Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance PLOT NO 195 QUAY STREET OPP NAGINA HOTEL DARUKHANA REAY ROAD EAST MUMBAI MAHARASHTRA 400010 | MUMBAI SUBURBAN | MAHARASHTRA | 400010 | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Technically Disqualified |
| 5 | Rejected-Technical | Rejected-Technical Technically Disqualified |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
29 May 2020, 11:00 amClosed
LT CDR ANOOP KRISHNAN
FLEET MAINTENANCE UNIT, VISAKHAPATNAM 530014
REPAIR RATE CONTRACT FOR CHEMICAL CLEANING OF HE/ATUS, COOLERS, CONDENSERS AND AC CHILLERS FITTED ONBOARD ENC SHIPS
2020_NAVY_342855_1
PC/301/HE DATED 05/05/2020
Open Tender
Marine Services
Buy
1095 days
FLEET MAINTENANCE UNIT, VISAKHAPATNAM
AS PER RFP
5 documents required · 5 mandatory
₹0
₹60,000
Yes
FLEET MAINTENANCE UNIT, VISAKHAPATNAM
11 Nov 2020
5 May 2020
30 May 2020
5 May 2020
29 May 2020
5 May 2020
5 May 2020 - 27 May 2020
18 May 2020
Amount
First Year
Services
HE and ATU - Capacity up to 0.025
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.025 to 0.05
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.5 and Above
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.1 to 0.3
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.3 to 0.5
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.5 and Above
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
Condenser/Chillers - Capacity up to 0.025
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.025 to 0.05
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.05 to 0.1
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.1 to 0.3
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.3 to 0.5
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.5 and Above
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity up to 0.025
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.025 to 0.05
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.05 to 0.1
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.1 to 0.3
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.3 to 0.5
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.5 and Above
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5
HEs and ATUs
AC Condenser and Chillers
Manufacturing & Fitment of zinc protector with adaptor Capacity from 0.5 and Above
HEs and ATUs
AC Condenser and Chillers
Spares
HE’s and ATU’s - Capacity up to 0.025
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.025 to 0.05
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.05 to 0.1
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.1 to 0.3
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.3 to 0.5
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.5 and above
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity up to 0.025
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.025 to 0.05
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.05 to 0.1
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.1 to 0.3
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.3 to 0.5
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.5 and Above
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from up to 0.025
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.025 to 0.05
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.05 to 0.1
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.1 to 0.3
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.3 to 0.5
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.5 and Above
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5
HEs and ATUs
AC Condenser and Chillers
Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.5 and Above
HEs and ATUs
AC Condenser and Chillers
Second Year
Services
HE and ATU - Capacity up to 0.025
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.025 to 0.05
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.5 and Above
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.1 to 0.3
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.3 to 0.5
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.5 and Above
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
Condenser/Chillers - Capacity up to 0.025
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.025 to 0.05
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.05 to 0.1
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.1 to 0.3
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.3 to 0.5
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.5 and Above
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity up to 0.025
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.025 to 0.05
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.05 to 0.1
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.1 to 0.3
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.3 to 0.5
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.5 and Above
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5
HEs and ATUs
AC Condenser and Chillers
Manufacturing & Fitment of zinc protector with adaptor Capacity from 0.5 and Above
HEs and ATUs
AC Condenser and Chillers
Spares
HE’s and ATU’s - Capacity up to 0.025
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.025 to 0.05
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.05 to 0.1
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.1 to 0.3
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.3 to 0.5
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.5 and above
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity up to 0.025
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.025 to 0.05
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.05 to 0.1
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.1 to 0.3
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.3 to 0.5
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.5 and Above
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from up to 0.025
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.025 to 0.05
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.05 to 0.1
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.1 to 0.3
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.3 to 0.5
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.5 and Above
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5
HEs and ATUs
AC Condenser and Chillers
Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.5 and Above
HEs and ATUs
AC Condenser and Chillers
Third Year
Services
HE and ATU - Capacity up to 0.025
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.025 to 0.05
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.5 and Above
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.1 to 0.3
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.3 to 0.5
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
HE and ATU - Capacity from 0.5 and Above
Removal of ATU/HE including de-lagging, disconnecting associated pipelines
Mechanical Cleaning - Air Side
Chemical Cleaning - Air Side (chemical provided by firm)
Chemical Cleaning - Water Side (chemical provided by firm)
Pressure Testing
Fitment of ATU/HE including associated system pipelines and proving of system onboard
Drilling and Tapping
Manufacturing of Flange
Repair by Welding and Brazing of ATU/HE end cover
Plugging of tube including manufacturing of Plug (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning
INSITU mechanical cleaning - Air Side
INSITU chemical cleaning - Air Side (provided by firm)
INSITU chemical cleaning - Water
Fitment of ATU/HE including associated system onboard
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)
Transportation from Ship to FMU site and back
Neutralizing of ATU/HE after chemical cleaning
Blanking of system pipeline
Condenser/Chillers - Capacity up to 0.025
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.025 to 0.05
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.05 to 0.1
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.1 to 0.3
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.3 to 0.5
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Condenser/Chillers - Capacity from 0.5 and Above
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)
Mechanical Cleaning - Water Side
Chemical Cleaning - Water Side (provided by firm)
Mechanical Cleaning - Gas Side
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Repair by welding and brazing of condenser end cover
Plugging of tube including manufacturing of plug (provided by firm)
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity up to 0.025
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.025 to 0.05
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.05 to 0.1
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.1 to 0.3
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.3 to 0.5
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Coolers - Capacity from 0.5 and Above
Removal of Cooler including associated system pipelines
F/W Cooler - Chemical cleaning (provided by firm)
F/W Cooler - Mechanical cleaning
Lub Oil Cooler - Chemical cleaning (provided by firm)
Radiator mechanical cleaning
Radiator chemical cleaning (provided by firm)
CPP Cooler - Chemical cleaning (provided by firm)
General Cooler - Mechanical cleaning
Generator Cooler - Chemical cleaning (provided by firm)
Hydraulic Cooler - Chemical cleaning (provided by firm)
Gear Box Cooler - Chemical cleaning (provided by firm)
Air Compressor / Cooling Coil chemical cleaning (provided by firm)
Fitment of cooler including associated chillers pipeline and proving the system onboard
Drilling and Tapping
Plugging of tube including manufacturing of plug (provided by firm)
Repair by welding and brazing of condenser end cover
Cold repair by putty (DEVCON / BELZONA) (provided by firm)
Removal of associated system pipeline for INSITU cleaning of fresh water Cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Chemical cleaning of cooler (provided by firm)
Mechanical cleaning of cooler
Pressure testing of cooler INSITU
Pressure testing of cooler at shop floor
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler
Painting of ATU/HE (with red oxide and enamel paints) (provided by firm)
Transportation from Ship to FMU site and back
Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5
HEs and ATUs
AC Condenser and Chillers
Manufacturing & Fitment of zinc protector with adaptor Capacity from 0.5 and Above
HEs and ATUs
AC Condenser and Chillers
Spares
HE’s and ATU’s - Capacity up to 0.025
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.025 to 0.05
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.05 to 0.1
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.1 to 0.3
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.3 to 0.5
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
HE’s and ATU’s - Capacity from 0.5 and above
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity up to 0.025
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.025 to 0.05
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.05 to 0.1
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.1 to 0.3
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.3 to 0.5
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Condenser/Chillers - Capacity from 0.5 and Above
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from up to 0.025
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.025 to 0.05
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.05 to 0.1
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.1 to 0.3
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.3 to 0.5
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Coolers - Capacity from 0.5 and Above
Renewal of Joint/Gasket (provided by firm)
Renewal of Fasteners as required (Brass) (provided by firm)
Renewal of Fasteners as required (SS) (provided by firm)
Renewal of Fastener as required (MS) (provided by firm)
Cold repair by putty (DEVCON/BELZONA) (provided by firm)
Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5
HEs and ATUs
AC Condenser and Chillers
Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.5 and Above
HEs and ATUs
AC Condenser and Chillers
POONAM ENTERPRISES
ULTRA MARINE
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .