Tender Value
₹94.6 L
EMD Value
₹1.3 L
Closing Date
3 Sept 2026, 10:30 am
Executive Engineer
HP City Transport and Bus Stand Management And Development Authority Tutikandi Shimla -4
SH Construction of G.I cover sheet shed cover for 2 Nos Fast Charger Dug Ware house etc Under RIDF XXX
2026_BSMDA_140939_2
No HPBSMDA/EE(2) 2025-2026 Tender Vol-V
Open Tender
Civil Works
Item Rate
180 days
Dehra
Please refer tender document
9 documents required · 9 mandatory
₹2,360
HPBSMDA
₹1.3 L
11 Aug 2026
11 Aug 2026
3 Sept 2026
12 Aug 2026
3 Sept 2026
12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Demolishing cement concrete manually/ by mechanical means including disposal of material upto approved dumping site. Nominal concrete 1:4:8 (One isto Four isto Eight) or leaner mix (i/c equivalent design mix), including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 70.85 | Per Cubic Meter | 100 | ₹7,085 |
| 2.01 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within all leads of: G.S. Sheet, (Dismantled sheets etc. to be handred over the Deptt.) including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 229.8 | Per Square Meter | 100 | ₹22,980 |
| 3.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m (One point five meter) in width or 10 sqm (Ten square meter) on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m (One point five meter), including getting out the excavated soil and disposal of surplus excavated soil upto approved dumping site. All kinds of soil, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 188.82 | Per Cubic Meter | 10 | ₹1,888.2 |
| 4.01 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm (Twenty centimeter) in depth, breaking clods, watering, rolling each layer with ½ (Half) tonne roller or wooden or steel rammers, and rolling every 3rd and topmost layer with power roller of minimum 8 (Eight) tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, : All kinds of soil, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 0.72 | Per Cubic Meter | 10 | ₹7.2 |
| 5.01 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m (One point five meter) in width or 10 sqm (Ten square meter) on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m (One point five meter) , including getting out the excavated soil and disposal of surplus excavated soil up to approved dumping site, : Ordinary rock, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 134.58 | Per Cubic Meter | 10 | ₹1,345.8 |
| 6.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (One Cement isto Four coarse sand isto Eight graded stone aggregate ) 40 mm (Forty milimeter) nominal size , including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 83.35 | Per Cubic Meter | 10 | ₹833.5 |
| 7.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (One Cement isto Three coarse sand isto Six graded stone aggregate) 40 mm (Forty milimeter) nominal size including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 42.98 | Per Cubic Meter | 10 | ₹429.8 |
| 8.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (One Cement isto Three coarse sand isto Six graded stone aggregate) 20 mm (Twenty milimeter) nominal size including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 72.11 | Per Cubic Meter | 10 | ₹721.1 |
| 9.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (One cement isto Two coarse sand isto Four graded stone aggregate) 20 mm (Twenty milimeter) nominal size nominal size including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 0.72 | Per Cubic Meter | 10 | ₹7.2 |
| 10.01 | Providing and laying in position specified grade of reinforced cement concrete Mechnically Mixed and vibrated, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :- 1:1.5:3 (One Cement isto One point five coarse sand isto Three graded stone aggregate) 20 mm (Twenty milimeter) nominal size, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 167.38 | Per Cubic Meter | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
SBD2.pdf
Tender Documents • 4.00 MB
BOQ_209154.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].