Loading…
Loading…
8 results • Latest
SH Providing E.I therein.
Wiring for light point / fan point / exhaust fan / call bell point with 1.5 Sq. mm. PVC insulated heat resistant flame retardant (HRFR) and low smoke single core (flexible) copper conductor cable in surface/recessed PVC conduit and earthing the light point with 1.5 Sq.mm. HRFRLS/PVC insulated single core copper conductor cable as required..Group A
SH Providing E.I. therein.
Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable etc. as required. Group C
SH Providing E.I. therein.
Wiring for light point / fan point / exhaust fan / call bell point with 1.5 Sq. mm. PVC insulated heat resistant flame retardant (HRFR) and low smoke single core (flexible) copper conductor cable in surface/recessed PVC conduit and earthing the light point with 1.5 Sq.mm. HRFRLS/PVC insulated single core copper conductor cable as required. Group C
SH Providing R.C.C drain in front and back side)
Demolishing cement concrete manually/ by mechanical means :-nominal concrete 1:3:6 or richer mix (i/c equivalent design mix including disposal of material within all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
SH Providing E.I. therein.
Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable etc. as required. Group C
SH C/O New washing dug etc.
Earth work in excavation by mechanical means(Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth all leads and lifts . All kinds of soil , including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.