Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance NO 5 1ST FLOOR CITY PLAZA DABA GARDEN DABA GARDEN VISAKHAPATNAM ANDHRA PRADESH 530020 | VISAKHAPATANAM | ANDHRA PRADESH | 530020 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
5 Aug 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM
ERDD OF IN ASSET
2021_NAVY_460322_1
COM/0991/IN ASSET/ERDD O/L-21/A
Open Tender
Marine Services
Turn-key
90 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
COY CONFERENCE ROOM
13 Sept 2021
16 Jul 2021
6 Aug 2021
16 Jul 2021
5 Aug 2021
23 Jul 2021
16 Jul 2021 - 5 Aug 2021
22 Jul 2021
240 days
SOW- IN ASSET - 1 (05x02x01 mtrs) 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) slipway).
002 Hull Cleaning Under Water and Boot Top Area HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/ barnacles andpresent for survey (approx weight of pontoon - 10 Tons). (a) U/W area: 15 Sqm (b) Boot Top area: 5 Sqm
002 Hull Cleaning Above Water Area (a) Clean the entire above water area with HP Jet washing (with a pressure not exceeding 3000 PSI) to remove salts and contaminants from the surface I.A.W. No 01/15 and present for survey
002 Hull Cleaning Weather deck (b) Clean the entire weather deck including fittings area with HP Jet washing (not exceeding 3000 PSI) to remove salts and contaminants from the surface. I.A.W. No 01/15 and present for survey
002 Hull Cleaning Tanks (c) Manually clean internal tanks i.a.w. No 01/15 and present for survey. The tanks should be washed out with fresh water and soap water to remoeve any sediment or dirt present in the tank
003 Hull survey External and Internal Hull survey. Hull survey. Carry out visual and hammer survey/UTG survey in accordance with NO 19/06 of under water hull, boot top, above water hull, weather decks and all internal tanks etc, all stiffeners and deck fittings including lifting hooks/eyes. All manholes to be inspected and repaired to ensure water tightness, chalk impression test to be carried out. Approx area: 100 Sqm
004 UTG Survey . Quote for UTG survey points at U/W hull,above water, weather deck and covering entire part of hull.
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, renewal of all obstructions in way of steel renewals including minor fittings with their foundations, etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc.
006 Build ups (a) Carry out build ups as indicated by the Hull survey team/ Surveyor Approx size 25x25 mm-100
006 Build ups (b) Carry out build ups as indicated by the Hull survey team/ Surveyor Approx size 50x50 mm-100
006 Build ups (c) Carry out build ups as indicated by the Hull survey team/ Surveyor Approx size 100x100 mm-100
007 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
008 Sacrificial Anodes Renew Sacrificial anodes (MK II) those consumed more than 50% Note:- Anodes Navy/COY supply.
009 Surface preparation with Grit Blasting Under Water area including Boot top area Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
009 Surface preparation with Grit Blasting Under Water area including Boot top area Sweep blasting to SA 1 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red)
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red/black)
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum specturm ( Black) - 2 x 150 microns
011 Surface Preparation Above Water Area (a) Carry out surface preparation with mechanical cleaning on above water area to ST 3 standard under the suprvision of paint OEM.
011 Surface Preparation Above Water Area (b) Carry out surface preparation with mechanical cleaning on above water area to ST 1 standard under the suprvision of paint OEM.
012 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
012 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
012 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
012 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
013 Surface Preparation Weather Decks and Fittings (a) Carry out Spot blasting to SA 2.5 standards as per survey report of Paint OEM for paint application for entire weather deck.
014 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
014 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
014 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
015 Surface Preparation Internal Tanks (a) Carry out mechanical cleaning to ST3 standard at paint defective area/ as survey report of Paint OEM for paint application.
015 Surface Preparation Internal Tanks (b) Carry out mechanical cleaning to ST1 standard at paint defective area/ as survey report of Paint OEM for paint application.
016 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
016 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
016 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive Balloxy (HB light) - 150 microns
017 Deck Fitting (a) Twin bollards on weather deck corroded/thinned/perished , to be Repair / Renewal as per survey reports (mat. - MS) 400mmx800mmx08mm base, 600mmx200mmx08mm "U" plate, 250mmx160mmx06mm Pipes, 400mmx25mm stag horns (rods)
017 Deck Fitting (b) MS Cleats on weather deck including locking pins perished/ uprooted to be repaired / renewed (mat MS) as per survey reports. MAT-MS.
017 Deck Fitting Carry out load testing of twin bolllrads (c) Load testing of Securing eyes post welding (Test load to be applied 7.5 T, SWL 3.0T)
018 Manhole cover (a) Manhole cover neoprene rubber joints perished, to be renewed (Rubber joint size: - 520mm x 760mm x08 mm)
018 Manhole cover (b) Manhole cover including coamings perihsed/ thinned to be renewed as per survey report (approx size - 3'x1'8")
018 Manhole securing arrangment c) Manhole Stud nut and bolts with washers corroded/ perished to be renewed.(Size of Stud Bolt -16 mm x 50mm length, 32 nos on each manhole, Mat SS).
019 Manhole cover Handle of manhole covers corroded/thinned, to be renewed, (Mat-MS rod,12 mm thick
020 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Internal Tank
021 D Type rubber Fenders -Horizontal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 (a) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1400 mm (03 + 03 both side) in 5.0 mtrs length and 1400 mm (1+1 both side) in 2.0 mtrs width
021 D Type rubber Fenders -Vertical fenders D" Shaped rubber fenders perished/cracked, to be renewed,as per NES 170 (b) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber size -850 x250 X70 mm
022 Fenders Brackets - Horizontal Horizontal Fender securing brackets (Flat bars including ms pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed Thickenss of the brackets 12 mm, 1400 X 130mm
022 D Type rubber Fenders -vertcal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 800 mm at corner
022 Fenders Brackets -vertical vertical Fender securing brackets (Flat bars including ms pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed Thickenss of the brackets 12 mm, 1000 X 130mm
023 Lifting eye Lifting eye corroded/thinned/perished to be renewed as per survey reports (a) Thickness of rod 40mm, outer dia of ring 07 seven, base size 9"x5"x12mm doubler plate size 14"x11"x20mm
023 Lifting eye (b) Load testing of lifting eyes is to be carried out post renewel /repaired if any (Test load to be applied 7.5 T, SWL 3.0T)
024 Dead weight Renew damaged dead weights approx size 350x350x350 mm weight 40 kgs each / mat cement
SOW- IN ASSET - 2 (04x03x01 mtrs) 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) slipway).
002 Hull Cleaning Under Water and Boot Top Area HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/ barnacles andpresent for survey (approx weight of pontoon - 10 Tons). (a) U/W area: 15 Sqm (b) Boot Top area: 5 Sqm
002 Hull Cleaning Above Water Area (a) Clean the entire above water area with HP Jet washing (with a pressure not exceeding 3000 PSI) to remove salts and contaminants from the surface I.A.W. No 01/15 and present for survey
002 Hull Cleaning Weather deck (b) Clean the entire weather deck including fittings area with HP Jet washing (not exceeding 3000 PSI) to remove salts and contaminants from the surface. I.A.W. No 01/15 and present for survey
002 Hull Cleaning Tanks (c) Manually clean internal tanks i.a.w. No 01/15 and present for survey. The tanks should be washed out with fresh water and soap water to remoeve any sediment or dirt present in the tank
003 Hull survey External and Internal Hull survey. Hull survey. Carry out visual and hammer survey/UTG survey in accordance with NO 19/06 of under water hull, boot top, above water hull, weather decks and all internal tanks etc, all stiffeners and deck fittings including lifting hooks/eyes. All manholes to be inspected and repaired to ensure water tightness, chalk impression test to be carried out. Approx area: 100 Sqm
004 UTG Survey . Quote for UTG survey points at U/W hull,above water, weather deck and covering entire part of hull.
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, renewal of all obstructions in way of steel renewals including minor fittings with their foundations, etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc.
006 Build ups (a) Carry out build ups as indicated by the Hull survey team/ Surveyor Approx size 25x25 mm-100
006 Build ups (b) Carry out build ups as indicated by the Hull survey team/ Surveyor Approx size 50x50 mm-100
006 Build ups (c) Carry out build ups as indicated by the Hull survey team/ Surveyor Approx size 100x100 mm-100
007 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
008 Sacrificial Anodes (a) Renew Sacrificial anodes (MK II) those consumed more than 50% Note:- Anodes Navy/COY supply.
009 Surface preparation with Grit Blasting Under Water area including Boot top area (a) Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
009 Surface preparation with Grit Blasting Under Water area including Boot top area (b) Sweep blasting to SA 1 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red)
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red/black)
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum specturm ( Black) - 2 x 150 microns
011 Surface Preparation Above Water Area (a) Carry out surface preparation with mechanical cleaning on above water area to ST 3 standard under the suprvision of paint OEM.
011 Surface Preparation Above Water Area (b) Carry out surface preparation with mechanical cleaning on above water area to ST 1 standard under the suprvision of paint OEM.
012 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
012 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
012 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
012 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
013 Surface Preparation Weather Decks and Fittings (a) Carry out Spot blasting to SA 2.5 standards as per survey report of Paint OEM for paint application for entire weather deck.
014 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
014 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
014 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
015 Surface Preparation Internal Tanks Carry out mechanical cleaning to ST3 standard at paint defective area/ as survey report of Paint OEM for paint application.
016 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
016 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
016 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive Balloxy (HB light) - 150 microns
017 Deck Fitting (a) Twin bollards on weather deck corroded/thinned/perished , to be Repair / Renewal as per survey reports (mat. - MS) 400mmx800mmx08mm base, 600mmx200mmx08mm "U" plate, 250mmx160mmx06mm Pipes, 400mmx25mm stag horns (rods)
017 Deck Fitting (b)MS Cleats on weather deck including locking pins perished/ uprooted to be repaired / renewed (mat MS) as per survey reports. MAT-MS.
017 Deck Fitting Carry out load testing of twin bolllrads (c) Load testing of Securing eyes post welding (Test load to be applied 7.5 T, SWL 3.0T)
018 Manhole cover (a) Manhole cover neoprene rubber joints perished, to be renewed (Rubber joint size: - 520mm x 760mm x08 mm)
018 Manhole cover (b) Manhole cover including coamings perihsed/ thinned to be renewed as per survey report (approx size - 3'x1'8")
018 Manhole securing arrangment c) Manhole Stud nut and bolts with washers corroded/ perished to be renewed.(Size of Stud Bolt -16 mm x 50mm length, 32 nos on each manhole, Mat SS).
019 Manhole cover Handle of manhole covers corroded/thinned, to be renewed, (Mat-MS rod,12 mm thick
020 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Internal Tank
021 D Type rubber Fenders -Horizontal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 (a) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1400 mm (02 + 02 both side) in 3.0 mtrs side and 1400 mm(3+3 both side) in 4.0 mtrs side
022 Fenders Brackets - Horizontal Horizontal Fender securing brackets (Flat bars including ms pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed (a)Thickenss of the brackets 12 mm, 1400 X 130mm
022 D Type rubber Fenders -vertcal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 850 x250 X70 mm at corner
022 Fenders Brackets -vertical vertical Fender securing brackets (Flat bars including ms pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed Thickenss of the brackets 12 mm, 1000 X 130mm
023 Lifting eye Lifting eye corroded/thinned/perished to be renewed as per survey reports (a) Thickness of rod 40mm, outer dia of ring 07 seven, base size 9"x5"x12mm doubler plate size 14"x11"x20mm
023 Lifting eye (b) Load testing of lifting eyes is to be carried out post sunewel /repaired if any (Test load to be applied 7.5 T, SWL 3.0T)
024 Dead weight Renew damaged dead weights approx size 350x350x350 mm weight 40 kgs each / mat cement
SOW- IN ASSET - 3 (04x03x01 mtrs) 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) slipway).
002 Hull Cleaning Under Water and Boot Top Area HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/ barnacles andpresent for survey (approx weight of pontoon - 10 Tons). (a) U/W area: 15 Sqm (b) Boot Top area: 5 Sqm
002 Hull Cleaning Above Water Area a) Clean the entire above water area with HP Jet washing (with a pressure not exceeding 3000 PSI) to remove salts and contaminants from the surface I.A.W. No 01/15 and present for survey
002 Hull Cleaning Weather deck (b) Clean the entire weather deck including fittings area with HP Jet washing (not exceeding 3000 PSI) to remove salts and contaminants from the surface. I.A.W. No 01/15 and present for survey
002 Hull Cleaning Tanks (c) Manually clean internal tanks i.a.w. No 01/15 and present for survey. The tanks should be washed out with fresh water and soap water to remoeve any sediment or dirt present in the tank
003 Hull survey External and Internal Hull survey. Hull survey. Carry out visual and hammer survey/UTG survey in accordance with NO 19/06 of under water hull, boot top, above water hull, weather decks and all internal tanks etc, all stiffeners and deck fittings including lifting hooks/eyes. All manholes to be inspected and repaired to ensure water tightness, chalk impression test to be carried out. Approx area: 100 Sqm
004 UTG Survey .Quote for UTG survey points at U/W hull,above water, weather deck and covering entire part of hull.
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, renewal of all obstructions in way of steel renewals including minor fittings with their foundations, etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc.
006 Build ups (a) Carry out build ups as indicated by the Hull survey team/ Surveyor Approx size 25x25 mm-100
006 Build ups (b) Carry out build ups as indicated by the Hull survey team/ Surveyor Approx size 50x50 mm-100
006 Build ups (c) Carry out build ups as indicated by the Hull survey team/ Surveyor Approx size 100x100 mm-100
007 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
008 Sacrificial Anodes (a) Renew Sacrificial anodes (MK II) those consumed more than 50% Note:- Anodes Navy/COY supply.
009 Surface preparation with Grit Blasting Under Water area including Boot top area (a) Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
009 Surface preparation with Grit Blasting Under Water area including Boot top area (b) Sweep blasting to SA 1 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red)
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red/black)
010 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum specturm ( Black) - 150 microns
011 Surface Preparation Above Water Area (a) Carry out surface preparation with mechanical cleaning on above water area to ST 3 standard under the suprvision of paint OEM.
011 Surface Preparation Above Water Area (b) Carry out surface preparation with mechanical cleaning on above water area to ST 1 standard under the suprvision of paint OEM.
012 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
012 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
012 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
012 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
013 Surface Preparation Weather Decks and Fittings (a) Carry out Spot blasting to SA 2.5 standards as per survey report of Paint OEM for paint application for entire weather deck.
014 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
014 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
014 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
015 Surface Preparation Internal Tanks Carry out mechanical cleaning to ST3 standard at paint defective area/ as survey report of Paint OEM for paint application.
016 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
016 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
016 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive Balloxy (HB light) - 150 microns
017 Deck Fitting (a) Twin bollards on weather deck corroded/thinned/perished , to be Repair / Renewal as per survey reports (mat. - MS) 400mmx800mmx08mm base, 600mmx200mmx08mm "U" plate, 250mmx160mmx06mm Pipes, 400mmx25mm stag horns (rods)
017 Deck Fitting (b)MS Cleats on weather deck including locking pins perished/ uprooted to be repaired / renewed (mat MS) as per survey reports. MAT-MS.
017 Deck Fitting Carry out load testing of twin bolllrads (c) Load testing of Securing eyes post welding (Test load to be applied 7.5 T, SWL 3.0T)
018 Manhole cover (a) Manhole cover neoprene rubber joints perished, to be renewed (Rubber joint size: - 520mm x 760mm x08 mm)
018 Manhole cover (b) Manhole cover including coamings perihsed/ thinned to be renewed as per survey report (approx size - 3'x1'8")
018 Manhole securing arrangment c) Manhole Stud nut and bolts with washers corroded/ perished to be renewed.(Size of Stud Bolt -16 mm x 50mm length, 32 nos on each manhole, Mat SS).
019 Manhole cover Handle of manhole covers corroded/thinned, to be renewed, (Mat-MS rod,12 mm thick
020 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Internal Tank
021 D Type rubber Fenders -Horizontal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 (a) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1200 mm (02 + 02 both side) in 3.0 mtrs side and 1200 mm(3+3 both side) in 4.0 mtrs side
022 Fenders Brackets - Horizontal Horizontal Fender securing brackets (Flat bars including ms pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed (a)Thickenss of the brackets 12 mm, 1400 X 130mm
022 D Type rubber Fenders -vertcal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 850 x250 X70 mm at corner
022 Fenders Brackets -vertical vertical Fender securing brackets (Flat bars including ms pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed Thickenss of the brackets 12 mm, 1000 X 130mm
023 Lifting eye Lifting eye corroded/thinned/perished to be renewed as per survey reports (a) Thickness of rod 40mm, outer dia of ring 07 seven, base size 9"x5"x12mm doubler plate size 14"x11"x20mm
023 Lifting eye (b) Load testing of lifting eyes is to be carried out post sunewel /repaired if any (Test load to be applied 7.5 T, SWL 3.0T)
024 Dead weight Renew damaged dead weights approx size 350x350x350 mm weight 40 kgs each / mat cement
DRY DOCK AND ALLIED SERVICES WORK PACKAGE (A) Docking and undocking charges (Both Versions) Firm not to quote. Docking and Undocking will be done by Navy in Navy Permises i.e ND(V) /slipway.
(B) Dock blocks preparation & laying out as per docking plan Firm not to quote. Job will be done by Navy .
Quote for maintenance of two in no. fire lines for the refit duration . Firm to quote.
Provision of two transports (cars) for entire refit duration (one for refit Co-ordinating staff and one for ND(V) monitoring Team) for 12 hrs or 100KM/day whichever is less Firm to quote.
Provision of stationory / office items for ND(V) / Refit monitoring team for entire refit duration period. Cater budget of Rs 2000/- per month. Requirement will be intimated RMT/ NDV on as requirement basis. Payment at actuals. Note:- firms to quote. Firm to quote.
QC inspection for the entire scope of work by third party IRS/LRS/ABS/QC/TPI for the refit duration as per the QIS. Firm not to quote. Services will be provided by ND(V)/QC
avisan engineering enterprises
WINTECH ENGINEERING WORKS
Sadhav Offshore Engineering Company
SAGAR SHIP REPAIRERS AND MARINE SERVICES
India Maritime Services
MANIMADHAVI ENTERPRISES
ADHYANTA ENGINEERING PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .