulkheds Carry out mechanical cleaning to ST 3 standard as survey report of Paint OEM for paint application. (i) Pump room & ASP ( Bilges-315 sqm,)
031 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT
031 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive - Jotacote Universal (Aluminium) - 150 microns
031 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 microns
031 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Penguard Top Coat - 50 microns.
032 Painting Bulkheads of Pump room and ASP - Jotun Scheme. Paint bulkheads and deckheads of PUMP room and ASP compartments with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT
032 Painting Bulkheads of Pump room and ASP - Jotun Scheme. Paint bulkheads and deckheads of PUMP room and ASP compartments with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Interior fire retardent paint-100 microns
032 Painting Bulkheads of Pump room and ASP - Jotun Scheme. Paint bulkheads and deckheads of PUMP room and ASP compartments with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Interior fire retardent paint-100 micron
033 Cleaing of RU Tanks Cleaning of Fuel Oil RU TanksManually scrap and clean to bare metal and apply two coats of OM 750 oil in following tanks: Fuel Oil RU Tanks (02nos) Note:- Quoted cost shall be inclusive of cost of oil also.
034 Surafce prepartion Bulkheads, decks and dadoes of Internal compartments Carry out mechanical cleaning of (Deck store, rec room ,prov store and crew room stores,battery stores, CO2 room, paint stores,pump store,deck store and eletrical control room) to ST 3 standard as survey report of Paint OEM for paint application.
035 Painting Internal compartments decks and dadoes- Jotun Scheme. Carry out painting of internal compartments decks and dadoes at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (a) 1st Coat: primer - penguard 1x50 microns
035 Painting Internal compartments decks and dadoes- Jotun Scheme. Carry out painting of internal compartments decks and dadoes at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (b) 2nd coat : Jotamastic 80 grey -1 x 150 microns
035 Painting Internal compartments decks and dadoes- Jotun Scheme. Carry out painting of internal compartments decks and dadoes at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (c) 3rd coat ; Burnswick green finishing paint-100 microns
036 Painting Internal compartments bulkheads - Jotun Scheme. Carry out painting of internal compartments Bulkheads and deck heads area at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (a) 1st Coat: primer - penguard 1x50 microns
036 Painting Internal compartments bulkheads - Jotun Scheme. Carry out painting of internal compartments Bulkheads and deck heads area at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b)1st Coat: Interior fire retardent paint-100 microns
036 Painting Internal compartments bulkheads - Jotun Scheme. Carry out painting of internal compartments Bulkheads and deck heads area at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 2nd Coat: Interior fire retardent paint-100 microns
037 Surface preaprtion FW Tanks Carry out surface preaprtion to ST 3 standards of fw tanks as survey report of Paint OEM for paint application.
038 Painting FW Tanks - Jotun paint scheme Paint all sullage tanks with following paint scheme:- (a) Penguard HB - 100 microns
038 Painting FW Tanks - Jotun paint scheme Paint all sullage tanks with following paint scheme:- (b) Penguard HB - 100 microns
038 Painting FW Tanks - Jotun paint scheme Paint all sullage tanks with following paint scheme:- (c) Penguard HB - 100 microns
039 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors, chain cables and accessories, laying out for cleaning, painting and refitment. (a) Anchors - 03
039 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (b) Chain cable(Dia 17.5mm) (i) Full Shackles- 08 (ii) Half Shackles- 04
039 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (c) Swivel piece
039 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (d) Lug less joining shackles
039 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (e) D - Shackles
039 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (f) Chain Stopper/compressor
040 Anchor windlass Completely strip & overhaul anchor windlass, renew brake linings, refit and prove for satisfactory operation. Quoted price to include cost of liners and spares also.
041 Bollards (b) Bollards and foundatiosn corroded and thinned. To be repaired/ renewed as per hull survey report. Doubler plate Area-420MMx420MM, Dia of pipe-219.1MM, Height-1460MM,Foundation Area-400MMx400MMx90MM, Thickness of plate-10MM Towing gear Securing Rod Dia-50MM.
042 Guardrails (a)Fixed verticals guardrail stanchions on weather deck deformed/bent from deck. To be renewed. (Mat-MS angle bar)
042 Guardrails (b) Fixed Horizontal guardrails on weather deck deformed/bent To be renewed. (Mat-MS)
043 Metallilc chain guardrails Metallic chain guardrails of stanchions corroded to chipped and cleaned. Renewal cost should include cost of material also.
044 Sanitry sysytem Soil pipes to be removed, chemically cleaned, pressure tested and fitted back in situ. Mat: MS , Dia: 04inch. (Pressure: 3Kg/Cm2)
045 Ventilation (a) Mushroom type natural exhaust ventilator to be removed, cleaned/ overhauled and fitted back. Ventilator mesh to be renew. Prove for satisfactory operation. Details- Mush room head dia-500 mm, Height-1550 mm
045 Ventilation (b) Mushroom type forced supply ventilator to be removed, cleaned/ overhauled and fitted back. Ventilator mesh to be renew. Prove for satisfactory operation. Details- Mush room head dia-370 mm, Height-1550 mm,
046 Drainage system Drain pipe leading from mast deck to 01 deck and No. 1 deck to engine room corroded, thinned and holed, to be renewed. Mat: GI, 03 inch dia.
047 Sanitry system Sanitry fittingss in crew bathrooms and WC. (a) SS Wash basin to be renewed. Note:- Quoted cost shall include cost all items/spares. (a) Wash basin
047 Sanitry system Sanitry fittingss in crew bathrooms and WC. Sanitry fittings in crew bathrooms and wc to be renewed. (b) Provision SS tap: 1/2 inch
047 Sanitry system Sanitry fittingss in crew bathrooms and WC. (c) SS SUPPLY pipeline broken/damaged to be renewed. Mat : Cu-Ni, dia: ½ inch
047 Sanitry system Sanitry fittingss in crew bathrooms and WC. (d) Drain pipeline broken/damaged to be renewed. Mat-MS, dia- 2 inch
047 Sanitry system Sanitry fittingss in crew bathrooms and WC. (e) WC (Mat Ceramic) and Flush valves to be renewed. Mat - Brass, Dia - 2"
048 Fresh water system Crew bathrooms and WC. .Note:- Quoted cost shall include cost all items/spares. (a) SS stop cock 1’’ to be renewed
048 Fresh water system Crew bathrooms and WC. (b) Shower head to be fitted in bathrooms Note:- Quoted repair cost shall include cost all items/spares.
049 Tyre fenders Tyre fender damaged on P&S side , to be renwed with used Automobile tyre fenders moulded with 8 mm white natural rubber. Mat- Rubber, colour-white . No painting or coating of any other form will be permitted. Vendors to adhere to SoW (a) OD 750mm; ID 450 mm , width - 250 mm
049 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side. (b) Chain Securing brackets/deck eyes.
049 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side (c) provission of Securing chain. 16 MM DIA for tyre fenders
049 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side (d) Bush for passing chain on tyres.
049 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side (e)Provision of D SHACKLES for tyre fenders
050 D shape Fenders (a) 'D' shaped rubber fenders damaged/perished to be renewed. Color - GREY/WHITE Length - 1000 mm length Location - 35 on shipside and 05 on transom Material - EPDM rubber as per NES170
050 D shape Fenders Securing brackets (b) Fender securing flat bar brackets to be repaired/renewed as necessasry.(Mat- MS). Size : 1100MM x 110MM x 08MM
050 D shape Fenders Securing brackets (c) Fender securing 'C' clamp brackets to be repaired/renewed as necessasry.(Mat- MS). Size : 200MM x 110MM x 08MM
051 Sky light SS butterfly nuts and tumbler bolt of engine room sky light &exhaust flaps broken. To be renewed. Dia of bolt : 10 mm & 6 inch length (Mat-MS).
054 Rubber beading Rubber beading of following doors,hatch and skylight perished/cracked to be renewed and chalk test to be proved. (EPDM Rubber with shore hardness 50 + 5o A) (a) WT door
051 Rubber beading Rubber beading of following doors,hatch and skylight perished/cracked to be renewed and chalk test to be proved. (EPDM Rubber with shore hardness 50 + 5o A) (b) WT Hatch
052 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (a) Forepeak Tanks
052 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (b) FW TANKS
052 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (c) Void space and cofferdam
052 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (d) cable locker
053 Bilge paltform (a) Renew bilge platform plate. Material- aluminium chequerd plate, thickness- 05 mm
053 Bilge platform (b) Supporting brackets to be renewed where ever required(Mat - Ms). Securing nut&bolts to be of Mat-SS.
054 Cleats MS cleats perished/thinned to be renewed (Size-28 mm). Quote shall includes nuts bolts and associated accessories
055 Ventilation System (a) Breather pipes of various tanks on upper deck corroded and thinned including wire mesh, to be repaired/renewed. (Mat. GI pipe) Pipe dia 2 1/2 inch
055 Ventilation System (b) Deck distance piece and flanges corroded to be renewed including rubber joints. Dia 150mm
055 Ventilation System (c) Ventilation trunking wire mesh to be renewed at damaged areas. Size: 400mmX600mm
056 Deck underlay Dry compatments Deck underlay (Macrotech) to be repaired/ renewed at uprooted/ damaged/ steel renewed, accommodation areas, Wheel house and Alleways. (a) Surface preparation and application of EROP. And Mass 98.
056 Deck underlay Dry compatments Deck underlay (Macrotech) to be repaired/ renewed at uprooted/ damaged/ steel renewed, accommodation areas, Wheel house and Alleways.. (b) Surface preparation to be carried out by buffing on Mass 98 and application of Mass 96.
056 Deck underlay Dry compatments Deck underlay (Macrotech) to be repaired/ renewed at uprooted/ damaged/ steel renewed, accommodation areas, Wheel house and Alleways.. (c) Surface preparation and application of sealer coat on entire area
057 Deck underlay wet compartments Deck underlay (Macrotech) to be repaired/ renewed in bathrooms at uprooted/ damaged/ steel renewed. (a) Surface preparation and application of EROP. And Mass 98.
057 Deck underlay wet compartments Deck underlay (Macrotech) to be repaired/ renewed in bathrooms at uprooted/ damaged/ steel renewed. (b) Surface preparation to be carried out by buffing on Mass 98 and application of Mass 96.
057 Deck underlay wet compartments Deck underlay (Macrotech) to be repaired/ renewed in bathrooms at uprooted/ damaged/ steel renewed. (c) Surface preparation and application of sealer coat on entire area
058 Deck underlay dadoe area Deck underlay (Macrotech) to be repaired/ renewed in bathrooms. (a) Surface preparation and application of EROP. And Mass 98.
058 Deck underlay dadoe area Deck underlay (Macrotech) to be repaired/ renewed in bathrooms. (b) Surface preparation to be carried out by buffing on Mass 98 and application of Mass 96.
058 Deck underlay dadoe area Deck underlay (Macrotech) to be repaired/ renewed in bathrooms. (c) Surface preparation and application of sealer coat on entire area
059 WT Hatches WT hatch clips to be removed, cleaned, greased and refitted WT Hatch (0.6M x 0.6M)
059 WT Doors WT door clips to be removed, cleaned, greased and refitted WT Doors
060 NWT NWT Wooden door of wheel house perished, to be repaired/renewed including cylindrical door lock.
061 Manhole Rubber Joints perished, to be renewed (a) Joints
061 Manhole (b) Studs of manholes perished, to be renewed (Only defective studs to be renewed as per survey report )MS Studs with nut, size 20 mm
061 Manhole (c) Manhole covers corroded/ thinned. To be renewed. Mat - IS 2062 Grade 'B' steel. Size - 2' X 1.5'
062 Locking arrangment (a) Mortise locks in accomodation areas defective to be renewed.
062 Locking arrangment (b) MS Hasp staple/ locking arrangemet on MS Door and hatches corroded/ broken/ damaged to be renewed as per sample fitted.
063 Name Board Following name board perished/damaged, to be renewed/repaired. (a) repair/renewal of vessel name board including electroplating to be carried out on ship side -02
063 Name Board Following name board perished/damaged, to be renew. (b) Vessel illuminated board with Perspex sheet - 01
063 Name Board Following name board perished/damaged, to be renew. (c) Painting of vessel name on bulwark/Ship side in both Hindi and English with fluorescent paint -02
064 Furniture (a) CRCA kit lockers perished , to be renewed (90x80x45 cm )
064 Furniture (b) CRCA standing lockers perished, to be renewed (183x40x45 cm)
064 Furniture (c) Wooden table damaged/pershed to be renewed
064 Furniture (d) Wooed paneling in crew rest room and wheel house damged/perished, to be renewed
065 Gantry wire rope Overhauling of Gantry on weather deck to be carried out. Steel wire rope to be load tested with SWL of 01 Ton.
066 Awning Repair of damaged awning shade frame Wether deck at 02 locations of Gi pipes and fitment of the same on fwdand aft a) Size: 2m x 5.5 m Approx. Mat: GI pipe
067 PVC Awning PVC Awning at Foxle and at aft side Renewel of PVC awning over the frame using securing rope. Mat - As per sample.
Engineering Work Package 1001, D.G SET ENGINE, MAKE:-KIRLOSKER OIL ENGINE LTD, MODEL:HA294-19bhp@1500RPM Air Cooled 12V Start cum Hand start. - Total Running hours- 75 hrs, (1000 hrly routine carried out on the DA during SR-17) . Following to be carried out:- (Firm Not To Quote)
1001, D.G SET ENGINE, MAKE:-KIRLOSKER OIL ENGINE LTD, MODEL:HA294-19bhp@1500RPM Air Cooled 12V Start cum Hand start. (a) Engine lub oil to be changed (Oil to be supply by firm).Oil Servo 15 W 40
1001, D.G SET ENGINE, MAKE:-KIRLOSKER OIL ENGINE LTD, MODEL:HA294-19bhp@1500RPM Air Cooled 12V Start cum Hand start. (b) Fuel filter, insert-micro filter element/cartridge to be changed.Firm to quote for spares/ material required.
1001, D.G SET ENGINE, MAKE:-KIRLOSKER OIL ENGINE LTD, MODEL:HA294-19bhp@1500RPM Air Cooled 12V Start cum Hand start. (c) Lub oil filter element/cartridge to be changed.Firm to quote for spares/ material required.
1001, D.G SET ENGINE, MAKE:-KIRLOSKER OIL ENGINE LTD, MODEL:HA294-19bhp@1500RPM Air Cooled 12V Start cum Hand start. (d) Injectors to be renewed.Firm to quote for spares/ material required.
1001, D.G SET ENGINE, MAKE:-KIRLOSKER OIL ENGINE LTD, MODEL:HA294-19bhp@1500RPM Air Cooled 12V Start cum Hand start. (e) Change intake air filtering unit
1001, D.G SET ENGINE, MAKE:-KIRLOSKER OIL ENGINE LTD, MODEL:HA294-19bhp@1500RPM Air Cooled 12V Start cum Hand start. (f) Flexible hoses fitted for "lub oil and fuel oil system" to be renewed
1001, D.G SET ENGINE, MAKE:-KIRLOSKER OIL ENGINE LTD, MODEL:HA294-19bhp@1500RPM Air Cooled 12V Start cum Hand start. (g) Carry out adjustment of overhead set.(tappet setting of injectors & valves).
1001, D.G SET ENGINE, MAKE:-KIRLOSKER OIL ENGINE LTD, MODEL:HA294-19bhp@1500RPM Air Cooled 12V Start cum Hand start. (h) Remove & chemical Clean lub oil cooler & fresh water cooler. Carry out pressure testing of Lub oil cooler and fresh water cooler.Renew all gasket & 'o' rings.
1001, D.G SET ENGINE, MAKE:-KIRLOSKER OIL ENGINE LTD, MODEL:HA294-19bhp@1500RPM Air Cooled 12V Start cum Hand start. (j) performance trials of the engine to be carried out.
1002, FRESH WATER CARGO PUMP, MAKE-BE PUMPS MODEL-MA 1023KK-DGS2-316-MS3, (a) Cargo Fresh water Pumps not developing sufficient pressure, Pumps to be Overhauled. (Overhaul to includes change of seals, gaskets, bearings, impeller , joints and other consumables )
1002, FRESH WATER CARGO PUMP, MAKE-BE PUMPS MODEL-MA 1023KK-DGS2-316-MS3, (b) Suction and Discharge pressure gauges along with end fittings and gauge lines to be renewed. (Range 0 -10 Kg/cm2, Cuni lines 10 RMT )
1002, FRESH WATER CARGO PUMP, MAKE-BE PUMPS MODEL-MA 1023KK-DGS2-316-MS3, (c) Pumps to be proved for satisfactory operation.
1003, PRIME MOVER FOR CARGO FRESH WATER PUMP, MAKE-KIRLOSKAR OIL ENGINES,MODEL-HA294, SR NO-E1-03.1021.10/1300044, 1300045, 1300046, RPM-1800, QTY-03, BHP-19 BHP@1500RPM. (a) Engine lub oil to be changed. Oil to be supply by firm).Oil Servo 15 W 40
1003, PRIME MOVER FOR CARGO FRESH WATER PUMP, MAKE-KIRLOSKAR OIL ENGINES,MODEL-HA294, SR NO-E1-03.1021.10/1300044, 1300045, 1300046, RPM-1800, QTY-03, BHP-19 BHP@1500RPM. (b) Fuel filter, insert-micro filter element/cartridge to be changed. Firm to quote for spares/ material required.
1003, PRIME MOVER FOR CARGO FRESH WATER PUMP, MAKE-KIRLOSKAR OIL ENGINES,MODEL-HA294, SR NO-E1-03.1021.10/1300044, 1300045, 1300046, RPM-1800, QTY-03, BHP-19 BHP@1500RPM. (c) Lub oil filter element/cartridge to be changed. Firm to quote for spares/ material required.
1003, PRIME MOVER FOR CARGO FRESH WATER PUMP, MAKE-KIRLOSKAR OIL ENGINES,MODEL-HA294, SR NO-E1-03.1021.10/1300044, 1300045, 1300046, RPM-1800, QTY-03, BHP-19 BHP@1500RPM. (d) Injectors to be renewed.Firm to quote for spares/ material required.
1003, PRIME MOVER FOR CARGO FRESH WATER PUMP, MAKE-KIRLOSKAR OIL ENGINES,MODEL-HA294, SR NO-E1-03.1021.10/1300044, 1300045, 1300046, RPM-1800, QTY-03, BHP-19 BHP@1500RPM. (e) Carry out adjustment of overhead set.(tappet setting of injectors & valves).
1003, PRIME MOVER FOR CARGO FRESH WATER PUMP, MAKE-KIRLOSKAR OIL ENGINES,MODEL-HA294, SR NO-E1-03.1021.10/1300044, 1300045, 1300046, RPM-1800, QTY-03, BHP-19 BHP@1500RPM. (f) Change intake air filtering unit
1003, PRIME MOVER FOR CARGO FRESH WATER PUMP, MAKE-KIRLOSKAR OIL ENGINES,MODEL-HA294, SR NO-E1-03.1021.10/1300044, 1300045, 1300046, RPM-1800, QTY-03, BHP-19 BHP@1500RPM. (g) performance trials of the engine to be carried out.
1004, Following system pipes to be removed , chemically cleaned , pressure tested and fitted back (a) Fresh water,system Size 50 mm, Mat MS
1004, Following system pipes to be removed , chemically cleaned , pressure tested and fitted back (b) Fuel water,system Size 20 mm, Mat MS
1004, Following system pipes to be removed , chemically cleaned , pressure tested and fitted back (c) Auxialiary system pipes Size 50 mm, Mat MS
1004, Following system pipes to be removed , chemically cleaned , pressure tested and fitted back (d) Exhaust system pipes Size 25 mm Mat MS
1005, Following system pipes to be renewed. (a) Fresh water,system Size 50 mm, Mat MS
1005, Following system pipes to be renewed. (b) Fuel water,system Size 20 mm, Mat MS
1005, Following system pipes to be renewed. (c) Auxialiary system pipes Size 50 mm, Mat MS
1005, Following system pipes to be renewed. d) Exhaust system pipes Size 25 mm Mat MS
1006, MISCELLENIOUS (a) Fresh water system valves to be overhauled, including renewal of wear down parts (spindle disc). Type-screw down, Dia 80 mm
1006, MISCELLENIOUS (b) Fresh water system Valve Wheel and Cocks corroded. To be manufactured as per Sample Mat- MS
1006, MISCELLENIOUS (c)Fire system hydrants internal thread perished. To be manufactured as per sample. Mat-brass.
1006, MISCELLENIOUS (d) Hand pumps not taking suction. To be overhauled and proved for operation
1006, MISCELLENIOUS (e) Fuel filling point adaptors to be manufactured as per sample, Material- Brass
1006, MISCELLENIOUS (f) Hot Lagging to be renewed for exhaust lines of DG & all pumps.
1007, DD fresh water pump starting panel 12 V DC Overhaul and routine to be carried out and proved for satisfectory performance
1008 Rudder & Steering System (a) Wire & pulley arrangement from Wheel house to Rudder stock to Check for proper operation. Pulley and wire to greased and eased up.
1008 Rudder & Steering System (b) Rudder & Rudder stock jammed, to be eased and made operational
1008 Rudder & Steering System (c.) Fabricate geared wheel provided (as sample) for rudder movement from wheel house
ELECTRICLA WORK PACKAGE 2001, Main Switch board 415V, 3ph, 50 Hz (a) Overhauling of switchboard to be carried out including renewal of defective control wiring, defective fuse link and fuse carrier, terminal blocks, crimping of perished lugs of control wiring, perished number sleeves to be replaced, defective indication lamps to be changed.
2001, Main Switch board 415V, 3ph, 50 Hz (b)Following meters to be renewed.( Firm Not To Quote)
2001, Main Switch board 415V, 3ph, 50 Hz (b)Following meters to be renewed (i) Voltmeter 0-500V
2001, Main Switch board 415V, 3ph, 50 Hz (b)Following meters to be renewed (ii) Ammeter 0-100A
2001, Main Switch board 415V, 3ph, 50 Hz (b)Following meters to be renewed (iii) Frequency Meter 45-50-55 Hz
2001, Main Switch board 415V, 3ph, 50 Hz (c)Following MCCB to be renewed.( Firm Not To Quote)
2001, Main Switch board 415V, 3ph, 50 Hz (c)Following MCCB to be renewed (i) Hand Operated MCCB Rating : 415v, 3Phase, 50 Hz, Make : Schneider, Model : EZC-100N-40A
2001, Main Switch board 415V, 3ph, 50 Hz (c)Following MCCB to be renewed (ii) Hand Operated MCCB Rating : 415v, 3Phase, 50 Hz, Make : Schneider, Model : EZC-100N-80A
2001, Main Switch board 415V, 3ph, 50 Hz (d) Mechanical cleaning of main switchboard panel board to be carried & painted with one coat of primer and one coat of enamle paint (white color paint from inside and gray color paint from outside).
2002, Eqpt/System: Generators/Alternator Make:Kirlosker,415V,3Ph, 20KVA,50Hz,1500RPM Carryout routines mentioned below and prove them for satisfactory performance.(routine may be carried out with assistance of OEM or authorised Rep). ( Firm Not To Quote)
2002, Eqpt/System: Generators/Alternator Make:Kirlosker,415V,3Ph, 20KVA,50Hz,1500RPM Carryout routines mentioned below and prove them for satisfactory performance.(routine may be carried out with assistance of OEM or authorised Rep). (a) Overhaul the generators/alternator
2002, Eqpt/System: Generators/Alternator Make:Kirlosker,415V,3Ph, 20KVA,50Hz,1500RPM Carryout routines mentioned below and prove them for satisfactory performance.(routine may be carried out with assistance of OEM or authorised Rep). (b) Renew the IEVR-2 (Aumatic Voltage Regulator)
2002, Eqpt/System: Generators/Alternator Make:Kirlosker,415V,3Ph, 20KVA,50Hz,1500RPM Carryout routines mentioned below and prove them for satisfactory performance.(routine may be carried out with assistance of OEM or authorised Rep). (c) Overhauling of self starter motor for DA 12V DC, Make : Lucas TVS
2002, Eqpt/System: Generators/Alternator Make:Kirlosker,415V,3Ph, 20KVA,50Hz,1500RPM Carryout routines mentioned below and prove them for satisfactory performance.(routine may be carried out with assistance of OEM or authorised Rep). (d) Renewal of self starter motor for DA 12V DC, Make : Lucas TVS
2002, Eqpt/System: Generators/Alternator Make:Kirlosker,415V,3Ph, 20KVA,50Hz,1500RPM Carryout routines mentioned below and prove them for satisfactory performance.(routine may be carried out with assistance of OEM or authorised Rep). (e) Repair and overhauling of Dynamo assambly 12V DC, Make : Lucas TVS
2003, Diesel alternator Control Panel 24V DC (a) D/G (port & stbd) AV Alaram panel System including control wiring to be completely over hauled,calibrated and proved for satisfactory operation.Machinery body to be Cleaned to bare metal and painted with one coat of primer and one coat of enamle paint (white color paint from inside and gray color paint from outside).
2004, Diesel Driven Fresh Water pump 28 KW, Make : Kirloskar (a) Overhauling of self starter motor for DD Pump 12V DC, Make : Lucas TVS
2004, Diesel Driven Fresh Water pump 28 KW, Make : Kirloskar (b) Renewal of self starter motor for DD pump 12V DC, Make Lucas TVS
2004, Diesel Driven Fresh Water pump 28 KW, Make : Kirloskar (c) Repair and overhauling of Dynamo assambly 12V DC, Make : Lucas TVS
2004, Diesel Driven Fresh Water pump 28 KW, Make : Kirloskar (d) Renewal of Dynamo assambly for DD pump 12V DC, Make Lucas TVS
2005, Shore Supply Connection Box 415V,3ph,50Hz AC Make : Wave electronics, Kochi (Firm Not To Quote) Following routines to be carried out
2005, Shore Supply Connection Box 415V,3ph,50Hz AC Make : Wave electronics, Kochi Following routines to be carried out (a) Renew the indication lamps with holders 415V
2005, Shore Supply Connection Box 415V,3ph,50Hz AC Make : Wave electronics, Kochi Following routines to be carried out (b) Mechanical cleaning of shore supply connection box to be carried out & box to be painted with one coat of primer and one coat of enamal paint (white color paint from inside and gray color paint from outside).
2005, Shore Supply Connection Box 415V,3ph,50Hz AC Make : Wave electronics, Kochi Following routines to be carried out (c) Following meters to be renwed :- (i) Voltmeter 0-500V
2005, Shore Supply Connection Box 415V,3ph,50Hz AC Make : Wave electronics, Kochi Following routines to be carried out (c) Following meters to be renwed :- (ii) Phase sequence meter 3 phase 415V
2006, Overhauling of following motors (a) Pump room supply fan blower motor(415V,3Ph,50Hz, 0.5HP)
2007, Light Fitting (a) Renew Watertight U Glass light fitting incandeescent lamp fittings. 230V,60W(Make- Ajmera, Model 2541)
2007, Light Fitting (b) Repair Watertight U Glass light fitting incandeescent lamp fittings. 230V,60W(Make- Ajmera, Model 2541)
2007, Light Fitting (c) Repair of Name Plate illumination light fitting (220V, 20W tube )
2008, Eqpt/System: Lead Acid Batteries. Make:Exide,200AH,12V Self Maintenace free Battery (a) Renew the batteries.
2008, Eqpt/System: Lead Acid Batteries. Make:Exide,200AH,12V Self Maintenace free Battery (b) Renew the Battery connectors (Material Brass)
2008, Eqpt/System: Lead Acid Batteries. Make:Exide,200AH,12V Self Maintenace free Battery (c) Renew the Short link cable (50sq.mm multi strand copper cables,Length 0.5mtr each ) with connectors (material -copper)
2009, Make:Exide,140AH,12V Self Maintenace free Battery (a) Renew the batteries
2009, Make:Exide,140AH,12V Self Maintenace free Battery (b) Renew the Battery connecting lugs
2010, Eqpt/System: Wall mounted Electrical fans (Oscillating) Make:C&G, Type- 400 mm Sweep (a) Wall mounted fan repair to carry out. Prove for satisfactory operation
2010, Eqpt/System: Wall mounted Electrical fans (Oscillating) Make:C&G, Type- 400 mm Sweep (b) Wall mounted fan to renew
2011, Tank content guage system input supply 220V Make : Nivo control Pvt Ltd, Indore (a) Overhauling and calibration of tank content guage system and prove them onboard for satisfactory performance
2011, Tank content guage system input supply 220V Make : Nivo control Pvt Ltd, Indore (b) Calibraton of all level sensors. Renew the all sensors cable
2012, 10KVA Invertor, Make: M/s SUKAM 10KVA, Input 230V AC and 180 V DC, output 230V AC, 1 Phase, 50 Hz (a) Overhauling of invertor to be carried out, Defective component to be repair/renewed. Invertor to be operationalized and load trail undertaken. Invertor to be proved for satisfactory performance
2013, Eqpt/System: Window Wiper Systems (24V DC) (a) Overhaul the gear system. Motor to be overhauled. Clean and lubricate windshield wiper arms. Check the pivot points and cleaning of same to be carried out.Rubber blades including rubber coaming to be renewed. Prove window wiper system for satisfactory performance.
2013, Eqpt/System: Window Wiper Systems (24V DC) (b) Renew the Blades Including Rubber coaming
2013, Eqpt/System: Window Wiper Systems (24V DC) 2013, Eqpt/System: Window Wiper Systems (24V DC) (c) Overhauling of Window wiper ccontrol system to be carried out. Prove the satisfactory operation of the window wiper system from control panel. Defective components to be renewed.
2014, Provide the suitable ship electrical horn for 30mtrs to 75 mtrs length vessels sound >130db,weather proof,& rust proof material (24V DC stainless single Trumpet Type)
2015, PORTABLE BLOWERS 220V, 1 Ph , 50 Hz, 2HP (a) Renewal of centrifugal portable blowers
2016, Extension Board Rating : 220V 1Ph Manufacturing of extension board with 02 in no 15A SW/SKT combinaion and 02 in no 5A SW/SKT combination and 15 mtr 3core 2 sqmm cable along with Plug top 3 Pin 15A
2017, Battery Charger 1.5kW, Input 220V 1Ph,50Hz, output 24V &12V DC (a) Provision & & install the Battery charger in pump room and prove for charging of engine starting batteries
2017, Battery Charger 1.5kW, Input 220V 1Ph,50Hz, output 24V &12V DC (b) Provision & install the change over MCCB TP 100A (2way with OFF) in the circuit of battery to self starter of dd engine & battery to battery charger.
2017, Battery Charger 1.5kW, Input 220V 1Ph,50Hz, output 24V &12V DC ( c ) Provision the cable (2X10sq.mm copper multiple strand insulated cable) & laying of cables from battery charger to batteries via chnge over switch
2018, Battery Charger 1.5kW, Input 220V 1Ph,50Hz, output 24V &12V DC ( d ) provide the cable (1X150sq.mm copper multiple strand insulated cable) & laying of cables from batteries to self starters via chnge over switch (the job is including material of cable lugs & battery connecting lugs)
DRY DOCK AND ALLIED SERVICES WORK PACKAGE SERVICES (A) Docking and undocking charges (Both Versions) e. Docking and Undocking will be done by Navy in Navy Permises i.e ND(v) /slipway Dock blocks preparation & laying out as per docking plan . Job will be done by Navy Firm not to quote
(B) .Provision of stationory / office items for ND(V) / Refit monitoring team for entire refit duration period. Cater budget of Rs 4000/- per month. Requirement will be intimated RMT/ NDV on as requirement basis. Payment at actuals. Note:- firms to quote.
Dock hire charges for an estimated duration of 60 Days as per OCR Dry Dock facility will will provided by Navy in Navy Permises i.e ND(v) /slipway. Firm not to quote.
Wet basin/alongside hire charges for the remaining duration each (i.e. total refit duration of 150 days – 60 days docking period) . Dry Dock facility will will provided by Navy in Navy Permises Firm not to quote
Provision of sufficient lighting for duty staff Firm to quote.
(a) Quote for maintenance of two in no. fire lines for the refit duration . Firm to quote.
(b) Two each connection/ disconnection charges for for the refit duration Firm to quote.
Provision of two transports (cars) for entire refit duration (one for refit Co-ordinating staff and one for ND(V) monitoring Team) for 10 hrs or 100KM/day whichever is less Firm to quote.
Towing charges To & Fro . Facility will be provided by Navy. Firm not to quote
QC inspection for the entire scope of work by third party IRS/LRS/ABS/QC/TPI for the refit duration as per the QIS. Firms not to quoted for this serial since QC will be by ND(V)/MQC Dept.
ASMACS
Sadhav Offshore Engineering Company
avisan engineering enterprises
CARE MARINE AND ALLIED SERVICES
ASHA ENGINEERING WORKS
SAGAR SHIP REPAIRERS AND MARINE SERVICES
Patel Engineering Works Vizag
WINTECH ENGINEERING WORKS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .