| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.0 L+₹2,700 (0.92%)Rejected-Finance 164 HIRANI NAGAR OPP SIDDHI VINAYAK TEMPLE MADHAPAR KUTCH 370 020 | KACHCHH | GUJARAT | 370020 | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹3.0 L+₹4,650 (1.59%)Rejected-Finance | L3 | Rejected-Finance Not L1 | |
| 4 | L4₹3.0 L+₹6,200 (2.12%)Rejected-Finance | L4 | Rejected-Finance Not L1 | |
| 5 | L5₹3.0 L+₹8,700 (2.97%)Rejected-Finance | L5 | Rejected-Finance Not L1 |
Tender Value
₹2.9 L
Closing Date
31 Dec 2019, 1:00 pmClosed
Maj GS Pandey, GE (AF) Bhuj
GE (AF) Bhuj Bhuj-Kutch PIN 370001
Maintenance and cleaning of Duct installed in central Air conditioning plant at AF Stn Bhuj
2019_MES_308447_1
3020/eQ/68/19-20/E3
Limited
Job Works
Item Rate
30 days
GE (AF) Bhuj
The firm must be registered with HQ CWE(AF) Bhuj as approved supplier to carryout general order supply and job work
1 document required · 1 mandatory
₹0
Exempted
23 Feb 2021
21 Dec 2019
1 Jan 2020
21 Dec 2019
31 Dec 2019
21 Dec 2019
Amount
(a) Dismantling and opening of GI sheet ducting from AHU for cleaning, de-scaling complete with automatic cleaning system comprising of air compressor, vacuum unit, duct cleaning equipment. Cleaning of duct is to be started from AHU to different branches in different rooms. All the grills and diffusers are including opening of false ceiling if required and re-fixing the same and fixing of duct by proper clamps, nuts bolts all as specified and directed for the following AC plants (680.00 Sq meter):- (i) Safety equipment section. (ii) Simulator section. (iii) Signal Section. (iv) Avoinics lab. (v) 777 SU. Note:- (i) After cleaning the ducts testing leakage to be carried out and duct to be made leak proof as per original. (ii) Duct cleaning should be done with the help of imported " Abatement" technology equipment involving high power vaccuum 2500 having "HEPA" filter, air compressor, robotic camera, air hammer, special nozzles, and air sweep with other required accessories. (iii) If the ducting is required to be repaired at site the contractor shall repair the same & the rate is deemed to be included in unit rate quoted. Note :- All material, labour and T&P required to complete the job is responsibility of the firm.
Pelectricals
Hi-Tech Systems
M/s Samarpan Enterprise
Hariom Traders
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_345640.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .