Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹20.1 Laccepted-aoc | accepted-aoc |
Tender Value
₹20.1 L
EMD Value
₹20,119
Closing Date
20 Aug 2026, 4:30 pmClosed
Executive Engineer, RWS&S Division, Tenali
Near Upparapalem Railway gate,Akaber pet, Bapatla
Providing CC Drain from SVRM College Quarters to Goddumothu Canal at Anajaneyaswamy temple of Nagaram GP of Nagaram Mandal in Bapatla District.Est.Cost.25.00 Lakhs
976393
NIT No.21/05/15th Finance Tide Grant/2026-27/EE,RWS&S, Bapatla, Date: 04.08.2026
OPEN - NCB
Water Supply
BAPATLA, ANDHRA PRADESH
7 documents required · 7 mandatory
₹713
₹20,119
15 Oct 2026
13 Aug 2026
13 Aug 2026
Skilled labour, Machinery, braker and concrete saw cutter for Cutting open CC road Surface and depositing the on banks with an initial lead and lift etc., complete.for cutting of CC Ramps & others
Unskilled labour charges for Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including.For Earth Work
Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH.For Sand Filling
Cement Concrete Nominal Mix (1:3:6) 40 mm HBG Metal 60% including cost of all materials and labour charges etc,, complete -1 cum with 4 Machine mixing for CC Bed including conveyance, seigonarage of materials of sand &metal etc. complete.for CC Drain Bed
Vibrated Cement Concrete (1:2:4) using 20mm HBG metal 60% and 12mm HBG metal 40% including cost of all materials and labour charges etc,, complete -1 cum with Machine mixing for side walls & CC Drain Top Slab Covers of drains including conveyance, seigonarage of materials etc complete.For CC Drain Sidewalls
Reinforced Vibrated Cement Concrete (1:2:4) using 20mm HBG metal 60% and 12mm HBG metal 40% including cost of all materials and labour charges etc,,complete -1 cum with Machine mixing for CC Drain Top Slab Covers of drains including conveyance, seigonarage of materials etc complete.for CC Drain Top Slap Covers
Pre measurements of iron grill with binding wire, including cost and conveyance of steel, bindning wire and fabrication charges etc, complete.steel 110 kgs per cum(approx) for Top Slabs
Plastering with CM(1:5) 12mm thick including cost and conveyance of all materials and labour charges etc complete
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQItemswb.xlsx
TENDER_DOCUMENT • 0.02 MB
Technical specification Vol-II (1).doc
TENDER_DOCUMENT • 0.13 MB
Vol-I (1).doc
TENDER_DOCUMENT • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .